none 39324 Guía de instalación

Tipo
Guía de instalación

Este manual también es adecuado para

© 2006 American Shower & Bath Corporation 1
Model No:_____________________________
Customer: Please record your model number. The model number is
found on the label located on the front panel of the box. It is very im-
portant to record your model number. This information is necessary
when contacting us.
Please retain this manual for future reference. A list of repair parts is
included.
Important: Read these instructions before starting installation. In-
stallation must be at a temperature near 60°F (16°C). Do not install in
unheated areas where the temperature may drop below 32°F (0°C).
If you have any questions on the installation of this unit, please do
not return to the store where you purchased it.
For assistance, pleae call 1-800-355-ASB1 (2721), Monday to Thurs-
day, 8:30 am to 5:30 pm E.S.T. and Friday, 8:30 am to 3:30 pm E.S.T.
Please have this Installation manual available when calling. Or email
Important! These instructions include suggestions for rough con-
struction, drywall installation and plumbing installation that we be-
lieve to be reliable. Local building codes vary by location and could
supersede those suggestions. If you are not confident in your ability
to perform these tasks, you should use a professional installer or
contract out those tasks you need help with.
Be sure to check local building codes for product compliance before
installation.
Neo Shower
Installation Manual
Ducha Neo
Manual de Instalación
TOOLS AND MATERIALS REQUIRED
Installation requires common household tools and:
• Level & square • Tape measure • Hammer • Pencil
• Drill with 3/32” (2 mm), 1/8” (3 mm), & 3/16” (5mm) bits
• Hole saw (sized to accommodate plumbing fixtures)
• Screwdriver-phillips • 3/4” galvanized roofing nails
• 2x4 lumber for additional wall studs (if required)
• Two backer boards - See Illustration 2.
• Sub-floor panels or leveling compound to ensure floor is level and
square with walls
• Necessary water and drain line materials and fittings.
• Caulk gun
• One (1) 10.3 Fl. Oz. (304 ml) cartridge of latex/acrylic caulk
• Two (2) 10.5 Fl. Oz. (310 ml) cartridges of one of the following ap-
proved adhesives-
• ASB Adhesive & Caulk Kit
• Franklin MultiBond
• Macco Adhesives’ Liquid Nails for base Surrounds (LN-915)
• Dap 2000 Construction Adhesive
• Macklanburg-Duncan Adhesive (suitable for polystyrene)
Follow manufacturers’ instructions but allow at least 24 hours for
caulk and adhesive to set before using.
Modelo N°____________________________
Cliente: Escriba aquí su número de modelo. Lo puede encontrar en
la etiqueta, ubicada en el panel frontal de la caja. Es muy importante
anotar su número de modelo. Necesitará esta información cuando
nos llame.
Conserve este manual para referencia futura. Incluye una lista de
partes de repuesto.
¡Importante! Lea estas instrucciones antes de comenzar con la
instalación. La instalación debe realizarse a una temperatura
cercana a los 60°F (16°C). No lo instale en áreas sin calefacción
donde la temperatura pueda llegar por debajo de los 32°F (0°C).
Si tiene alguna pregunta referente a la instalación de esta unidad, no
se dirija a la tienda donde la haya comprado.
Para obtener ayuda, llame al 1-800-355-ASB1 (2721), de lunes a
jueves, de 8:30 a 17:30 EST y los viernes de 8:00 a 15:30 EST. Tenga
este manual de instalación a mano cuando llame. También puede
escribirnos a [email protected].
¡Importante! Estas instrucciones incluyen sugerencias para la
construcción inicial, instalación de los paneles de pared y la
cañería que creemos que es confiable. Las normas de construcción
locales varían en cada lugar y pueden tener precedencia sobre
estas sugerencias. Si no cree tener la habilidad necesaria para
realizar estas tareas, debería usar un instalador profesional o
subcontratar las tareas para las que necesite ayuda.
Asegúrese de verificar las normas locales de construcción para este
producto antes de instalarlo.
HERRAMIENTAS Y MATERIALES NECESARIOS
La instalación requiere herramientas hogareñas comunes y:
• Nivel y escuadra • Cinta métrica • Martillo • Lápiz
• Taladro con mecha de 3/32” (2mm), 1/8” (3mm) y 3/16” (5mm)
• Sierra para agujeros (del tamaño necesario para las cañerías)
• Destornillador en cruz • Clavos galvanizados para techo de 3/4”
• Maderas de 2”x 4” para montantes adicionales para la pared
(si es necesario)
• Dos tableros de respaldo – Vea la ilustración 2 por detalles.
• Paneles de contrapiso o material de relleno para asegurar que el
piso esté nivelado y a escuadra con las paredes.
• Materiales y acoples necesarios para las cañerías de agua y
desagüe.
• Pistola para calafatear
• Un (1) cartucho de 10,3 onzas (304ml) de calafateado látex/acrílico
• Dos (2) cartuchos de 10,5 onzas (310ml) de uno de los siguientes
adhesivos aprobados-
• Juego de adhesivo ASB y de calafatear
• Adhesivo Multiuso Franklin
• Adhesivo Clavos Líquidos de Macco para los bordes de la
Base (LN-915)
• Adhesivo Dap 2000 para la construcción
• Adhesivo Macklanburg-Duncan (para poli estireno)
Siga las instrucciones del fabricante pero espere por lo menos 24
horas para que se seque el calafateado y el pegamento antes de
usar.
American Shower & Bath
540 Glen Ave. • Moorestown, NJ 08057 • 1-800-355-ASB1 • Fax: 856-235-9262
www.asbcorp.com
2 P/N 27720 7/06
REQUIREMENTS FOR A SUCCESSFUL
INSTALLATION
1. Confirm that all components have been included before beginning
your installation. Please refer to the Parts List in this manual.
2. Walls must be solid, plumb and square. This unit has been de-
signed with some adjustability for minor alignment problems, but a
poor foundation will result in a poor installation.
3. During installation you have a choice to install the shower door
with a left-hand or right-hand opening. Note that door must swing
out.
4. Power screwdrivers are recommended only where indicated.
5. Follow manufacturers’ instructions but allow at least 24 hours for
caulk to set before using shower.
6. CAUTION: Tempered glass cannot be cut.
7. Read these instructions and confirm that base will fit in the in-
tended corner before beginning installation.
8. The alcove wall studs should be located as shown in Illustra-
tion 1 and be plumb. If the studs are not plumb, shimming may be
required. It is important that studs are located as shown. If you are
remodeling, and a stud is not at that exact location, add a new one.
Other studs should be located according to local building codes. A
2 x 4 x 68” backer board (*) must be mounted as shown in Illustra-
tion 1 and 2. This provides a solid attachement for enclosures.
• Rough plumbing must be installed before base and/or wall
panels. Illustration 2 shows suggested location of fixtures if new
plumbing is being installed. Provide an access panel on the back
side of the wall with the plumbing fixtures. If plumbing exists,
check that fixtures will clear base and panels. All plumbing must
meet local building codes.
• The base must be installed on a solid and level sub-floor that is
square with the wall studs. The base supports, which are built
into the shower support base, must sit directly on a level sub-
floor.
• If you are installing the shower base over a sub-floor other than
plywood, place padding between the base and sub-floor to pre-
vent squeaking. Recommended padding includes spun-bonded
landscape fabric or house wrap material. Use of other materials
may result in squeaking.
• Cut a portion from the carton to protect the base from damage
during installation.
• The base should not be installed in areas where the temperature
may drop below freezing (32
o
F or 0
o
C).
• Allow base to reach room temperature for 30 minutes before
installing.
Important: The wall studs must be plumb and square to the floor!
Inside corner must be square (Refer to Illustration 3).
9. Special installations:
• Above the floor drains
Create a platform of 2 x 4’s (or taller depending on drain require-
ments) to raise the entire base area and cover it with sub-flooring.
This platform must be level and square to the wall studs. When
installing plumbing, add platform height to the dimensions shown
in Illustration 2.
• Masonry walls
Construct a 2 x 6 stud wall for the plumbing end. Apply 2 x 2 furring
strips to the masonry wall in the same locations as the studs in
Illustration 1.
• Installation over greenboard or firewalls
If you are installing wall panels over greenboard and/or firewall
material, and not directly on the studs, your dimensions must take
into account the thickness of this material and measurements
should be taken from the inside of the finished walls.
REQUISITIOS PARA UNA INSTALACIÓN EXITOSA
1. Verifique que todos los componentes estén incluidos antes de
comenzar su instalación. Refiérase a la Lista de Partes de este
manual.
2. Las paredes deben ser sólidas, aplomadas y en escuadra. Esta
unidad ha sido diseñada para poder ajustar pequeños problemas
de alineación, pero una base deficiente producirá una mala insta-
lación.
3. Durante la instalación usted podrá elegir entre instalar la puerta
del gabinete abriéndose hacia la derecha o hacia la izquierda.
Note que la puerta debe abrirse hacia fuera.
4. Se recomienda el uso de destornilladores eléctricos únicamente
donde se indica.
5. Siga las instrucciones del fabricante pero espere por lo menos 24
horas para que se seque el calafateado antes de usar la ducha.
6. CUIDADO: El vidrio templado no se puede cortar.
7. Lea estas instrucciones y verifique que la base entre en la es-
quina antes de empezar la instalación.
8. Los montantes de las paredes deben estar ubicadas como se
muestra en la ilustración 1 y deben estar a escuadra. Si los mon-
tantes no están a escuadra, puede tener que acuñarlas. Es impor-
tante que los montantes estén en los lugares que se muestran. Si
está redecorando, y no hay una viga en el lugar exacto, agregue
una nueva. Los demás montantes deben ubicarse de acuerdo con
las normas locales de construcción. Deberá colocar un par de
tablas de refuerzo (*) de 2 x 4 x 68” como se muestra en las ilus-
traciones 1 y 2. Esto proporciona un soporte sólido para el recinto.
