CAMBRIDGE Olde English Paver Outdoor Fireplace Kit Manual de usuario

Tipo
Manual de usuario
Manual de Instrucciones para la
Chimenea de Cambridge Olde Ingles
Ladrillos Pre-Empaquetado para Uso
Afuera
Cambridge Pre-Packaged
Olde English Paver Outdoor Fireplace Kit
Instruction Manual
2015
2
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer Reference Guide: Guía de Referencia:
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
Finished
7
6
Grade
5
4
3
2
1
Foundation Layer
2 3/4” Above Top of Foundation
2015
3
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Cambridge Fireplace
This unit is capable of burning natural gas, propane and wood. If either propane or natural gas is the
preferred method of burning, seek a licensed professional plumber before construction. Also, if using
propane or natural gas, a knockout is located on either side of the unit to facilitate gas piping. All pip-
ing and knockouts must be completed before installing blocks around unit as the unit will become inac-
cessible when construction is completed.
Tools Required for Fireplace Kit Installation:
Safety Goggles
Ear Protection
Dust Mask
Gloves
Shovels (digging & flat)
Metal Cutters for banding on cubes
Mason Hammer (chipping, hammer)
Road Stone Rake
Tamper (Hand or Mechanical)
Wheelbarrow
Level (2’ and 6’ recommended)
Speed Square
Caulk Gun 10 oz or 28 oz (depends on what size
adhesive is purchased)
Rubber Mallet
14” Demo saw with diamond blade
Tape Measure
Marking Device (pencil, soap stone, etc)
Chalk Line
Hand Broom
Concrete Tools (Trowel/Floats)
6 Foot ladder or scaffold according to your com-
pany’s state, and OSHA safety policy
Drill & 1/16” bit
5/16” nut driver
7 ¼” Circular saw with wood blade
4” Electric grinder
4” Diamond cup grinder
Items Included in the Fireplace Kit:
1 - Stainless Steel Fireplace with instruction manual
1 - 4 Foot air-cooled chimney
1 - Black powder coated termination cap
1 - Galvanized flashing for top of completed fireplace
2 - Reinforced concrete lintels 48” x 4” x 6”
4 - Reinforced concrete lintels 32” x 4” x 6”
3 - Plastic shim pack sheet for leveling lintels or
block as needed
6 - Precut 6”x 6” imported polished granite tile for
facing front of fireplace lintel
3 - Cubes of Cambridge Olde English Pavers
1 - Installation manual for concrete pad and Olde
English Pavers
Material Required:
¾” clean stone (approx. 1 ton)
Concrete (approx. 17-80 lb bags)
Cambridge concrete adhesive (approx. 6-29 oz. or 17
-10.3 oz. tubes)
(4 pcs) 2” x 4” x 8’ lumber
2 ½” wood screws
½” rebar (approx. 14’)
Silicone for flashing
* Estimated man hours for construction of the fire-
place will be 5 to 8 hours based on (2, 3, or 4) man
crew with moderate experience.
2015
4
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Chimenea de Cambridge:
Esta unidad es capaz de quemar el gas natural, el propano y la madera. Si el propano o el gas natural es
el método preferido de quema, busque a un plomero profesional autorizado antes de construcción. Tam-
bién, si usa el propano o el gas natural, un golpe de gracia está situado de cualquier lado de la unidad
para facilitar la instalación de tubos de gas. Toda la tubería y golpes de gracia deben ser terminados
antes de instalar bloques alrededor de la unidad pues la unidad llegará a ser inaccesible cuando se ter-
mina la construcción.
Herramienta requerida para la instalacion del
kit:
Anteojos de seguridad
Protecci n auditiva
Máscara de polvo
Guantes
Palas (& de excavaci n; Plano) Cortadores del
metal (para congregar en los cubos)
Martillo del mas n (que salta el & Martillo)
Rastrillo de piedra
Pis n (mano o mecánicos)
Carretilla
Nivel (2’ y 6’ recomendado)
Cuadrado de la velocidad
Calafatee el arma 10oz. o 28oz. (depende encen-
dido se compra qué pegamento del tamaño)
Mazo de goma
14” Sierra de versi n parcial de programa con-
sider con la lámina del diamante
Cinta métrica
Dispositivo de la marca (lápiz, piedra del jab n,
etc.)
