INSTALLATION INSTRUCTIONS
Owens Corning
Deck Defense
®
High
Performance Roof Underlayment should be
applied to a properly prepared dry deck that
is smooth, clean and free from any depressions,
projections, or protruding nails. Roof decks
should be structurally sound and meet or exceed
minimum requirements of the deck manufacturer
and local codes.
Always follow safe roofing practices and OSHA
safety requirements. Always use and wear fall
protection devices when working on roofs. Some
examples are toe boards, rope and harness, and
soft-sole footwear. Use caution when walking or
standing on Owens Corning
Deck Defense High
Performance Roof Underlayment when wet or
dusty conditions exist that may reduce traction.
Failure to use proper safety gear and footwear
can result in serious injury.
NOTE
:
Owens Corning
Deck Defense High
Performance Roof Underlayment must be attached
to the roof deck using plastic or steel cap fasteners
having a minimum of 1" diameter cap.
Slopes 4' in 12" or more
Always lay Deck Defense underlayment parallel to
the eaves, lapping each course at least 3" over the
underlying course. Deck Defense underlayment
should not run perpendicular to the eaves. Secure
Deck Defense underlayment with cap nails that
are 1" in diameter placed in the printed nail areas
located on Deck Defense underlayment. See Fig. 1.
When installing underlayment over an extended
period up to 180 days, cap nails should be placed
in both the overlapping area and also the center
area of the underlayment. See Fig. 2. Nails should
be driven straight and flush with the surface. If
two or more pieces are required to continue
a course, lap the ends at least 4.' End laps in a
succeeding course should be located at least
6' from laps in the preceding course. Lap Deck
Defense underlayment a minimum of 6" from both
sides over all hips, ridges and valleys. Where the
roof meets a vertical surface, carry Deck Defense
underlayment at least 4" up the surface.
HIGH PERFORMANCE ROOF UNDERLAYMENT
Owens Corning
HIGH PERFORMANCE ROOF UNDERLAYMENT
12 " 12 " 12 "
Fig. 1 For Standard Application
Fig. 1
Para la instalación estándar
INSTRUCCIONES DE
INSTALACIÓN
La membrana de impermeabilización para techos
de alto desempeño membrana impermeabilizante
Deck Defense de Owens Corning
debe aplicarse
sobre una base seca preparada, que sea lisa, esté
limpia y no tenga irregularidades en la superficie
o clavos que sobresalgan. La base de los techos
debe contar con una estructura sólida y cumplir,
o superar, los requisitos mínimos exigidos por el
fabricante del techo y los códigos locales.
Siempre siga las prácticas de seguridad de
colocación de techos y los requisitos de seguridad
OSHA. Siempre utilice y lleve puesto dispositivos
para la protección de caídas al trabajar en techos.
Algunos ejemplos son: tablas para los pies, sogas y
arnés, y calzado de suela flexible. Tenga cuidado al
caminar o mantenerse parado sobre la membrana
de impermeabilización de alto rendimiento
membrana impermeabilizante Deck Defense de
Owens Corning
ya que si está mojada o tiene
polvo, el poder de tracción se verá reducido. Es
posible que si no utiliza el equipo y el calzado
adecuados pueda lesionarse.
NOTA
:
La membrana de impermeabilización de
alto rendimiento membrana impermeabilizante
Deck Defense de Owens Corning
debe sujetarse
a la base del techo utilizando piezas de fijación de
plástico o metal cuyo tope tenga un mínimo de
1 pulg.
Pendientes de 4 pulg. cada 12 pulg. o más
Siempre coloque la membrana de
impermeabilización de alto rendimiento membrana
impermeabilizante Deck Defense en forma paralela
a los aleros, superponiendo cada hilera por lo
menos 3 pulg. por sobre la hilera anterior.
Membrana impermeabilizante Deck Defense no
debe disponerse en forma perpendicular a los
aleros. Fije el membrana impermeabilizante Deck
Defense con clavos con topes de 1 pulg. de
diámetro colocados en las áreas impresas para
colocación de clavos que se encuentran en el
membrana impermeabilizante Deck Defense.
Vea la Fig. 1. Al instalar una membrana de
impermeabilización durante un tiempo
prolongado hasta 180 días, los clavos con tope
deben colocarse tanto en el área de
superposición como en el área central de la
membrana. Vea la Fig. 2. Los clavos deben penetrar
derechos y quedar a nivel de la superficie. Si
hacen falta dos o más piezas para continuar una
hilera, superponga los extremos por lo menos
4 pies. Los empalmes en la siguiente hilera deben
colocarse a por lo menos 6 pies de los empalmes
de los rollos en la hilera anterior. Superponga el
membrana impermeabilizante Deck Defense un
mínimo de 6 pulg. por ambos lados sobre las
limatesas, cumbreras y limahoyas. En el lugar
donde el techo se une con una superficie vertical,
lleve el membrana impermeabilizante Deck
Defense por lo menos 4 pulg. sobre esta superficie.