• La cañería deberá instalarse antes que la base y/o los paneles
de pared. La ilustración 2 muestra la ubicación sugerida al
instalar cañería nueva. Proporcione un panel de acceso en la
parte de atrás de la pared con las cañerías. Si la cañería ya
existe, verifique que deje suficiente lugar para la base y las
paredes. Todas las cañerías deben cumplir con las normas
locales de construcción.
• La base debe instalarse sobre un piso sólido y nivelado que esté
a escuadra con los montantes de las paredes. Los soportes
de la base, que están incorporados a la base de soporte de la
ducha, deben apoyar directamente sobre el piso nivelado.
• Si está instalando la base de la ducha en un piso que no sea
de contrachapado, coloque relleno entre la base y el piso para
evitar crujidos. El relleno recomendado incluye tela de jardin-
ería o material de recubrimiento para viviendas. Si usa otros
materiales podría causar crujidos.
• Corte una parte del cartón para proteger la base y que no se
dañe durante la instalación.
• No debe instalar la base en lugares donde la temperatura pueda
llegar a menos de 32
o
F (0
o
C).
• Permita que la base adquiera la temperatura ambiente durante
30 minutos antes de instalarla.
Importante: ¡Los montantes de la pared deben estar a escuadra
con el piso! El interior de la esquina debe estar a escuadra (ver
ilustración 3).
9. Instalaciones especiales:
• Acerca del desagüe del piso
Haga una plataforma con palos de 2” x 4” (o más alta, dependi-
endo de los requisitos del desagüe) para elevar toda la base y
cubrirla con el contrapiso). Esta plataforma debe estar nivelada y
a escuadra con los montantes de las paredes. Al instalar ca-
ñerías, eleve la plataforma hasta las dimensiones indicadas en la
ilustración 2.
• Paredes de mampostería
Construya una pared de durmientes de 2 x 6 para el extremo con
las cañerías. Coloque palos de 2 x 2 como costillaje en la pared
de mampostería en los mismos lugares que los montantes de la
ilustración 1.
© 2006 American Shower & Bath Corporation 3
• Instalación sobre paredes resistentes a la humedad (green-
board) o contra incendios
Si está instalando paneles de pared sobre paredes resistentes
a la humedad (greenboard) o contra incendios, sus mediciones
deben tener en cuenta el espesor de este material y deberá
hacerlas desde el interior de las paredes terminadas.
42"
12"
16"
15"
6-3/4
6-3/4"
15" 16"
12"
42"
8-1/4
81"
44"
7-1/2"
2 x 4 x68"
Additional stud
needed if end
of wall
Montantes
adicional
necesaria al
final de la pared
Drain cutout 5”
diameter Max.
Centered on drain
Corte para el desagüe
diámetro máximo de
5” Centrado en el
desagüe
Plumbing fixture on either wall
Cañerías en cualquiera de las
paredes
Stud placement and drain location
Reemplazo de montantes y
ubicación del desagüe
Additional stud
needed if end of wall
Montantes adicional
necesaria al final de
la pared
Illustration 1
Ilustración 1
Suggested rough plumbing locations
(right-hand installation shown)
Ubicación sugerida del desagüe
(se muestra la instalación a la derecha)
Illustration 2
Ilustración 2
Plumbing
backer board
Placas de
soporte de
cañerías
Shower head elbow
Codo de la ducha
Access panel location
Ubicación del panel
de acceso
Mixing valve
Válvula mezcladora
Each wall stud must be
plumb and square.
Cada una de los montantes
de la pared debe estar a
plomo y a escuadra
Illustration 3
Ilustración 3
4 P/N 27720 7/06
Parts List/Lista De Partes
Part
No.
/ No.
de
Parte
Description/Descripción
Quantity
/Cantidad
1
#6 x 1/2” SS Phil Panhead/Tornillo autoenroscante de acero inox, cab. plana, ranura en cruz
10
2
#8 x 1-1/4” SS Phil Panhead/Tornillo de acero inox, cab. plana, ranura en cruz
8
3
#8 x 1/2” Panhead Self-Drill/Tornillo autoperforante, cab. plana
31
4
#8 x 1-1/2” SS Phil Panhead/Tornillo de acero inox, cab. plana, ranura en cruz
8
5
Corner Post/Jamba de la puerta
2
6
Door Frame Side/ Listón lateral del bastidor de la puerta
2
7
Door Frame Top-Bottom/Listón superior/inferior del bastidor de la puerta
2
8
Door Glass/Vidrio de la Puerta
1
9
Handle/Manija
1
a. Glass Bushing/Separador para el Vidrio
2
b. Neo Handle Back ASM/Manija Interior Neo ASM
1
c. Neo Handle Front ASM/Manija Exterior Neo ASM
1
d. Neo Handle Gasket/Empaquetadura de Manija Neo
4
e. Neo Handle Pin/Clavija de Manija Neo
2
f. Neo Handle Plate/Arandela de Manija Neo
4
g. 1/4-20 x 1/4” Set Screw-Cup Point/Juego de Tornillos prisioneros
4
h. Screw/Tornillo
2
10
Header Bracket/Soporte de cabezal
4
11
Header Expander/Expansor de cabezal
2
12
Header-Door/cabezal de la Puerta
1
13
Header-PNL Left Panel/Travesaño del Panel Izquierdo
1
14
Header -PNL Right Panel/Travesaño del Panel Derecho
1
15
Door Latch/Retén de la puerta
2
16
Fixed Panel/Panel Fijo
2
17
Pivot Bushing/Buje del Pivote
2
18
Pivot Bracket/Soporte con Pivote
2
19
Wall Jamb/Jamba de la pared de la Pared
2
20 Sweep gasket/Sello inferior 1
21 Right Hand side panel/Panel lateral derecho 1
22 Left hand side panel/Panel lateral izquierdo 1
23 Base 1
24 Fastener pack/Paquete de fijadores 1
#8 x 1-1/4" (32mm)
2
#6 x 1/2" (12mm)
1
18
10
15
17
#8 x 1/2" (12mm)
3
#8 x 1-1/2" (32mm)
4
6 P/N 27720 7/06
Fije el desagüe a la base. Coloque la base en la esquina
(Figura 1). Verifique que la base esté bien apoyada sobre
una superficie nivelada y en escuadra con los montantes
de la pared. Se pueden hacer pequeños ajustes colocando
relleno en el soporte inferior. No debe quedar un espacio
de más de 1/8” entre la pestaña superior de la base y los
montantes de la pared. Si hace falta, saque la base de la
esquina, coloque el relleno que haga falta, vuelva a colocar
la base y verifique nuevamente. Repítalo según fuese sea
necesario.
Base Installation/Instalación de la Base
1
Attach drain to base. Position base in corner (Figure 1).
Check that base is sitting flat on floor and that it is level
and square to the wall studs. Minor adjustments can be
made by shimming the bottom support. There should be
no more than 1/8” gap between the top base flange and
the wall studs. If needed, remove the base from the cor-
ner, shim as required, reposition base, and check again.
Repeat as necessary.
Apply beads of adhesive on ridges in the base bottom
support. Reposition the base and press down firmly to
ensure good adhesive contact and recheck level. While
standing in the base, the top flange should be secured
with galvanized roofing nails at each stud location and
in two places on each side of the apron. There are two
methods in which you can secure the flange to the studs.
Option 1 - Install nails just above the flange so that the
large nail head holds the flange against the stud. Make
sure nail heads do not protrude as to interfere with the
walls when they are installed. Option 2 - Locate and drill
3/16” clearance holes in the center of the nailing flange
and centered on each stud. Hammer nails through each
hole and into the studs, securing the base.
2
If you are installing one of our matching wall sets, pro-
ceed with the “Wall Set Installation” instructions that
follow. If you are installing greenboard with another cov-
ering, leave a gap of 1/8” between the base ledge and the
wall material to help reduce the chance of water getting
into the wall board. When wall is finished, seal this gap
with latex/acrylic caulk (Figure 3).
Coloque adhesivo en los bordes de los soportes inferiores
de la base. Vuelva a colocar la base y presione hacia
abajo firmemente para asegurar que el adhesivo se apoye
bien y vuelva a verificar el nivelado. Mientras se para en
la base, fije la pestaña superior con clavos galvanizados
para techo en cada viga de pared y en dos lugares de
cada lado del borde. Puede fijar la pestaña a los mon-
tantes de dos formas distintas. Opción 1 – Coloque los
clavos justo sobre la brida de modo que la cabeza grande
del clavo sujete el ala contra la viga de la pared. Verifique
que las cabezas de los clavos no sobresalgan e interfi-
eran con las paredes al instalarlas. Opción 2 – Marque y
perfore agujeros de 3/16” en el centro del ala de sujeción
centrados en cada una de las vigas de la pared. Martille
los clavos en cada una de los montantes de la pared a
través de los agujeros para fijar la base.