Línea de tiza
Escoba de la mano
Herramientas concretas (paletas y flotadores)
Escala o andamio de 6Ft según su company’s
estado, y de la política de seguridad de OSHA;
Taladro y 1/16” pedacito
5/16” Aprietatuerca
7 1/4” Sierra Circular con la lámina de madera
4” Amoladora eléctrica
4” Amoladora de la taza del diamante
Artículos Incluidos en el Kit de Chimenea:
1-de acero inoxidable de chimenea con manual de
instrucciones
1-4 pies chimenea enfriado por aire
1-Polvo Negro tapa de terminación de cubierta
1-Galvanizado intermitente para la tapa de la chime-
nea completa
2-Dinteles de hormigón armado de 48”x4”x 6”
4-Dinteles de hormigón armado de 32”x4”x 6”
3-Hoja plástico de calza para nivelar dinteles o blo-
quear cuando sea necesario
6-6”x 6” Granito pulido importado
3-Cubos de Olde Inglés ladrillos
1-Manual de instalación para la plataforma de con-
creto y ladrillos Olde Inglés
Material Necesario:
¾” piedra limpia (aprox. 1 tonelada)
Concreto (aprox. 17 bolsas de 80 libras)
Cambridge adhesivo (aprox. 6-29 oz. o 17-10.3 oz.
tubos)
(4 piezas) de 2”x 4” x 8’de madera
2 ½” tornillos para madera
½” barra de refuerzo (aprox. 14’)
Silicona para el flasheo
*Las horas de trabajo estimadas para la construc-
cion de la chimenea seran 5 a 8 horas con (2, 3, o 4)
hombres con experiencia mederada.
2015
5
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Fireplace Concrete Pad Construction:
Call 811 for information on underground utility marking. Select desired location and excavate 52” L x
65 3/4” W x 12 3/4” D area for concrete pad. Fill excavated area with approximately 6” of ¾” clean
gravel, compacting every 3”. Frame remaining 4” with 2” x 4” lumber to create a level pad. (Be sure 2”
x 4” wood frame is perfectly level, front to back and side to side) See attached drawing for details of
steel reinforcement rod placement. Fill 2” x 4” wood frame with a 4,000 psi strong concrete mix.
*Allow pad to cure for minimum of 48 hours.
*Note: (Wood Box Additions) If you are going to add fire wood box extensions, either a single unit or a
set, it will be necessary to construct an additional concrete pad for each unit added.
Construccion concreta del cojín de la chimenea:
Llamada 811 para la información sobre la marca para uso general subterráneo. Seleccione deseó la local
-ización y excavan 52” L x 65 3/4” W x 12 3/4” D áreas para el cojín concreto. Instale cuatro 8” tubos
concretos del diámetro a la helada-línea según código local. Llene el área excavada de aproximada-
mente 6” de ¾” grava limpia, compactando cada 3”. Capítulo 4” restantes con madera de construcción
de 2” x 4” para crear un cojín nivel. (Sea sure el marco de madera 2” x 4” es perfectamente nivel, frente
ha atrás y lado a lado) vea el dibujo atado para los detalles de la colocación de acero de la barra del re-
fuerzo. Llene el marco de madera de los tubos concretos y de 2” x 4” de una mezcla de hormigón fuerte
de 4,000 PSI.
*Permita que el cojín cure para el mínimo de 48 horas.
*Note: (Adiciones para la caja de lena) Si usted va a agregar las extensiones de madera de la caja del
fuego, una sola unidad o un sistema será necesario construir los cojines concretos adicionales para cada
unidad agregada.