Deck Defense
®
High Performance Roof Underlayment
Installation Instructions
HIGH PERFORMANCE ROOF UNDERLAYMENT
Owens Corning
HIGH PERFORMANCE ROOF UNDERLAYMENT
6"6"6"6"6"6"6"
Fig. 2 For Application over an
Extended Period
Fig. 2 Para la instalación durante
un tiempo prolongado
Slopes 2" in 12" to less than 4" in 12"
On low slope applications, cover the deck with
two layers of Deck Defense underlayment. See
Fig. 3. Begin by fastening a 25"-wide strip of
Deck Defense underlayment placed along the
eaves. Place a full-width sheet over the starter
with a long edge placed along the eave and
completely overlapping the initial starter course.
All succeeding courses will be a minimum of 48"
wide and should be positioned to overlap the
preceding course by 25." Secure each course with
cap nails 1" in diameter placed in the nailing area
every 6" in the overlap area and 12" in the center
of Deck Defense underlayment to hold it in place
until the shingles are applied. End laps should be
12" wide and nailed every 4" from the edge. Also
ensure end laps are located at least 6' from end
laps in the preceding course.
El Cuidado: El techo puede estar
resbaloso: Especialmente cuando está
mojado o cubierto de hielo. Al realizar
la instalación, utilice un sistema de
protección contra las caídas. Utilice
zapatos con suela de goma. Camine
con cuidado.
Peligro de caída de objetos: Asegure el
área que se encuentra debajo de la zona
de trabajo y los materiales que están
sobre el techo. Los materiales que no
estén sujetos pueden caerse del techo.
Colóquelos en un lugar sin pendiente o
sujételos para que no se caigan. Use un
casco resistente.
Precaución: Siempre deben utilizarse
anteojos de seguridad al cortar el techo
con una herramienta eléctrica.
Al realizar la instalación, utilice guantes
para evitar cortes y rasguños.
OWENS CORNING ROOFING AND ASPHALT, LLC
ONE OWENS CORNING PARKWAY
TOLEDO, OHIO, USA 43659
1-800-GET-PINK
®
ww w.roofing.owenscorning.com
Pub. No. 100109 29 -A . Printed in U. S.A. March 2012. THE P INK PANT HER
& © 1964 –2012
Metro-Goldwyn-Mayer Studios Inc. All Rights Reserved. The color PINK is a registered
trademark of Owens Corning. ©2012 Owens Corning. All Rights Reserved.
Para las pendientes de 2 pulg. cada 12 pulg.,
hasta menos de 4 pulg. cada 12 pulg.
En aplicaciones de poca pendiente, cubra la
estructura base del techo con dos capas de
membrana impermeabilizante Deck Defense. Vea
la Fig. 3. Comience colocando una tira de 25 pulg.
de ancho de membrana impermeabilizante
Deck Defense a lo largo de los aleros. Coloque
una plancha completa sobre la hilera inicial, con
el borde más largo colocado a lo largo del alero.
Esta plancha se debe superponer totalmente a
la hilera inicial. Todas las hileras siguientes deben
tener un ancho mínimo de 48 pulg. y deben
colocarse de manera tal que 25 pulg. queden
superpuestas a la hilera anterior. Coloque cada
hilera utilizando clavos con tope de 1 pulg. de
diámetro, colocados en el área de clavado, cada
6 pulg. en el área de superposición y 12 pulg. en
el centro del membrana impermeabilizante Deck
Defense para sujetarlo hasta que se coloquen las
tejas. Las superposiciones de los extremos de los
rollos deben tener un ancho de 12 pulg. y estar
clavadas cada 4 pulg. del borde. Además, debe
asegurarse de que las superposiciones de los
extremos de los rollos se encuentren a por lo
menos 6 pies de las superposiciones de la hilera
anterior.
HIGH PERFORMANCE ROOF UNDERLAYMENT
Owens Corning
HIGH PERFORMANCE ROOF UNDERLAYMENT
HIGH PERFORMANCE ROOF UNDERLAYMENT
Owens Corning
Fig. 3 Low Slope Application
Fig. 3 Instalación en poca pendiente
25"
Caution: Roof surface may be slippery,
especially when wet or icy. Use a fall
protection system when installing. Wear
rubber-soled shoes. Walk with care.