Si está instalando uno de nuestros juegos de paredes,
prosiga con las instrucciones de “Instalación de del
Juego de Paneles para Pared” a continuación. Si está
instalando tablero verde con algún otro revestimiento,
deje una separación de 1/8” entre el borde de la base y
el material de la pared para evitar la posibilidad de que
el agua llegue a la pared. Cuando termine con la pared,
selle este espacio con calafateado látex/acrílico (Figura
1
3
2
3
Figure 1/Figura 1
Figure 2/Figura 2 Figure 3/Figura 3
Shower base flange
Brida de la base de la ducha
Option 1
Opción 1
Option 2
Opción 2
Stud
Montante
Nail
Clavo
Stud
Viga
Green Board
Wall covering
Revestimiento de pared
Caulk bead
Calafateado
Base
1/8” Gap
separación de 1/8”
© 2006 American Shower & Bath Corporation 7
Coloque los dos paneles de la forma en que irán en la es-
quina. Las bridas horizontales para clavado quedan sobre
ambos paneles. Descienda cada panel sobre las guías
del gabinte (Figura 1) para verificar que los paneles estén
alineados correctamente en la cavidad. Decida cual de
los paneles laterales necesitará cortar para las cañerías.
Ubique, marque y corte cuidadosamente los agujeros las
sierras cilíndricas de los tamaños adecuados.
Coloque sellador en las ranuras de los bordes de ambos
paneles. Arme los paneles izquierdo y derecho. Fíjelos
con tornillos, tuercas y arandelas en paquete de fijadores
(24) en 4 lugares (Figura 1). Verifique si entran antes de
proseguir.
Position the two wall panels as they will go into the cor-
ner. Horizontal nailing flanges will be located at the top of
both panels. Lower each panel onto the shower alignment
locators (Figure 1) to ensure that the panels are lined up
correctly in the alcove. Decide which side panel will need
cutouts for plumbing fixtures. Carefully locate, mark and
cut holes, using the proper size hole saw.
Apply caulk into recess in corners of both panels. As-
semble right and left panels. Secure with screws, nuts &
washers in fastener pack (24) in 4 places (Figure 1). Check
fit before proceeding.
Wall Set Installation/Instalación del juego de Paneles para Pared
1
1
When satisfied with fit, mark
the top of the panels on each
stud. Remove the panels. Ap-
ply a bead of adhesive down
each stud that will come in
contact with the back panel
being sure to stay below the
line you marked. You do not
need to apply adhesive to the
corner studs. Lay a bead of
latex/acrylic caulk along base
ledge (Figure 2). Reposition
panels and press firmly in
coner against studs.
2
3
Al terminar de colocarlos, marque la
parte superior de los paneles en cada
una montantes de la pared. Saque los
paneles. Coloque una línea de adhesivo
en cada montante que entrará en con-
tacto con el panel posterior mantenié-
ndose por debajo de la línea que acaba
de marcar. No necesita colocar adhe-
sivo en los montantes de las esquinas.
Coloque una línea de calafateado látex/
acrílico a lo largo del borde de la base
(Figura 2). Vuelva a colocar los paneles
y presiónelos firmemente en la esquina
contra los montantes de la pared.
2
3
Pencil line
Línea con lápiz
Adhesive bead
Capa de adhesivo
Figure 1/ Figura 1
Nut
Tuerca
Washers
Arandelas
Screw
Tornillo
Bottom has cut away
Parte inferior recotada
Caulk Bead
Calafateado
Figure 2/ Figura 2
4
Locate and drill a 3/16” hole in
the center of the nailing flange
at the top of the panel and
centered on each stud. Also
drill 3/16” holes in the front
nailing flange on each side
panel at approx. 12” intervals,
centered on the flange (Figure
3). Hammer 3/4” galvanized
roofing nails through each
hole and into the studs, secur-
ing the wall panel.
4
Marque y perfore un agujero de 3/16”
en el centro de la brida de fijación en
la parte superior del panel en el centro
de cada viga. Perfore también agujeros
de 3/16” en el ala de sujeción frontal de
cada panel lateral a intervalos de aprox-
imadamente 12” centrados en la brida
(Figura 3). Martille clavos galvanizados
de 3/4” para techo en los montantes de
la pared a través de cada agujero para
fijar los paneles de la pared.
Figure 3/Figura 3
Stud
Viga
8 P/N 27720 7/06
Install temporary braces to hold the
center of the panels tight to the studs
for approximately 24 hours while
adhesive sets (Figure 4).
Install greenboard. When installing
greenboard, position drywall screws
above the top nailing flange to avoid
having to drill clearance holes. If you
choose to screw through the nailing
flange, you MUST drill 3/16” clear-
ance holes in the flange to avoid
cracking/damaging the flange.
After greenboard is installed, apply
finished latex/acrylic caulk bead to
all edges and joints (Figure 5). Follow
caulk manufacturers’ recommended
cure time.
Make connections to supply and
drain lines.
5
6
Coloque los soportes provisorios para
sostener el centro de los paneles
presionado contra los montantes de la
pared por unas 24 horas mientras se
seca el adhesivo (Figura 4).
Instale el tablero verde a la pared con
tornillos para paneles de yeso por
encima de la brida de fijación para
evitar perforar agujeros de paso. Si
escoge atornillar a través del ala de
sujeción, deberá perforar agujeros de
paso de 3/16” en el ala para evitar que
se raje/dañe.
Luego de instalar el tablero verde,
coloque calafateado látex/acrílico de
terminación en todos los bordes y juntas
(Figura 5). Siga los tiempos de secado
recomendados por el fabricante del
calafateado.
Haga las conexiones del agua y del
desagüe.
Figure 4/Figura 4
Figure 5/Figura 5
7
8
5
6
7
8
Enclosure Installation/Instalación del Gabinete
1
1
Position wall jambs and check
for plumb, mark hole centers.
Remove wall jambs and drill
holes.
Coloque los jambas de la pared
y verifique que estén a ploma-
dos, marque los agujeros. Saque
los soportes de fijación a la
pared y haga los agujeros.
2
2
3
3
Secure wall jambs with screws.
Fije las jambas a la pared con
los tornillos.
Slide panels into wall jambs. Do
not attach with screws.
Inserte los paneles dentro las
jambas. No los fije con tornillos.
Flat surface to inside
La superficie plana va
hacia el interior
35-1/2”
(90.1 cm)
19
19
2
#8 x 1-1/4”
Screws
Tornillos
16
Angled edges face in
Los bordes en ángulo hacia adentro
© 2006 American Shower & Bath Corporation 9
4
4
Assemble door frame with #8 x
1-1/2” screws. The pivot hole in
the top and bottom frame must
be assembled so they are on the
same side of frame. Illustration
shows the pivot to the right.
Arme el bastidor de la puerta
con los tornillos #8 x 1-1/2”. El
agujero del pivote en el bastidor
superior e inferior debe armarse
de modo que queden del mismo
lado del bastidor. La figura mues-
tra el pivote en la derecha.
Pivot hole on same side
Orificios para el pivote
del mismo lado
4
6
7
5
5
6
6
Attach latches (15) to door
frame on both sides. Push pivot
bushings (17) into hole in top and
bottom frame.
Coloque las trabas (15) de la
puerta en ambos lados. Em-
puje los cojinetes del pivote (17)
dentro de los orificios superior e
inferior del bastidor.
Slide corner posts (5) fully over
sides of door frame. Do not
screw door posts to door frame.
Deslice los postes esquineros (5)
completamente sobre el bastidor
de la puerta. No atornille los
postes al bastidor de la puerta.
1
15
17
5
Door shown with outside facing up and pivot to the right.
Door swing can be changed when installing assembled door in step 7.
Se muestra la puerta con la cara exterior hacia arriba y el pivote a la derecha.
Después de ensamblar la hoja de la puerta se puede decidir la dirección en que abre
al instalarla en el paso 7.
6
17
7
4
Notch
Muesca
6
Notch
Muesca
4
7
5
4
5
6
Notch
Muesca
Notch
Muesca
7
10 P/N 27720 7/06
10
10
11
11
Have someone hold the parts
together (to ensure a tight fit at
the miter joint) while installing
four screws into each of the two
top brackets.
Que otra persona mantenga
unidos los cabezales (para que
encajen ajustados en la unión a
inglete) mientras instala cuatro
tornillos en cada una de las dos
uniones superiores.
Before sliding the expanders
into the header, use your hands
to lightly bend the sides of the
expanders outward. Slide header
expander into each end of header
until they stick out about 1/8”.
Antes de colocar los expansores
sobre los travesaños, use sus
manos para doblar levemente
los costados de los expansores
hacia afuera. Deslice los ex-
pansores del travesaño dentro
de cada travesaño hasta que
sobresalgan 1/8”.
12
12
Place header on top of as-
sembled unit. Position header to
assure best fit. When correctly
positioned, secure with screws.
Coloque el cabezal sobre el
gabinete ensamblado en la
forma que ajuste mejor y
asegúrelo con tornillos.
11
13
14
12
1
3
#8 x 1/2” Self-drilling screws
Tornillos autoperforantes #8 x 1/2”
Note: If installing self drilling screws is
difficult, drill 1/8” holes.
Nota: Si es muy difícil colocar los tornillos
autoperforantes, haga agujeros de 1/8”.
11
7
7
8
8
9
9
Choose direction of door open-
ing and slide assembled door
frame and posts into the two
fixed panels. Picture shows
frame assembled with pivot on
the right.
Elija la dirección de apertura de
la puerta y deslice el bastidor
armado de la puerta y los postes
dentro de los dos paneles fijos.
La figura muestra el bastidor
armado con el pivote en la
derecha.
Adjust panel in wall jamb and
corner post until unit is level and
door frame is centered on the
threshold. Secure corner post to
door frame with screws. Secure
panel to wall jambs and corner
post with screws.
Ajuste los paneles laterales
entre las jamba de la pared y de
la puerta hasta nivelar la unidad
y centrar el bastidor de la puerta.
Asegure el bastidor de la puerta
y los paneles laterales a las jambas
respectivas con los tornillos.