2015
6
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Fireplace Concrete Pad Detail-Cross Section Drawing /Concreta del cojín de la
chimenea detail-Dibujo Seccionado Transversalmente
A. 1/2” steel reinforcing rod / Barra de refuerzo de 1/2”
B. 4” concrete slab / Bloque de cemento de 4”
C. 6” of ¾ clean stone / 6” de ¾ grave limpia
Top View-Footing Detail / Vision Superior-Detaile De Pie
10”
6”
4”
A B C
52”
65 3/4”
2015
7
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Stones Included In The Kit:
48” Lintel (1 Piece)
40” Lintel (1 Piece)
32” Lintel (4 Pieces) 4”x4” Cut Stone (1 Piece)
Large (157 Pieces) Large to remove 3 ½” x 5 ½” (2 Pieces) Large to remove 3” x 8” (2 Pieces)
4”x4”
2015
8
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
5 1/2”x4 1/4” Small (2 Pieces) Small to remove 1”x1 1/2” (1 Piece) 1 1/2”x6 13/16”Small (1 Piece)
8 1/4”x5 1/2” Medium (7 Pieces) Cut Medium to remove 1 1/2”x1 1/2” (2 Pieces) Small (247 Pieces)
8 1/4”x8 1/4” Large (1 Piece) Medium (82 Pieces) 6 3/4”x6 3/4” Medium (1 Pieces)
Large to remove 3”x4” (1 Piece) Large to remove 3”x3” (1 Piece) 8 13/16”x8 13/16” Large (2 Pieces)
2015
9
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Additional Cut Stones
Large notch cut 1 1/2” x 1 1/2”
offset by 4”
(13 Pieces)
Large notch cut 1 1/2” x 1 1/2”
(15 Pieces)
2015
10
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Pad:
Mark a line 4” in on all sides on the concrete pad
to mark the outside perimeter of the fireplace.
Apply concrete adhesive and install per photo.
Capa 1:
Marque una línea 4” de todo los lados del cojín de
concreto a marca el perímetro exterior de la chi-
menea.
Aplique el pegamento concreto e instálelo por la
foto.
2015
11
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 1-A:
Firebox Placement: Install firebox in the center
of the pad. Attach 4ft air-cooled chimney per
manufactures instructions enclosed in the fire-
box.
Capa 1-A:
Colocacion de la caja de fuegos:
Instale el unidad de la caja de fuegos 8 ¼” de la
del frente de la capa 1 y 9” adentro en lado
izquierdo y derecho. Ate la chimenea refrigerada
de 4 pies por fabrica la instruccion.
2015
12
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 1-B:
Remove firebox top support with a Phillips
screwdriver. Take the 8 screws out removing the
firebox top face support. This will not be needed
for the install. See photo for details.
Capa 1-B:
Quite la ayuda de tapa del lugar de la caja de fue-
gos con un destornillador de Philips. Tome los 8
tornillos hacia fuera que quitan la caja de fuegos
ayuda de cara superior. Esto no será necesario
para la instalaci n. Vea la foto para los detalles.
2015
13
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 1:
Piece Count = (2) Small, (3) Medium, (8) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Apply concrete adhesive and install per photo.
Capa 1:
Numero de piezas = (2) Pequeño, (3) Mediano,
(8) Grande, (1) Grande 1 1/2“x1 1/2“,
(1) Grande 1 1/2“x 1 1/2“ offset 4“
Aplique el pegamento concreto e instálelo por la
foto.
Large notch
cut 1 1/2” x
1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
2015
14
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 2:
Piece Count = (2) Small, (3) Medium, (8) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Apply concrete adhesive and install per photo.
Capa 2:
Numero de piezas = (2) Pequeño, (3) Mediano,
(8) Grande,
Aplique el pegamento concreto e instálelo por la
foto.
Large notch
cut 1 1/2” x
1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
2015
15
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 3: Hearth Layer
Piece Count = (2) Small, (3) Medium, (12) Large,
(1) Large notch cut 1 1/2” x 1 1/2”
Hearth will overhang 5 ¾” past layer 3 in the
front of the fireplace.
Apply concrete adhesive and install per photo.
Capa 3 Capa del Hogar
Numero de piezas = (2) Pequeño, (3) Mediano, (12)
Grande , (1) Grande 1 1/2”x 1 1/2”
El hogar sobresaldrá por capa 3 del pasado de 5
¾” en el frente de la chimenea.
Aplique el pegamento concreto e instálelo por la
foto.
Large notch cut
1 1/2” x 1 1/2”
2015
16
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 4:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Capa 4:
Numero de piezas = (2) Pequeño, (2) Mediano, (6)
Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1
1/2”x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
8 1/2”
5 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
2015
17
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 5:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”,
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Capa 5:
Numero de Piezas = (2) Pequeño, (2) Mediano,
(6) Grande Corte, (1) Mediano 8 ¼” x 5 ½”, (1)
Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2”x 1 1/2”
offset 4”
Aplique el pegamento concreto e instálelo por la
foto.