Falling Hazard: Secure area below work
and materials on roof. Unsecured
materials may slide on roof. Place on level
plane or secure to prevent sliding. Wear a
hard hat.
Caution: Safety glasses should always
be worn when cutting the roof with a
power tool.
Wear gloves when installing to avoid cuts
and abrasions.

Transcripción de documentos

Deck Defense® High Performance Roof Underlayment Installation Instructions Always follow safe roofing practices and OSHA safety requirements. Always use and wear fall protection devices when working on roofs. Some examples are toe boards, rope and harness, and soft-sole footwear. Use caution when walking or standing on Owens Corning™ Deck Defense High Performance Roof Underlayment when wet or dusty conditions exist that may reduce traction. Failure to use proper safety gear and footwear can result in serious injury. NOTE: Owens Corning™ Deck Defense High Performance Roof Underlayment must be attached to the roof deck using plastic or steel cap fasteners having a minimum of 1" diameter cap. Slopes 4' in 12" or more Always lay Deck Defense underlayment parallel to the eaves, lapping each course at least 3" over the underlying course. Deck Defense underlayment should not run perpendicular to the eaves. Secure Deck Defense underlayment with cap nails that are 1" in diameter placed in the printed nail areas located on Deck Defense underlayment. See Fig. 1. When installing underlayment over an extended period up to 180 days, cap nails should be placed in both the overlapping area and also the center area of the underlayment. See Fig. 2. Nails should be driven straight and flush with the surface. If two or more pieces are required to continue a course, lap the ends at least 4.' End laps in a succeeding course should be located at least 6' from laps in the preceding course. Lap Deck Defense underlayment a minimum of 6" from both sides over all hips, ridges and valleys. Where the roof meets a vertical surface, carry Deck Defense underlayment at least 4" up the surface. Fig. 1 For Standard Application Fig. 1 Para la instalación estándar 12" 12" 12" Owens Corning ™ HIGH PERFORMANCE ROOF UNDERLAYMENT Fig. 2 For Application over an Extended Period Fig. 2 Para la instalación durante un tiempo prolongado 6" 6" 6" 6" 6" 6" 6" Owens Corning HIGH PERFORMANCE ROOF UNDERLAYMENT HIGH PERFORMANCE ROOF UNDERLAYMENT Owens Corning™ Deck Defense® High Performance Roof Underlayment should be applied to a properly prepared dry deck that is smooth, clean and free from any depressions, projections, or protruding nails. Roof decks should be structurally sound and meet or exceed minimum requirements of the deck manufacturer and local codes. HIGH PERFORMANCE ROOF UNDERLAYMENT INSTALLATION INSTRUCTIONS ™ INSTRUCCIONES DE INSTALACIÓN La membrana de impermeabilización para techos de alto desempeño membrana impermeabilizante Deck Defense de Owens Corning™ debe aplicarse sobre una base seca preparada, que sea lisa, esté limpia y no tenga irregularidades en la superficie o clavos que sobresalgan. La base de los techos debe contar con una estructura sólida y cumplir, o superar, los requisitos mínimos exigidos por el fabricante del techo y los códigos locales. Siempre siga las prácticas de seguridad de colocación de techos y los requisitos de seguridad OSHA. Siempre utilice y lleve puesto dispositivos para la protección de caídas al trabajar en techos. Algunos ejemplos son: tablas para los pies, sogas y arnés, y calzado de suela flexible. Tenga cuidado al caminar o mantenerse parado sobre la membrana de impermeabilización de alto rendimiento membrana impermeabilizante Deck Defense de Owens Corning™ ya que si está mojada o tiene polvo, el poder de tracción se verá reducido. Es posible que si no utiliza el equipo y el calzado adecuados pueda lesionarse. NOTA: La membrana de impermeabilización de alto rendimiento membrana impermeabilizante Deck Defense de Owens Corning™ debe sujetarse a la base del techo utilizando piezas de fijación de plástico o metal cuyo tope tenga un mínimo de 1 pulg. Pendientes de 4 pulg. cada 12 pulg. o más Siempre coloque la membrana de impermeabilización de alto rendimiento membrana impermeabilizante Deck Defense en forma paralela a los aleros, superponiendo cada hilera por lo menos 3 pulg. por sobre la hilera anterior. Membrana impermeabilizante Deck Defense no debe disponerse en forma perpendicular a los aleros. Fije el membrana impermeabilizante Deck Defense con clavos con topes de 1 pulg. de diámetro colocados en las áreas impresas para colocación de clavos que se encuentran en el membrana impermeabilizante Deck Defense. Vea