Flip to hinge from opposite side
Délo vuelta para colocar el pivote del
lado apropiado
View from inside shower
Vista desde adentro del gabinete
#8 x 1/2”
Self-drilling
screws
Tornillos
Autoperforantes
Insert two brackets (10) into
each end of door header (12). Lay
header on a flat surface with the
long leg facing down so it sits
flat. Slide panel headers (13 & 14)
over brackets at each end.
Inserte dos conectores de
cabezal (10) en cada extremo del
cabezal de la puerta (12) y apóy-
elo sobre una superficie plana
con la pata larga hacia abajo
para que quede plano. Deslice
los cabezales (13 y 14) de los
paneles fijos en los conectores
en cada extremo del cabezal.
13
14
12
10
© 2006 American Shower & Bath Corporation 11
13
13
14
14
Adjust expanders until there is
no gap between the expanders
and wall. Secure with self-drill-
ing screw to header.
Ajuste los expansores hasta que
no haya ningún espacio entre los
expansores y la pared. Asegurar
al cabezal con tornillos
autorenroscantes.
Slip pin (e), plate (f), gasket (d)
and bushing (a) over screw (h).
Insert screw through glass door
(bushing (a) fits in hole of glass)
and slip remaining gasket (d)
and plate (f) over screw. Posi-
tion inside handle (c) over screw.
Thread screws into handle. Posi-
tion back handle (b) over heads
of screws and secure with set
screws (g).
Coloque la clavija (e), arandela (f),
junta (d) y separador (a) sobre el
tornillo (h). Inserte el tornillo por
la puerta de vidrio (el separador
(a) entra en el orificio del vidrio)
y coloque la otra empaquetadura
(d) y arandela (f) sobre el tornillo.
Coloque la manija interior (c) en
el tornillo. Ajuste los tornillos
en la manija. Coloque la manija
interior
(b) sobre las cabezas de los
tornillos
y ajústela con los tornillos
prisioneros (g).
15
15
16
16
17
17
18
18
Install bottom pivot bracket onto
door glass as shown.
Install door by first putting bot-
tom pivot bracket into the bottom
bushing. Then, put top front pivot
with two gaskets into top pivot
bushing. Angle door onto top
pivot bracket and attach gaskets
and pivot bracket back with
screw.
Instale la puerta colocando prim-
ero el pivote inferior dentro del
cojinete correspondiente. Luego
coloque el pivote superior frontal
con dos empaquetaduras dentro
del cojinete superior. Incline
la puerta contra el soporte del
pivote superior y coloque las
empaquetaduras y la parte pos-
terior del soporte con el tornillo.
Measure and cut two pieces out of
sweep gasket (20). Slide onto the bot-
tom of the door. Notch to clear door
frame when closed.
Mida y corte el sello inferior (20) al
tamaño adecuado y deslícela en el
borde inferior de la hoja de la puerta.
Hágale una muesca para que la puerta
pase del marco cuando se cierre.
Caulk outside edges of
shower as shown.
8
9g
9b
9h
9e
9d
9a
9c
9f
Pivot gasket
empaquetadura
del pivote
Pivot bracket back
Soporte trasero del pivote
Pivot bracket front
Soporte frontal del
pivote
18
18
20
1
11
Instale el soporte inferior del
pivote en el vidrio de la puerta
como se indica.
Notch
Muesca
View from inside shower
Vista desde adentro del gabinete
Calafatee los bordes
exteriores del gabinete
como se muestra.
12 P/N 27720 7/06
CARE AND CLEANING
For regular cleaning use only mild detergents or warm, soapy water
applied with a soft cloth. Always rinse surfaces after cleaning and
dry by blotting with a damp cloth or chamois.
Because cleaning products often change over time, we cannot rec-
ommend a specific cleaner to use on this product. However, which-
ever you choose:
• Always check the manufacturer’s instructions
• DO NOT use a cleaner on this product if the label indicates it should
not be used on plastics
To make this product last its longest:
• Always rinse off cleaners within 5 minutes of application
• Rinse off cleaners even if they say they are “spray on &
walk away”
5-YEAR LIMITED WARRANTY
The manufacturer warrants to the original consumer purchaser
that its products will be free of defects in materials and work-
manship, subject to the limitations, exclusions and conditions
that follow, from date of original purchase as shown on purchas-
ers receipt. The manufacturer will, at its discretion replace or
repair FREE OF CHARGE, during the warranty period, any part
which the manufacturer determines to be defective in material
and/or workmanship under normal installation, use and service.
The original consumer purchaser must notify the manufacturer
in writing of any defect covered by the warranty at the address
listed. THIS WARRANTY IS THE ONLY EXPRESS WARRANTY
MADE BY THE MANUFACTURER. ANY CLAIMS MADE UNDER
THIS WARRANTY MUST BE MADE DURING THE PERIOD RE-
FERRED TO ABOVE. ANY IMPLIED WARRANTY OF MERCHANT-
ABILITY OR FITNESS FOR A PARTICULAR PURPOSE IS LIMITED
IN DURATION TO THE DURATION OF THIS WARRANTY. LABOR
CHARGES AND/OR DAMAGE INCURRED IN INSTALLATION, RE-
PAIR OR REPLACEMENT AS WELL AS INCIDENTAL AND CONSE-
QUENTIAL DAMAGES CONNECTED THEREWITH ARE EXCLUDED
AND WILL NOT BE PAID BY THE MANUFACTURER. Some states do
not allow limitations on how long an implied warranty lasts, or the
exclusion or limitation of incidental or consequential damages, so the
above limitations or exclusions may not apply to you. This warranty
gives you specific legal rights, and you may also have other rights
which vary from state to state. This warranty is void for any damage
to this product due to misuse, abuse, neglect, accident, improper
installation, modification, unauthorized repair, or any use violative of
instructions furnished by us.
GARANTÍA LIMITADA DE 5 AÑOS
El fabricante le garantiza al comprador original que este producto
no tendrá defectos de materiales y de mano de obra, sujeto a las
limitaciones, exclusiones ni condiciones a continuación, desde la
fecha original de compra indicada en el recibo. El fabricante, a su
criterio, reemplazará o reparará SIN CARGO, durante el término de
la garantía, cualquier parte que considere defectuosa en material
y/o mano de obra bajo condiciones normales de instalación, uso y
mantenimiento. El comprador original deberá notificar al fabricante
por escrito acerca de cualquier defecto cubierto por la garantía a
la dirección indicada. ESTA ES LA ÚNICA GARANTÍA EXPRESA DEL
FABRICANTE. TODO RECLAMO HECHO BAJO ESTA GARANTÍA DEBE
REALIZARSE DURANTE EL PERÍODO INDICADO ANTERIORMENTE.
TODA GARANTÍA IMPLÍCITA DE CALIDAD O IDONEIDAD PARA UN
PROPÓSITO EN PARTICULAR SE LIMITA A LA DURACIÓN DE ESTA
GARANTÍA. LOS CARGOS DE MANO DE OBRA Y/O DAÑOS INCURRIDOS
DURANTE LA INSTALACIÓN, REPARACIÓN O REEMPLAZO ASÍ
COMO LOS DAÑOS FORTUITOS E IMPREVISTOS RELACIONADOS
CON DICHAS ACTIVIDADES ESTÁN EXCLUIDOS Y NO SERÁN
CUBIERTOS POR EL FABRICANTE. Algunos estados no permiten
limitaciones con respecto a cuanto dura una garantía implícita o la
exclusión o limitación de daños imprevistos o consiguientes, por lo
tanto las exclusiones o limitaciones anteriores pueden no aplicarse
en su caso. Esta garantía le otorga derechos legales específicos, y
usted puede también tener otros derechos los que varían de estado
a estado. Esta garantía quedará anulada en caso de daños al
producto causados por uso inadecuado, abuso, negligencia, instalación
inadecuada, modificaciones, reparaciones no autorizadas, o cualquier
uso contrario a las instrucciones proporcionadas por nosotros.
CARE AND CLEANING YOUR SHOWER
Maintenance: Only use warm water and mild soap. CAUTION: Deter-
gents or any abrasive cleaners may damage the door and shower.
WARNING
Use of any of the following will result in damage to the shower and
will void the warranty.
Citrus Orange (limonene cleaners), Solvents, Paint Remover, Lacquer
Thinner, Varsol, Chlorinated Disinfectant Sprays, Industrial Degreas-
ers, Cleaners containing, Isopropyl Alcohol, Abrasive Cleaners and
Harsh Chemicals, Lysol, Dow Scrubbing Bubbles, Antifreeze and Pine
Off Cleaners such as PineSol. Do not use products such as Tilex,
Vim, Clean Shower or any similar corrosive products.
If any adverse chemicals do come in contact with the shower
surfaces, immediately rinse thoroughly with clean water. To prevent
discoloration caused by ferrous or “hard” water, wipe the shower
dry after each use and clean each week with warm water and a
gentle soap (liquid soap for dishes).
CUIDADO Y LIMPIEZA DE SU GABINETE DE DUCHA
Mantenimiento: Use únicamente agua tibia y jabón delicado.
CUIDADO: Los detergentes o limpiadores abrasivos pueden dañar la
puerta y la ducha.
ADVERTENCIA
El uso de cualquiera de los siguientes productos dañará el gabinete.
y anulará la garantía.
Citrus Orange (limpiadores cítricos), Solventes, Quita Pinturas, Tíner,
Varsol, Desinfectantes en Aerosol con Cloro, detergentes Industria-
les, Limpiadores con Alcohol Izopropílico, Limpiadores Abrasivos
y
Químicos Potentes, Lysol, Burbujas Limpiadoras Dow, Anticongelante
y
Limpiadores a base de Pino como PineSol.