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
8 1/2”
5 1/2”
2015
18
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 6:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Capa 6:
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
8 1/2”
5 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
2015
19
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 7:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
8 1/2”
5 1/2”
Capa 7:
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
2015
20
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 8:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
8 1/2”
5 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
Capa 8:
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
2015
21
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 9:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
8 1/2”
5 1/2”
Capa 9:
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
2015
22
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 10:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo
8 1/2”
5 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
Capa 10:
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
2015
23
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 11:
Piece Count = (2) Small, (2) Medium, (6) Large ,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
8 1/2”
5 1/2”
Capa 11:
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
2015
24
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 11-A: Lintel Placement
Cut (1) 48” lintel down in size to 40”
Install lintel 9” from left and right side &
4 ¼” from front.
Apply concrete adhesive and install per photo.
Capa 11-A: Colocacion del Dintel
Corte (1) 48” dintel ha 40”
Instale el dintel 9” de lado izquierdo y derecho &
4 ¼” del frente.
Aplique el pegamento concreto e instálelo por la
foto.
4 1/4”
9”
9”
2015
25
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 12:
Piece Count = (2) Small, (2) Medium, (5) Large,
(1) Small Cut 4 ¼” x 5 ½”,
(1) Large cut to remove a corner piece that is 3
½” x 5 ½”,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Apply concrete adhesive and install per photo.
Capa 12:
Numero de piezas = (2) Pequeño, (2) Mediano, (5)
Grande
Corte (1) Pequeño 4 ¼” x 5 ½”
Corte (1) Grande para quitar un pedazo de la es-
quina que sea 3 ½”x 5 ½”, (1) Grande 1 1/2”x 1
1/2”, (1) Grande 1 1/2”x 1 1/2” offset 4”
Aplique el pegamento concreto e instálelo por la
foto.
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
5 1/2”
3 1/2”
Small
5 1/2”
4 1/4”
2015
26
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 13:
Piece Count = (2) Small, (2) Medium, (5) Large
Cut (1) Small to 4 ¼” x 5 ½”,
Cut (1) Large to remove a corner piece that is 3
½” x 5 ½”,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Apply concrete adhesive and install per photo.
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
Small
5 1/2”
4 1/4”
5 1/2”
3 1/2”
Capa 13:
Numero de piezas = (2) Pequeño, (2) Mediano, (5)
Grande
Corte (1) Pequeño 4 ¼” x 5 ½”
Corte (1) Grande para quitar un pedazo de la es-
quina que sea 3 ½”x 5 ½”, (1) Grande 1 1/2”x 1
1/2”, (1) Grande 1 1/2”x 1 1/2” offset 4”
Aplique el pegamento concreto e instálelo por la
foto.
2015
27
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 14:
Piece Count = (2) Small, (2) Medium, (8) Large,
(1) Large cut to 8 1/4”x 8 1/4”,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Apply concrete adhesive and install per photo.
Capa 14:
Numero de piezas = (2) Pequeño, (2) Mediano, (8)
Grande, (1) Grande 1 1/2” x 1 1/2”, (1) Grande 1
1/2”x 1 1/2” offset 4”
Corte (1) Grande 8 1/4”x 8 1/4”
Aplique el pegamento concreto e instálelo por la
foto.
8 1/4”
Large
Large notch cut
1 1/2” x 1 1/2”
offset by 4”
Large notch cut
1 1/2” x 1 1/2”
2015
28
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 15:
Piece Count = (2) Small, (2) Medium, (10) Large
Cut (1) Large to 8 1/4” x 8 1/4”
Apply concrete adhesive and install per photo.
Capa 15:
Numero de piezas = (2) Pequeño, (2) Mediano, (10)
Grande, (1) Grande 8 1/4”x 8 1/4”
Aplique el pegamento concreto e instálelo por la
foto.
8 1/4”
Large
2015
29
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 15-A: Lintel Placement
Install (1) 48” lintel – 4 ¾” in from left and right
sides and 9 ¾” in from front face. See photo de-
tails.
Apply concrete adhesive and install per photo.
Capa 15-A: Curso del Dintel
Instale (1) 48” dintel - 4 ¾” en derechos delanteros
y 9 3/4” adentro de cara delantera.