la Fig. 1. Al instalar una membrana de impermeabilización durante un tiempo prolongado hasta 180 días, los clavos con tope deben colocarse tanto en el área de superposición como en el área central de la membrana. Vea la Fig. 2. Los clavos deben penetrar derechos y quedar a nivel de la superficie. Si hacen falta dos o más piezas para continuar una hilera, superponga los extremos por lo menos 4 pies. Los empalmes en la siguiente hilera deben colocarse a por lo menos 6 pies de los empalmes de los rollos en la hilera anterior. Superponga el membrana impermeabilizante Deck Defense un mínimo de 6 pulg. por ambos lados sobre las limatesas, cumbreras y limahoyas. En el lugar donde el techo se une con una superficie vertical, lleve el membrana impermeabilizante Deck Defense por lo menos 4 pulg. sobre esta superficie. Fig. 3 Low Slope Application Fig. 3 Instalación en poca pendiente HIGH PERFORMANCE ROOF UNDERLAYMENT ™ 25" Owens Corning HIGH PERFORMANCE ROOF UNDERLAYMENT HIGH PERFORMANCE ROOF UNDERLAYMENT Owens Corning ™ Slopes 2" in 12" to less than 4" in 12" On low slope applications, cover the deck with two layers of Deck Defense underlayment. See Fig. 3. Begin by fastening a 25"-wide strip of Deck Defense underlayment placed along the eaves. Place a full-width sheet over the starter with a long edge placed along the eave and completely overlapping the initial starter course. All succeeding courses will be a minimum of 48" wide and should be positioned to overlap the preceding course by 25." Secure each course with cap nails 1" in diameter placed in the nailing area every 6" in the overlap area and 12" in the center of Deck Defense underlayment to hold it in place until the shingles are applied. End laps should be 12" wide and nailed every 4" from the edge. Also ensure end laps are located at least 6' from end laps in the preceding course. Caution: Roof surface may be slippery, especially when wet or icy. Use a fall protection system when installing. Wear rubber-soled shoes. Walk with care. Falling Hazard: Secure area below work and materials on roof. Unsecured materials may slide on roof. Place on level plane or secure to prevent sliding. Wear a hard hat. Para las pendientes de 2 pulg. cada 12 pulg., hasta menos de 4 pulg. cada 12 pulg. En aplicaciones de poca pendiente, cubra la estructura base del techo con dos capas de membrana impermeabilizante Deck Defense. Vea la Fig. 3. Comience colocando una tira de 25 pulg. de ancho de membrana impermeabilizante Deck Defense a lo largo de los aleros. Coloque una plancha completa sobre la hilera inicial, con el borde más largo colocado a lo largo del alero. Esta plancha se debe superponer totalmente a la hilera inicial. Todas las hileras siguientes deben tener un ancho mínimo de 48 pulg. y deben colocarse de manera tal que 25 pulg. queden superpuestas a la hilera anterior. Coloque cada hilera utilizando clavos con tope de 1 pulg. de diámetro, colocados en el área de clavado, cada 6 pulg. en el área de superposición y 12 pulg. en el centro del membrana impermeabilizante Deck Defense para sujetarlo hasta que se coloquen las tejas. Las superposiciones de los extremos de los rollos deben tener un ancho de 12 pulg. y estar clavadas cada 4 pulg. del borde. Además, debe asegurarse de que las superposiciones de los extremos de los rollos se encuentren a por lo menos 6 pies de las superposiciones de la hilera anterior. El Cuidado: El techo puede estar resbaloso: Especialmente cuando está mojado o cubierto de hielo. Al realizar la instalación, utilice un sistema de protección contra las caídas. Utilice zapatos con suela de goma. Camine con cuidado. Caution: Safety glasses should always be worn when cutting the roof with a power tool. Wear gloves when installing to avoid cuts and abrasions. Peligro de caída de objetos: Asegure el área que se encuentra debajo de la zona de trabajo y los materiales que están sobre el techo. Los materiales que no estén sujetos pueden caerse del techo. Colóquelos en un lugar sin pendiente o sujételos para que no se caigan. Use un casco resistente. Precaución: Siempre deben utilizarse anteojos de seguridad al cortar el techo con una herramienta eléctrica. Al realizar la instalación, utilice guantes para evitar cortes y rasguños. OWENS CORNING ROOFING AND ASPHALT, LLC ONE OWENS CORNING PARKWAY TOLEDO, OHIO, USA 43659 1-800-GET-PINK® www.roofing.owenscorning.com Pub. No. 10010929-A. Printed in U.S.A. March 2012. THE PINK PANTHER™ & © 1964–2012 Metro-Goldwyn-Mayer Studios Inc. All Rights Reserved. The color PINK is a registered trademark of Owens Corning. ©2012 Owens Corning. All Rights Reserved.