No use productos como Tilex, Vim, Clean Shower u otro producto
corrosivo similar.
Si cualquier producto químico abrasivo entra en contacto con las
superficies del gabinete, enjuáguelas inmediatamente con agua
limpia. Para evitar la decoloración causada por calcio o agua “dura”,
seque la ducha luego de usarla y límpiela todas las semanas con
agua tibia jabón delicado (jabón líquido para vajillas).
CUIDADO Y MANTENIMIENTO
Para la limpieza normal, use únicamente detergentes suaves o agua
enjabonada tibia aplicada con un trapo suave. Siempre enjuague las
superficies luego de limpiarlas y séquelas con un trapo húmedo o
gamuza.
No le podemos recomendar un producto limpiador específico ya que
varían con el tiempo. Sin embargo, cualquiera sea su opción:
• Siga siempre las instrucciones del fabricante
• NO USE un limpiador que no sirva para plásticos en este
producto.
Para hacer que este producto le dure al máximo:
• Siempre enjuague los limpiadores dentro de los 5 minutos de
haberlos colocado.
• Enjuague los limpiadores incluso cuando sean del tipo “colóquelos
y déjelos”.

Transcripción de documentos

Neo Shower Ducha Neo Installation Manual Manual de Instalación Model No:_____________________________ Modelo N°____________________________ Customer: Please record your model number. The model number is found on the label located on the front panel of the box. It is very important to record your model number. This information is necessary when contacting us. Please retain this manual for future reference. A list of repair parts is included. Important: Read these instructions before starting installation. Installation must be at a temperature near 60°F (16°C). Do not install in unheated areas where the temperature may drop below 32°F (0°C). If you have any questions on the installation of this unit, please do not return to the store where you purchased it. For assistance, pleae call 1-800-355-ASB1 (2721), Monday to Thursday, 8:30 am to 5:30 pm E.S.T. and Friday, 8:30 am to 3:30 pm E.S.T. Please have this Installation manual available when calling. Or email us at [email protected]. Important! These instructions include suggestions for rough construction, drywall installation and plumbing installation that we believe to be reliable. Local building codes vary by location and could supersede those suggestions. If you are not confident in your ability to perform these tasks, you should use a professional installer or contract out those tasks you need help with. Be sure to check local building codes for product compliance before installation. Cliente: Escriba aquí su número de modelo. Lo puede encontrar en la etiqueta, ubicada en el panel frontal de la caja. Es muy importante anotar su número de modelo. Necesitará esta información cuando nos llame. Conserve este manual para referencia futura. Incluye una lista de partes de repuesto. ¡Importante! Lea estas instrucciones antes de comenzar con la instalación. La instalación debe realizarse a una temperatura cercana a los 60°F (16°C). No lo instale en áreas sin calefacción donde la temperatura pueda llegar por debajo de los 32°F (0°C). Si tiene alguna pregunta referente a la instalación de esta unidad, no se dirija a la tienda donde la haya comprado. Para obtener ayuda, llame al 1-800-355-ASB1 (2721), de lunes a jueves, de 8:30 a 17:30 EST y los viernes de 8:00 a 15:30 EST. Tenga este manual de instalación a mano cuando llame. También puede escribirnos a [email protected]. ¡Importante! Estas instrucciones incluyen sugerencias para la construcción inicial, instalación de los paneles de pared y la cañería que creemos que es confiable. Las normas de construcción locales varían en cada lugar y pueden tener precedencia sobre estas sugerencias. Si no cree tener la habilidad necesaria para realizar estas tareas, debería usar un instalador profesional o subcontratar las tareas para las que necesite ayuda. Asegúrese de verificar las normas locales de construcción para este producto antes de instalarlo. TOOLS AND MATERIALS REQUIRED Installation requires common household tools and: • Level & square • Tape measure • Hammer • Pencil • Drill with 3/32” (2 mm), 1/8” (3 mm), & 3/16” (5mm) bits • Hole saw (sized to accommodate plumbing fixtures) • Screwdriver-phillips • 3/4” galvanized roofing nails • 2x4 lumber for additional wall studs (if required) • Two backer boards - See Illustration 2. • Sub-floor panels or leveling compound to ensure floor is level and square with walls • Necessary water and drain line materials and fittings. • Caulk gun • One (1) 10.3 Fl. Oz. (304 ml) cartridge of latex/acrylic caulk • Two (2) 10.5 Fl. Oz. (310 ml) cartridges of one of the following approved adhesives• ASB Adhesive & Caulk Kit • Franklin MultiBond • Macco Adhesives’ Liquid Nails for base Surrounds (LN-915) • Dap 2000 Construction Adhesive • Macklanburg-Duncan Adhesive (suitable for polystyrene) Follow manufacturers’ instructions but allow at least 24 hours for caulk and adhesive to set before using. HERRAMIENTAS Y MATERIALES NECESARIOS La instalación requiere herramientas hogareñas comunes y: • Nivel y escuadra • Cinta métrica • Martillo • Lápiz • Taladro con mecha de 3/32” (2mm), 1/8” (3mm) y 3/16” (5mm) • Sierra para agujeros (del tamaño necesario para las cañerías) • Destornillador en cruz • Clavos galvanizados para techo de 3/4” • Maderas de 2”x 4” para montantes adicionales para la pared (si es necesario) • Dos tableros de respaldo – Vea la ilustración 2 por detalles. • Paneles de contrapiso o material de relleno para asegurar que el piso esté nivelado y a escuadra con las paredes. • Materiales y acoples necesarios para las cañerías de agua y desagüe. • Pistola para calafatear • Un (1) cartucho de 10,3 onzas (304ml) de calafateado látex/acrílico • Dos (2) cartuchos de 10,5 onzas (310ml) de uno de los siguientes adhesivos aprobados• Juego de adhesivo ASB y de calafatear • Adhesivo Multiuso Franklin • Adhesivo Clavos Líquidos de Macco para los bordes de la Base (LN-915) • Adhesivo Dap 2000 para la construcción • Adhesivo Macklanburg-Duncan (para poli estireno) Siga las instrucciones del fabricante pero espere por lo menos 24 horas para que se seque el calafateado y el pegamento antes de usar. American Shower & Bath 540 Glen Ave. • Moorestown, NJ 08057 • 1-800-355-ASB1 • Fax: 856-235-9262 www.asbcorp.com © 2006 American Shower & Bath Corporation  REQUIREMENTS FOR A SUCCESSFUL INSTALLATION 1. Confirm that all components have been included before beginning your installation. Please refer to the Parts List in this manual. 2. Walls must be solid, plumb and square. This unit has been designed with some adjustability for minor alignment problems, but a poor foundation will result in a poor installation. 3. During installation you have a choice to install the shower door with a left-hand or right-hand opening. Note that door must swing out. 4. Power screwdrivers are recommended only where indicated. 5. Follow manufacturers’ instructions but allow at least 24 hours for caulk to set before using shower. 6. CAUTION: Tempered glass cannot be cut. 7. Read these instructions and confirm that base will fit in the intended corner before beginning installation. 8. The alcove wall studs should be located as shown in Illustration 1 and be plumb. If the studs are not plumb, shimming may be required. It is important that studs are located as shown. If you are remodeling, and a stud is not at that exact location, add a new one. Other studs should be located according to local building codes. A 2 x 4 x 68” backer board (*) must be mounted as shown in Illustration 1 and 2. This provides a solid attachement for enclosures. • Rough plumbing must be installed before base and/or wall panels. Illustration 2 shows suggested location of fixtures if new plumbing is being installed. Provide an access panel on the back side of the wall with the plumbing fixtures. If plumbing exists, check that fixtures will clear base and panels. All plumbing must meet local building codes. • The base must be installed on a solid and level sub-floor that is square with the wall studs. The base supports, which are built into the shower support base, must sit directly on a level subfloor. • If you are installing the shower base over a sub-floor other than plywood, place padding between the base and sub-floor to prevent squeaking. Recommended padding includes spun-bonded landscape fabric or house wrap material. Use of other materials may result in squeaking. • Cut a portion from the carton to protect the base from damage during installation. • The base should not be installed in areas where the temperature may drop below freezing (32oF or 0oC). • Allow base to reach room temperature for 30 minutes before installing. Important: The wall studs must be plumb and square to the floor! Inside corner must be square (Refer to Illustration 3). 9. Special installations: • Above the floor drains Create a platform of 2 x 4’s (or taller depending on drain requirements) to raise the entire base area and cover it with sub-flooring. This platform must be level and square to the wall studs. When installing plumbing, add platform height to the dimensions shown in Illustration 2. • Masonry walls Construct a 2 x 6 stud wall for the plumbing end. Apply 2 x 2 furring strips to the masonry wall in the same locations as the studs in Illustration 1. • Installation over greenboard or firewalls If you are installing wall panels over greenboard and/or firewall material, and not directly on the studs, your dimensions must take into account the thickness of this material and measurements should be taken from the inside of the finished walls.  