Vea los detalles de la foto.
Aplique el pegamento concreto e instálelo por la
foto.
9 3/4”
4 3/4”
4 3/4”
48” Lintel
2015
30
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 16:
Piece Count = (2) Small, (3) Medium, (8) Large
Cut (1) Large piece to remove a 3 ½” x 4”
notched piece.
Cut (1) Large piece to remove a 3 ½” x 5 ½ ”
corner.
Cut (1) Large to 8 1/4” x 8 1/4”
Apply concrete adhesive and install per photo.
Capa 16:
Numero de piezas = (2) Pequeño, (3) Mediano,
(8) Grande
Corte (1) Grande pedazo para quitar un 3 ½ ” x
4” pedazo dede una esquina.
Corte (1) Pedazo grande para quitar un pedazo
hecho muescas en de 3 1/2” x 5 1/2”.
Corte (1) Pedazo grande para quitar una esquina
de 8 1/4” x 8 1/4”.
Aplique el pegamento concreto e instálelo por la
foto.
4”
3 1/2””
8 1/4”
5 1/2”
3 1/2”
Large
2015
31
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 17:
Piece Count = (2) Medium, (10) Large
Caution: On the front of the fireplace, over-
hanging stones will not be able to support them-
selves and will require added weight from the
next layer (#18) to hold it in place. Temporary
stones can be laid on top of the overhanging
stones until the next layer is permanently in-
stalled.
Cut (2) Large pieces to be 8 1/4” x 8 1/4”.
Cut (2) Large pieces to remove a 3” x 8” piece
from a corner.
Cut (2) Large pieces to 9 1/2” and remove a 3 x 1
1/2” piece from a corner.
Install 1 ½” over-hang on left and right sides and
3 ¾” in front. Back will be flush.
Apply concrete adhesive and install per photo.
Capa 17:
Numero de Piezas = (2) Mediano, (10) Grande
Precauci n: En el frente de la chimenea las piedras
sobresalientes no podrán apoyarse y re-querirán
agregaron el peso de la capa siguiente (#18) para
llevarla a cabo en el lugar. Las piedras temporales
se pueden poner encima de unidades colgantes ex-
cesivas hasta que la capa siguiente esté instalada
permanentemente.
Corte (2) Pedazo Grande para quitar un 8 1/4” x8
1/4” pedazo de una esquina.
Corte (2) Pedazos grandes para ser 3” x 8 ”.
Corte (2) Pedazos grandes para quitar un pedazo
de 9 1/2” and remove 3x1 1/2” de una esquina.
Instale 1 ½” proyección en lados izquierdos y
derechos y 3 ¾” en frente. La parte posterior será
rasante.
Aplique el pegamento concreto e instálelo por la
foto.
Cut Large to 8 1/4” Long
8 1/4”
8 1/4”
9 1/2” 9 1/2”
8”
8”
3”
3”
1 1/2”
1 1/2”
3”
3”
Cut Large to 9 1/2”
Long and cut 3 x 1 1/2”
from a corner
Cut Large to 9 1/2”
Long and cut 3 x 1 1/2”
from a corner
2015
32
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 17-A: Lintel Placement
Install (4) 32” lintels 16” from the left and
right side 4” from the back.
Apply concrete adhesive and install per photo.
Capa 17-A: Colocacion del Dintel
Instale (4) 32” dinteles 16” el lado izquierdo y
del derecho 4” de la parte posterior.
Aplique el pegamento concreto e instálelo por la
foto.
16”
16”
4”
4”
2015
33
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 18:
Piece Count = (12) Small, (4) Medium, (4) Large
Install 3 ½” step-in on left and right side and 8
1/4” step-in on front. Back is flush.
Apply concrete adhesive and install per photo.
Capa 18:
Numero de piezas = (12) Pequeño, (4) Mediano, (4)
Grande
Instale 3 ½” paso en lados izquierdos y derechosy
8 1/4” paso en frente. La parte posterior es
rasante.
Aplique el pegamento concreto e instálelo por la
foto.
8 1/4”
3 1/2” 3 1/2”
2015
34
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 19:
Piece Count = (10) Small, (11) Medium
Cut (1) Small piece to create a 4” x 4” piece.
Cut (1) Medium to create a 6 ¾” x 6 ¾” piece.
Install 4” step-in on left and right sides. Front
and back are flush.
Apply concrete adhesive and install per photo.
Capa 19:
Numero de piezas = (10) Pequeño, (11) Mediano
Corte (1) Pequeño pedazo para crear un pedazo
de 4” x 4”.
Corte (1) Medio para crear un 6 ¾” x 6 ¾”
pedazo .
Instale 4” paso en lados izquierdos y derechos. El
frente y la parte posterior son rasantes.
Aplique el pegamento concreto e instálelo por la
foto.
2015
35
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 20:
Piece Count = (16) Medium
Install 4 ½” step-in on left and right sides.
Front and back are flush.
Apply concrete adhesive and install per photo.
Capa 20:
Numero de piezas = (16) Mediano
Instale el 4 ½” paso en lados izquierdos y dere-
chos. El frente y la parte posterior son rasantes.
Aplique el pegamento con-creto e instálelo por la
foto.
2015
36
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 21:
Piece Count = (16) Small
Install 2” step-in on left and right sides and 4”
step-in on front and back.
Apply concrete adhesive and install per photo.
Capa 21:
Numero de piezas = (16) Pequeña
Instale 2” paso en lados izquierdos y derechos y 4”
paso en frente y detrás.
Aplique el pegamento concreto e instálelo por la
foto.
2015
37
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 22:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Capa 22:
Numero de piezas = (16) Pequeña
Aplique el pegamento concreto e instálelo por la
foto.
2015
38
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 23:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Capa 23:
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
2015
39
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 24:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Capa 24:
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
2015
40
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 25:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Capa 25:
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
2015
41
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 26:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Capa 26:
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
2015
42
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 27:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Capa 27:
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
2015
43
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 28:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Capa 28:
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
2015
44
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 29:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Capa 29:
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
2015
45
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 30:
Piece Count = (28) Small
Cut (1) Small piece to 1 ½” x 6 13/16”.
Install a 1 1/4” overhang on left and right side
2” overhang on front and back.
Apply concrete adhesive and install per photo.
Capa 31:
Numero de piezas = (28) Pequeño
Corte (1) Pequeño pedazo a 1 ½” x 6 13/16”.
Instale una 1 1/4”proyeccion de lado izquierdo y
derecho y una 2” proyeccion de frente y detrás.
Aplique el pegamento concreto e instálelo por la
foto.
2015
46
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Chase Flashing • El destellar de la persecución
Chase flashing with collar facing up.
Persecucion que destella con el revestimiento del collar para arriba.
2015
47
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 32:
Once the chimney has been centered, take the
chase flashing with the collar up and slide it
onto the termination cap sleeve until it is flush
with the bottom of the termination cap. (See
Photo Bottom Left) See picture detail of how
the termination cap chase flashing and chim-
ney section should line up inside the block
chimney cavity. (See Photo Bottom Right)
Take the entire assembly to the top of the fire-
place chimney, carefully slide the termination
cap sleeve into the chimney section while rotat-
ing left to right so the sections line up and
sleeve together.
Capa 32:
Una vez que se ha centrado la chimenea tome la
persecuci n que destella con el collar para arriba
y deslícela encendido hacia la manga del casquillo
de la terminacion hasta que sea rasante con la
parte inferior del casquillo de la terminaci n.
(Véase la foto inferior) Represente el detalle de c
mo el destellar de la persecucion del casquillo de
la terminacion y la seccion de la chimenea deben
alinearse dentro de la cavidad de la chimenea del
bloque. (Véase la foto abajo a la derecha) Lleve a
la asamblea entera a la tapa de la chimenea, res-
bale cuidadosamente la manga del casquillo de la
terminacion dentro de la secci n de la chimenea
mientras que la rotaci n de izquierda a derecha las
secciones se alinea y envuelve tan junta.
2015
48
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Once you have the termination cap sleeved into the chimney section, you can apply silicone between the
final layer of block and the chase flashing to prevent any water or foreign material from entering chim-
ney cavity. Locate the pre-drilled holes in the termination cap. Then drill into both sides of the chase
flashing. Install sheet metal screws and screw in cap. Do the same on the opposite side.