P/N 27720 7/06 REQUISITIOS PARA UNA INSTALACIÓN EXITOSA 1. Verifique que todos los componentes estén incluidos antes de comenzar su instalación. Refiérase a la Lista de Partes de este manual. 2. Las paredes deben ser sólidas, aplomadas y en escuadra. Esta unidad ha sido diseñada para poder ajustar pequeños problemas de alineación, pero una base deficiente producirá una mala instalación. 3. Durante la instalación usted podrá elegir entre instalar la puerta del gabinete abriéndose hacia la derecha o hacia la izquierda. Note que la puerta debe abrirse hacia fuera. 4. Se recomienda el uso de destornilladores eléctricos únicamente donde se indica. 5. Siga las instrucciones del fabricante pero espere por lo menos 24 horas para que se seque el calafateado antes de usar la ducha. 6. CUIDADO: El vidrio templado no se puede cortar. 7. Lea estas instrucciones y verifique que la base entre en la esquina antes de empezar la instalación. 8. Los montantes de las paredes deben estar ubicadas como se muestra en la ilustración 1 y deben estar a escuadra. Si los montantes no están a escuadra, puede tener que acuñarlas. Es importante que los montantes estén en los lugares que se muestran. Si está redecorando, y no hay una viga en el lugar exacto, agregue una nueva. Los demás montantes deben ubicarse de acuerdo con las normas locales de construcción. Deberá colocar un par de tablas de refuerzo (*) de 2 x 4 x 68” como se muestra en las ilustraciones 1 y 2. Esto proporciona un soporte sólido para el recinto. • La cañería deberá instalarse antes que la base y/o los paneles de pared. La ilustración 2 muestra la ubicación sugerida al instalar cañería nueva. Proporcione un panel de acceso en la parte de atrás de la pared con las cañerías. Si la cañería ya existe, verifique que deje suficiente lugar para la base y las paredes. Todas las cañerías deben cumplir con las normas locales de construcción. • La base debe instalarse sobre un piso sólido y nivelado que esté a escuadra con los montantes de las paredes. Los soportes de la base, que están incorporados a la base de soporte de la ducha, deben apoyar directamente sobre el piso nivelado. • Si está instalando la base de la ducha en un piso que no sea de contrachapado, coloque relleno entre la base y el piso para evitar crujidos. El relleno recomendado incluye tela de jardinería o material de recubrimiento para viviendas. Si usa otros materiales podría causar crujidos. • Corte una parte del cartón para proteger la base y que no se dañe durante la instalación. • No debe instalar la base en lugares donde la temperatura pueda llegar a menos de 32oF (0oC). • Permita que la base adquiera la temperatura ambiente durante 30 minutos antes de instalarla. Importante: ¡Los montantes de la pared deben estar a escuadra con el piso! El interior de la esquina debe estar a escuadra (ver ilustración 3). 9. Instalaciones especiales: • Acerca del desagüe del piso Haga una plataforma con palos de 2” x 4” (o más alta, dependiendo de los requisitos del desagüe) para elevar toda la base y cubrirla con el contrapiso). Esta plataforma debe estar nivelada y a escuadra con los montantes de las paredes. Al instalar cañerías, eleve la plataforma hasta las dimensiones indicadas en la ilustración 2. • Paredes de mampostería Construya una pared de durmientes de 2 x 6 para el extremo con las cañerías. Coloque palos de 2 x 2 como costillaje en la pared de mampostería en los mismos lugares que los montantes de la ilustración 1. • Instalación sobre paredes resistentes a la humedad (greenboard) o contra incendios Si está instalando paneles de pared sobre paredes resistentes a la humedad (greenboard) o contra incendios, sus mediciones deben tener en cuenta el espesor de este material y deberá hacerlas desde el interior de las paredes terminadas. 6-3/4" 15" Additional stud needed if end of wall Montantes adicional necesaria al final de la pared 42" Plumbing fixture on either wall Cañerías en cualquiera de las paredes 16" 8-1/4 12" Drain cutout 5” diameter Max. Centered on drain Corte para el desagüe diámetro máximo de 5” Centrado en el desagüe 15" 12" 6-3/4 Additional stud needed if end of wall Montantes adicional necesaria al final de la pared 42" Stud placement and drain location Reemplazo de montantes y ubicación del desagüe 16" Illustration 1 Ilustración 1 Suggested rough plumbing locations (right-hand installation shown) Ubicación sugerida del desagüe (se muestra la instalación a la derecha) Each wall stud must be plumb and square. Cada una de los montantes de la pared debe estar a plomo y a escuadra Shower head elbow Codo de la ducha Plumbing backer board Access panel location Ubicación del panel de acceso Placas de soporte de cañerías 81" Mixing valve Válvula mezcladora 44" 2 x 4 x68" Illustration 3 Ilustración 3 7-1/2" Illustration 2 Ilustración 2 © 2006 American Shower & Bath Corporation  Parts List/Lista De Partes Part No. / No. de Parte Quantity /Cantidad Description/Descripción 1 #6 x 1/2” SS Phil Panhead/Tornillo autoenroscante de acero inox, cab. plana, ranura en cruz 10 2 #8 x 1-1/4” SS Phil Panhead/Tornillo de acero inox, cab. plana, ranura en cruz 8 3 #8 x 1/2” Panhead Self-Drill/Tornillo autoperforante, cab. plana 31 4 #8 x 1-1/2” SS Phil Panhead/Tornillo de acero inox, cab. plana, ranura en cruz 8 5 Corner Post/Jamba de la puerta 2 6 Door Frame Side/ Listón lateral del bastidor de la puerta 2 7 Door Frame Top-Bottom/Listón superior/inferior del bastidor de la puerta 2 8 Door Glass/Vidrio de la Puerta 1 9 Handle/Manija 1 a. Glass Bushing/Separador para el Vidrio 2 b. Neo Handle Back ASM/Manija Interior Neo ASM 1 c. Neo Handle Front ASM/Manija Exterior Neo ASM 1 d. Neo Handle Gasket/Empaquetadura de Manija Neo 4 e. Neo Handle Pin/Clavija de Manija Neo 2 f. Neo Handle Plate/Arandela de Manija Neo 4 g. 1/4-20 x 1/4” Set Screw-Cup Point/Juego de Tornillos prisioneros 4 h. Screw/Tornillo 2 10 Header Bracket/Soporte de cabezal 4 11 Header Expander/Expansor de cabezal 2 12 Header-Door/cabezal de la Puerta 1 13 Header-PNL Left Panel/Travesaño del Panel Izquierdo 1 14 Header -PNL Right Panel/Travesaño del Panel Derecho 1 15 Door Latch/Retén de la puerta 2 16 Fixed Panel/Panel Fijo 2 17 Pivot Bushing/Buje del Pivote 2 18 Pivot Bracket/Soporte con Pivote 2 19 Wall Jamb/Jamba de la pared de la Pared 2 20 Sweep gasket/Sello inferior 1 21 Right Hand side panel/Panel lateral derecho 1 22 Left hand side panel/Panel lateral izquierdo 1 23 Base 1 24 Fastener pack/Paquete de fijadores 1 17 3 1 #6 x 1/2" (12mm) 2 #8 x 1/2" (12mm) 4 #8 x 1-1/4" (32mm)  10 P/N 27720 7/06 #8 x 1-1/2" (32mm) 15 18 Base Installation/Instalación de la Base 1 Attach drain to base. Position base in corner (Figure 1). Check that base is sitting flat on floor and that it is level and square to the wall studs. Minor adjustments can be made by shimming the bottom support. There should be no more than 1/8” gap between the top base flange and the wall studs. If needed, remove the base from the corner, shim as required, reposition base, and check again. Repeat as necessary. 1 Option 1 Opción 1 Fije el desagüe a la base. Coloque la base en la esquina (Figura 1). Verifique que la base esté bien apoyada sobre una superficie nivelada y en escuadra con los montantes de la pared. Se pueden hacer pequeños ajustes colocando relleno en el soporte inferior. No debe quedar un espacio de más de 1/8” entre la pestaña superior de la base y los montantes de la pared. Si hace falta, saque la base de la esquina, coloque el relleno que haga falta, vuelva a colocar la base y verifique nuevamente. Repítalo según fuese sea necesario. Stud Option 2 Viga Opción 2 Stud Montante Nail Clavo Green Board Wall covering Revestimiento de pared Caulk bead Calafateado Base Shower base flange Brida de la base de la ducha Figure 1/Figura 1 2 3  Apply beads of adhesive on ridges in the base bottom support. Reposition the base and press down firmly to ensure good adhesive contact and recheck level. While standing in the base, the top flange should be secured with galvanized roofing nails at each stud location and in two places on each side of the apron. There are two methods in which you can secure the flange to the studs. Option 1 - Install nails just above the flange so that the large nail head holds the flange against the stud. Make sure nail heads do not protrude as to interfere with the walls when they are installed. Option 2 - Locate and drill 3/16” clearance holes in the center of the nailing flange and centered on each stud. Hammer nails through each hole and into the studs, securing the base. If you are installing one of our matching wall sets, proceed with the “Wall Set Installation” instructions that follow. If you are installing greenboard with another covering, leave a gap of 1/8” between the base ledge and the wall material to help reduce the chance of water getting into the wall board. When wall is finished, seal this gap with latex/acrylic caulk (Figure 3). P/N 27720 7/06 Figure 2/Figura 2 2 3 1/8” Gap separación de 1/8” Figure 3/Figura 3 Coloque adhesivo en los bordes de los soportes inferiores de la base. Vuelva a colocar la base y presione hacia abajo firmemente para asegurar que el adhesivo se apoye bien y vuelva a verificar el nivelado. Mientras se para en la base, fije la pestaña superior con clavos galvanizados para techo en cada viga de pared y en dos lugares de cada lado del borde. Puede fijar la pestaña a los montantes de dos formas distintas. Opción 1 – Coloque los clavos justo sobre la brida de modo que la cabeza grande del clavo sujete el ala contra la viga de la pared. Verifique que las cabezas de los clavos no sobresalgan e interfieran con las paredes al instalarlas. Opción 2 – Marque y perfore agujeros de 3/16” en el centro del ala de sujeción centrados en cada una de las vigas de la pared. Martille los clavos en cada una de los montantes de la pared a través de los agujeros para fijar la base. Si está instalando uno de nuestros juegos de paredes, prosiga con las instrucciones de “Instalación de del Juego de Paneles para Pared” a continuación. Si está instalando tablero verde con algún otro revestimiento, deje una separación de 1/8” entre el borde de la base y el material de la pared para evitar la posibilidad de que el agua llegue a la pared. Cuando termine con la pared, selle este espacio con calafateado látex/acrílico (Figura Wall Set Installation/Instalación del juego de Paneles para Pared 1 2 Position the two wall panels as they will go into the corner. Horizontal nailing flanges will be located at the top of both panels. Lower each panel onto the shower alignment locators (Figure 1) to ensure that the panels are lined up correctly in the alcove. Decide which side panel will need cutouts for plumbing fixtures. Carefully locate, mark and cut holes, using the proper size hole saw. Apply caulk into recess in corners of both panels. Assemble right and left panels. Secure with screws, nuts & washers in fastener pack (24) in 4 places (Figure 1). Check fit before proceeding. 