**The first time you go to use your fireplace light a small fire for the first 8 hours of use so
you properly season the inner fire lining of your fire box.
Una vez que usted tiene el casquillo de la terminacion envuelto en la secci n de la chimenea, usted puede
aplicar el silicón entre la capa final de bloque y la persecucion que destella para prevenir cu-alquier agua
o material extranjero de la cavidad de la chimenea que entra. Localice los agujeros pretaladrados en cas-
quillo de la terminacion. Entonces perfore en ambos lados de destellar de la persecuci n. Instale los tornil-
los y el tornillo de metal de hoja en casquillo. Haga iguales en lado opuesto.
** La primera vez que usted va a utilizar su luz de la chimenea un pequeño fuego para las
primeras 8 horas de uso que usted sazona tan correctamente la guarnicion interna del
fuego de su caja del fuego.
2015
49
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Apply concrete adhesive as per the manufacturer’s directions. Be careful not to put on too
much adhesive so it does not migrate between the tile joints. Firmly press all tiles in position.
It will be necessary to brace up the bottom of the tile to prevent it from moving while the ad-
hesive is curing.
(Please refer to the figure below.)
Aplique el pegamento concreto según las direcciones de los fabricantes. Tenga cuidado de no
poner demasiado pegamento para no hacer que emigre entre los empalmes del azulejo. Pre-
sione firmemente todos los azulejos en la posicion. Será necesario apoyar encima de la parte
inferior del azulejo para evitar que se mueva mientras que el pegamento está curando.
(Refiera por favor a la figura abajo.)
Facing Lintel with Granite Tile:
In your fireplace kit you will
find 5 pieces of 6” x 6” granite
tile. The granite tile is to be ap-
plied to the face of the concrete
lintel (polished side facing out)
at the top of the fire box using
concrete adhesive. (Make sure
you use a retaining wall adhe-
sive that will not be affected by
the heat from the fire box.)
Dintel del Revestimiento con el
Azulejo de Granite:
En su kit de la chimenea usted encon-
trará 5 pedazos de azulejo del granito
6” x 6”. El azulejo del granito debe
ser aplicado a la cara del dintel con-
creto, (revestimiento lateral pulido
hacia fuera) en la tapa de la caja del
fuego usando el pegamento concreto.
(Segura se de que usted utilice un
pegamento del muro de contencion
que no sea afectado por el calor de la
caja del fuego.)
2015
50
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Now that all the tiles are set, leave the bracing in place for 24 hours to allow the adhesive
proper time to cure. Wait 2 days after tile installation before making a fire in your new fire-
place. The first time you go to use your fireplace light a small fire for the first 8 hours of use
so you properly season the inner fire lining of your fire box.
Ahora que se fijan todos los azulejos, deje apoyar en el lugar por 24 horas para dar un plazo
de la época apropiada adhesiva de curar. Espere 2 días después de la instalaci n del azulejo
antes que tiene un fuego en su nueva chimenea. La primera vez que usted va a utilizar su luz
de la chimenea un pequeño fuego por sus primeras 8 horas de uso tan usted sazona correcta-
mente el interno enciende la guarnicion de su caja del fuego.