1 2 Coloque los dos paneles de la forma en que irán en la esquina. Las bridas horizontales para clavado quedan sobre ambos paneles. Descienda cada panel sobre las guías del gabinte (Figura 1) para verificar que los paneles estén alineados correctamente en la cavidad. Decida cual de los paneles laterales necesitará cortar para las cañerías. Ubique, marque y corte cuidadosamente los agujeros las sierras cilíndricas de los tamaños adecuados. Coloque sellador en las ranuras de los bordes de ambos paneles. Arme los paneles izquierdo y derecho. Fíjelos con tornillos, tuercas y arandelas en paquete de fijadores (24) en 4 lugares (Figura 1). Verifique si entran antes de proseguir. Pencil line Línea con lápiz Adhesive bead Capa de adhesivo Nut Tuerca Washers Arandelas Screw Tornillo Caulk Bead Calafateado Bottom has cut away Parte inferior recotada Figure 1/ Figura 1 3 4 When satisfied with fit, mark the top of the panels on each stud. Remove the panels. Apply a bead of adhesive down each stud that will come in contact with the back panel being sure to stay below the line you marked. You do not need to apply adhesive to the corner studs. Lay a bead of latex/acrylic caulk along base ledge (Figure 2). Reposition panels and press firmly in coner against studs. Locate and drill a 3/16” hole in the center of the nailing flange at the top of the panel and centered on each stud. Also drill 3/16” holes in the front nailing flange on each side panel at approx. 12” intervals, centered on the flange (Figure 3). Hammer 3/4” galvanized roofing nails through each hole and into the studs, securing the wall panel. Figure 2/ Figura 2 3 Stud Viga 4 Figure 3/Figura 3 Al terminar de colocarlos, marque la parte superior de los paneles en cada una montantes de la pared. Saque los paneles. Coloque una línea de adhesivo en cada montante que entrará en contacto con el panel posterior manteniéndose por debajo de la línea que acaba de marcar. No necesita colocar adhesivo en los montantes de las esquinas. Coloque una línea de calafateado látex/ acrílico a lo largo del borde de la base (Figura 2). Vuelva a colocar los paneles y presiónelos firmemente en la esquina contra los montantes de la pared. Marque y perfore un agujero de 3/16” en el centro de la brida de fijación en la parte superior del panel en el centro de cada viga. Perfore también agujeros de 3/16” en el ala de sujeción frontal de cada panel lateral a intervalos de aproximadamente 12” centrados en la brida (Figura 3). Martille clavos galvanizados de 3/4” para techo en los montantes de la pared a través de cada agujero para fijar los paneles de la pared. © 2006 American Shower & Bath Corporation  5 Install temporary braces to hold the center of the panels tight to the studs for approximately 24 hours while adhesive sets (Figure 4). 6 Install greenboard. When installing greenboard, position drywall screws above the top nailing flange to avoid having to drill clearance holes. If you choose to screw through the nailing flange, you MUST drill 3/16” clearance holes in the flange to avoid cracking/damaging the flange. 7 8 5 6 Figure 4/Figura 4 After greenboard is installed, apply finished latex/acrylic caulk bead to all edges and joints (Figure 5). Follow caulk manufacturers’ recommended cure time. 7 Make connections to supply and drain lines. 8 Coloque los soportes provisorios para sostener el centro de los paneles presionado contra los montantes de la pared por unas 24 horas mientras se seca el adhesivo (Figura 4). Instale el tablero verde a la pared con tornillos para paneles de yeso por encima de la brida de fijación para evitar perforar agujeros de paso. Si escoge atornillar a través del ala de sujeción, deberá perforar agujeros de paso de 3/16” en el ala para evitar que se raje/dañe. Luego de instalar el tablero verde, coloque calafateado látex/acrílico de terminación en todos los bordes y juntas (Figura 5). Siga los tiempos de secado recomendados por el fabricante del calafateado. Haga las conexiones del agua y del desagüe. Figure 5/Figura 5 Enclosure Installation/Instalación del Gabinete 1 1 Position wall jambs and check for plumb, mark hole centers. Remove wall jambs and drill holes. Coloque los jambas de la pared y verifique que estén a plomados, marque los agujeros. Saque los soportes de fijación a la pared y haga los agujeros. 19 Flat surface to inside La superficie plana va hacia el interior Secure wall jambs with screws. 2 Fije las jambas a la pared con los tornillos. 2 3 3 Slide panels into wall jambs. Do not attach with screws. Inserte los paneles dentro las jambas. No los fije con tornillos. Angled edges face in Los bordes en ángulo hacia adentro 19 2 #8 x 1-1/4” Screws Tornillos 35-1/2” (90.1 cm)  P/N 27720 7/06 16 Assemble door frame with #8 x 1-1/2” screws. The pivot hole in the top and bottom frame must be assembled so they are on the same side of frame. Illustration shows the pivot to the right. Arme el bastidor de la puerta con los tornillos #8 x 1-1/2”. El agujero del pivote en el bastidor superior e inferior debe armarse de modo que queden del mismo lado del bastidor. La figura muestra el pivote en la derecha. 4 4 5 5 Attach latches (15) to door frame on both sides. Push pivot bushings (17) into hole in top and bottom frame. Coloque las trabas (15) de la puerta en ambos lados. Empuje los cojinetes del pivote (17) dentro de los orificios superior e inferior del bastidor. 6 Slide corner posts (5) fully over sides of door frame. Do not screw door posts to door frame. 6 Deslice los postes esquineros (5) completamente sobre el bastidor de la puerta. No atornille los postes al bastidor de la puerta. 4 Notch Muesca 4 Notch Muesca 17 7 6 7 6 5 Pivot hole on same side Orificios para el pivote del mismo lado 15 7 6 5 Notch Muesca 4 6 17 7 4 1 Notch Muesca 5 Door shown with outside facing up and pivot to the right. Door swing can be changed when installing assembled door in step 7. Se muestra la puerta con la cara exterior hacia arriba y el pivote a la derecha. Después de ensamblar la hoja de la puerta se puede decidir la dirección en que abre al instalarla en el paso 7. © 2006 American Shower & Bath Corporation  Choose direction of door opening and slide assembled door frame and posts into the two fixed panels. Picture shows frame assembled with pivot on the right. Elija la dirección de apertura de la puerta y deslice el bastidor armado de la puerta y los postes dentro de los dos paneles fijos. La figura muestra el bastidor armado con el pivote en la derecha. 7 7 8 8 Adjust panel in wall jamb and corner post until unit is level and door frame is centered on the threshold. Secure corner post to door frame with screws. Secure panel to wall jambs and corner post with screws. Ajuste los paneles laterales entre las jamba de la pared y de la puerta hasta nivelar la unidad y centrar el bastidor de la puerta. Asegure el bastidor de la puerta y los paneles laterales a las jambas respectivas con los tornillos. 9 9 Insert two brackets (10) into each end of door header (12). Lay header on a flat surface with the long leg facing down so it sits flat. Slide panel headers (13 & 14) over brackets at each end. Inserte dos conectores de cabezal (10) en cada extremo del cabezal de la puerta (12) y apóyelo sobre una superficie plana con la pata larga hacia abajo para que quede plano. Deslice los cabezales (13 y 14) de los paneles fijos en los conectores en cada extremo del cabezal. 14 #8 x 1/2” Self-drilling screws Tornillos Autoperforantes Flip to hinge from opposite side Délo vuelta para colocar el pivote del lado apropiado 10 10 Have someone hold the parts together (to ensure a tight fit at the miter joint) while installing four screws into each of the two top brackets. Que otra persona mantenga unidos los cabezales (para que encajen ajustados en la unión a inglete) mientras instala cuatro tornillos en cada una de las dos uniones superiores. 12 10 View from inside shower Vista desde adentro del gabinete 11 11 1 13 Before sliding the expanders into the header, use your hands to lightly bend the sides of the expanders outward. Slide header expander into each end of header until they stick out about 1/8”. Antes de colocar los expansores sobre los travesaños, use sus manos para doblar levemente los costados de los expansores hacia afuera. Deslice los expansores del travesaño dentro de cada travesaño hasta que sobresalgan 1/8”. 12 Place header on top of assembled unit. Position header to assure best fit. When correctly positioned, secure with screws. 12 Coloque el cabezal sobre el gabinete ensamblado en la forma que ajuste mejor y asegúrelo con tornillos. 3 #8 x 1/2” Self-drilling screws Tornillos autoperforantes #8 x 1/2” 11 13 12 14 11 10 P/N 27720 7/06 Note: If installing self drilling screws is difficult, drill 1/8” holes. Nota: Si es muy difícil colocar los tornillos autoperforantes, haga agujeros de 1/8”. 13 13 Adjust expanders until there is no gap between the expanders and wall. Secure with self-drilling screw to header. Ajuste los expansores hasta que no haya ningún espacio entre los expansores y la pared. Asegurar al cabezal con tornillos autorenroscantes. 1 14 14 11 16 16 18 Slip pin (e), plate (f), gasket (d) and bushing (a) over screw (h). Insert screw through glass door (bushing (a) fits in hole of glass) and slip remaining gasket (d) and plate (f) over screw. Position inside handle (c) over screw. Thread screws into handle. Position back handle (b) over heads of screws and secure with set screws (g). Coloque la clavija (e), arandela (f), junta (d) y separador (a) sobre el tornillo (h). Inserte el tornillo por la puerta de vidrio (el separador (a) entra en el orificio del vidrio) y coloque la otra empaquetadura (d) y arandela (f) sobre el tornillo. Coloque la manija interior (c) en el tornillo. Ajuste los tornillos en la manija. Coloque la manija interior (b) sobre las cabezas de los tornillos y ajústela con los tornillos prisioneros (g). 15 15 Install bottom pivot bracket onto door glass as shown. Instale el soporte inferior del pivote en el vidrio de la puerta como se indica. Pivot bracket back Soporte trasero del pivote 8 9g Install door by first putting bottom pivot bracket into the bottom bushing. Then, put top front pivot with two gaskets into top pivot bushing. Angle door onto top pivot bracket and attach gaskets and pivot bracket back with screw. Instale la puerta colocando primero el pivote inferior dentro del cojinete correspondiente. Luego coloque el pivote superior frontal con dos empaquetaduras dentro del cojinete superior. Incline la puerta contra el soporte del pivote superior y coloque las empaquetaduras y la parte posterior del soporte con el tornillo. 18 9f 9b Pivot gasket empaquetadura del pivote Pivot bracket front Soporte frontal del pivote 9c 9h 9e 9a 9d 17 17 Measure and cut two pieces out of sweep gasket (20). Slide onto the bottom of the door. Notch to clear door frame when closed. Mida y corte el sello inferior (20) al tamaño adecuado y deslícela en el borde inferior de la hoja de la puerta. Hágale una muesca para que la puerta pase del marco cuando se cierre. 18 Caulk outside edges of shower as shown. 18 Calafatee los bordes exteriores del gabinete como se muestra. View from inside shower Vista desde adentro del gabinete 20 Notch Muesca © 2006 American Shower & Bath Corporation 11 CARE AND CLEANING For regular cleaning use only mild detergents or warm, soapy water applied with a soft cloth. Always rinse surfaces after cleaning and dry by blotting with a damp cloth or chamois. Because cleaning products often change over time, we cannot recommend a specific cleaner to use on this product. However, whichever you choose: • Always check the manufacturer’s instructions • DO NOT use a cleaner on this product if the label indicates it should not be used on plastics To make this product last its longest: • Always rinse off cleaners within 5 minutes of application • Rinse off cleaners even if they say they are “spray on & walk away” CUIDADO Y MANTENIMIENTO Para la limpieza normal, use únicamente detergentes suaves o agua enjabonada tibia aplicada con un trapo suave. Siempre enjuague las superficies luego de limpiarlas y séquelas con un trapo húmedo o gamuza. No le podemos recomendar un producto limpiador específico ya que varían con el tiempo. Sin embargo, cualquiera sea su opción: • Siga siempre las instrucciones del fabricante • NO USE un limpiador que no sirva para plásticos en este producto. Para hacer que este producto le dure al máximo: • Siempre enjuague los limpiadores dentro de los 5 minutos de haberlos colocado. • Enjuague los limpiadores incluso cuando sean del tipo “colóquelos y déjelos”. CUIDADO Y LIMPIEZA DE SU GABINETE DE DUCHA CARE AND CLEANING YOUR SHOWER Maintenance: Only use warm water and mild soap. CAUTION: Detergents or any abrasive cleaners may damage the door and shower. WARNING Use of any of the following will result in damage to the shower and will void the warranty. Citrus Orange (limonene cleaners), Solvents, Paint Remover, Lacquer Thinner, Varsol, Chlorinated Disinfectant Sprays, Industrial Degreasers, Cleaners containing, Isopropyl Alcohol, Abrasive Cleaners and Harsh Chemicals, Lysol, Dow Scrubbing Bubbles, Antifreeze and Pine Off Cleaners such as PineSol. Do not use products such as Tilex, Vim, Clean Shower or any similar corrosive products. If any adverse chemicals do come in contact with the shower surfaces, immediately rinse thoroughly with clean water. To prevent discoloration caused by ferrous or “hard” water, wipe the shower dry after each use and clean each week with warm water and a gentle soap (liquid soap for dishes). 5-YEAR LIMITED WARRANTY The manufacturer warrants to the original consumer purchaser that its products will be free of defects in materials and workmanship, subject to the limitations, exclusions and conditions that follow, from date of original purchase as shown on purchaser’s receipt. The manufacturer will, at its discretion replace or repair FREE OF CHARGE, during the warranty period, any part which the manufacturer determines to be defective in material and/or workmanship under normal installation, use and service. The original consumer purchaser must notify the manufacturer in writing of any defect covered by the warranty at the address listed. THIS WARRANTY IS THE ONLY EXPRESS WARRANTY MADE BY THE MANUFACTURER. ANY CLAIMS MADE UNDER THIS WARRANTY MUST BE MADE DURING THE PERIOD REFERRED TO ABOVE. ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE IS LIMITED IN DURATION TO THE DURATION OF THIS WARRANTY. LABOR CHARGES AND/OR DAMAGE INCURRED IN INSTALLATION, REPAIR OR REPLACEMENT AS WELL AS INCIDENTAL AND CONSEQUENTIAL DAMAGES CONNECTED THEREWITH ARE EXCLUDED AND WILL NOT BE PAID BY THE MANUFACTURER. Some states do not allow limitations on how long an implied warranty lasts, or the exclusion or limitation of incidental or consequential damages, so the above limitations or exclusions may not apply to you. This warranty gives you specific legal rights, and you may also have other rights which vary from state to state. This warranty is void for any damage to this product due to misuse, abuse, neglect, accident, improper installation, modification, unauthorized repair, or any use violative of instructions furnished by us. 12 P/N 27720 7/06 Mantenimiento: Use únicamente agua tibia y jabón delicado. CUIDADO: Los detergentes o limpiadores abrasivos pueden dañar la puerta y la ducha. ADVERTENCIA El uso de cualquiera de los siguientes productos dañará el gabinete. y anulará la garantía. Citrus Orange (limpiadores cítricos), Solventes, Quita Pinturas, Tíner, Varsol, Desinfectantes en Aerosol con Cloro, detergentes Industriales, Limpiadores con Alcohol Izopropílico, Limpiadores Abrasivos y Químicos Potentes, Lysol, Burbujas Limpiadoras Dow, Anticongelante y Limpiadores a base de Pino como PineSol. No use productos como Tilex, Vim, Clean Shower u otro producto corrosivo similar. Si cualquier producto químico abrasivo entra en contacto con las superficies del gabinete, enjuáguelas inmediatamente con agua limpia. Para evitar la decoloración causada por calcio o agua “dura”, seque la ducha luego de usarla y límpiela todas las semanas con agua tibia jabón delicado (jabón líquido para vajillas). GARANTÍA LIMITADA DE 5 AÑOS El fabricante le garantiza al comprador original que este producto no tendrá defectos de materiales y de mano de obra, sujeto a las limitaciones, exclusiones ni condiciones a continuación, desde la fecha original de compra indicada en el recibo. El fabricante, a su criterio, reemplazará o reparará SIN CARGO, durante el término de la garantía, cualquier parte que considere defectuosa en material y/o mano de obra bajo condiciones normales de instalación, uso y mantenimiento. El comprador original deberá notificar al fabricante por escrito acerca de cualquier defecto cubierto por la garantía a la dirección indicada. ESTA ES LA ÚNICA GARANTÍA EXPRESA DEL FABRICANTE. TODO RECLAMO HECHO BAJO ESTA GARANTÍA DEBE REALIZARSE DURANTE EL PERÍODO INDICADO ANTERIORMENTE. TODA GARANTÍA IMPLÍCITA DE CALIDAD O IDONEIDAD PARA UN PROPÓSITO EN PARTICULAR SE LIMITA A LA DURACIÓN DE ESTA GARANTÍA. LOS CARGOS DE MANO DE OBRA Y/O DAÑOS INCURRIDOS DURANTE LA INSTALACIÓN, REPARACIÓN O REEMPLAZO ASÍ COMO LOS DAÑOS FORTUITOS E IMPREVISTOS RELACIONADOS CON DICHAS ACTIVIDADES ESTÁN EXCLUIDOS Y NO SERÁN CUBIERTOS POR EL FABRICANTE. Algunos estados no permiten limitaciones con respecto a cuanto dura una garantía implícita o la exclusión o limitación de daños imprevistos o consiguientes, por lo tanto las exclusiones o limitaciones anteriores pueden no aplicarse en su caso. Esta garantía le otorga derechos legales específicos, y usted puede también tener otros derechos los que varían de estado a estado. Esta garantía quedará anulada en caso de daños al producto causados por uso inadecuado, abuso, negligencia, instalación inadecuada, modificaciones, reparaciones no autorizadas, o cualquier uso contrario a las instrucciones proporcionadas por nosotros.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12

none 39324 Guía de instalación

Tipo
Guía de instalación
Este manual también es adecuado para

en otros idiomas