2015
51
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
RIGHT
FRONT
LEFT
BACK
VIEWS

Transcripción de documentos

Cambridge Pre-Packaged Olde English Paver Outdoor Fireplace Kit Instruction Manual Manual de Instrucciones para la Chimenea de Cambridge Olde Ingles Ladrillos Pre-Empaquetado para Uso Afuera Cambridge Pre-Packaged 2015 Olde English Paver Fireplace Kit Layer Reference Guide: Guía de Referencia: 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Finished Grade 2 3/4” Above Top of Foundation Foundation Layer 2 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Cambridge Fireplace This unit is capable of burning natural gas, propane and wood. If either propane or natural gas is the preferred method of burning, seek a licensed professional plumber before construction. Also, if using propane or natural gas, a knockout is located on either side of the unit to facilitate gas piping. All piping and knockouts must be completed before installing blocks around unit as the unit will become inaccessible when construction is completed. Tools Required for Fireplace Kit Installation: Items Included in the Fireplace Kit: Safety Goggles Ear Protection Dust Mask Gloves Shovels (digging & flat) Metal Cutters for banding on cubes Mason Hammer (chipping, hammer) Road Stone Rake Tamper (Hand or Mechanical) Wheelbarrow Level (2’ and 6’ recommended) Speed Square Caulk Gun 10 oz or 28 oz (depends on what size adhesive is purchased) Rubber Mallet 14” Demo saw with diamond blade Tape Measure Marking Device (pencil, soap stone, etc) Chalk Line Hand Broom Concrete Tools (Trowel/Floats) 6 Foot ladder or scaffold according to your company’s state, and OSHA safety policy Drill & 1/16” bit 5/16” nut driver 7 ¼” Circular saw with wood blade 4” Electric grinder 4” Diamond cup grinder 1 - Stainless Steel Fireplace with instruction manual 1 - 4 Foot air-cooled chimney 1 - Black powder coated termination cap 1 - Galvanized flashing for top of completed fireplace 2 - Reinforced concrete lintels 48” x 4” x 6” 4 - Reinforced concrete lintels 32” x 4” x 6” 3 - Plastic shim pack sheet for leveling lintels or block as needed 6 - Precut 6”x 6” imported polished granite tile for facing front of fireplace lintel 3 - Cubes of Cambridge Olde English Pavers 1 - Installation manual for concrete pad and Olde English Pavers Material Required: ¾” clean stone (approx. 1 ton) Concrete (approx. 17-80 lb bags) Cambridge concrete adhesive (approx. 6-29 oz. or 17 -10.3 oz. tubes) (4 pcs) 2” x 4” x 8’ lumber 2 ½” wood screws ½” rebar (approx. 14’) Silicone for flashing * Estimated man hours for construction of the fireplace will be 5 to 8 hours based on (2, 3, or 4) man crew with moderate experience. 3 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Chimenea de Cambridge: Esta unidad es capaz de quemar el gas natural, el propano y la madera. Si el propano o el gas natural es el método preferido de quema, busque a un plomero profesional autorizado antes de construcción. También, si usa el propano o el gas natural, un golpe de gracia está situado de cualquier lado de la unidad para facilitar la instalación de tubos de gas. Toda la tubería y golpes de gracia deben ser terminados antes de instalar bloques alrededor de la unidad pues la unidad llegará a ser inaccesible cuando se termina la construcción. Herramienta requerida para la instalacion del kit: Anteojos de seguridad Protecci n auditiva Máscara de polvo Guantes Palas (& de excavaci n; Plano) Cortadores del metal (para congregar en los cubos) Martillo del mas n (que salta el & Martillo) Rastrillo de piedra Pis n (mano o mecánicos) Carretilla Nivel (2’ y 6’ recomendado) Cuadrado de la velocidad Calafatee el arma 10oz. o 28oz. (depende encendido se compra qué pegamento del tamaño) Mazo de goma 14” Sierra de versi n parcial de programa consider con la lámina del diamante Cinta métrica Dispositivo de la marca (lápiz, piedra del jab n, etc.) Línea de tiza Escoba de la mano Herramientas concretas (paletas y flotadores) Escala o andamio de 6Ft según su company’s estado, y de la política de seguridad de OSHA; Taladro y 1/16” pedacito 5/16” Aprietatuerca 7 1/4” Sierra Circular con la lámina de madera 4” Amoladora eléctrica 4” Amoladora de la taza del diamante Artículos Incluidos en el Kit de Chimenea: 1-de acero inoxidable de chimenea con manual de instrucciones 1-4 pies chimenea enfriado por aire 1-Polvo Negro tapa de terminación de cubierta 1-Galvanizado intermitente para la tapa de la chimenea completa 2-Dinteles de hormigón armado de 48”x4”x 6” 4-Dinteles de hormigón armado de 32”x4”x 6” 3-Hoja plástico de calza para nivelar dinteles o bloquear cuando sea necesario 6-6”x 6” Granito pulido importado 3-Cubos de Olde Inglés ladrillos 1-Manual de instalación para la plataforma de concreto y ladrillos Olde Inglés Material Necesario: ¾” piedra limpia (aprox. 1 tonelada) Concreto (aprox. 17 bolsas de 80 libras) Cambridge adhesivo (aprox. 6-29 oz. o 17-10.3 oz. tubos) (4 piezas) de 2”x 4” x 8’de madera 2 ½” tornillos para madera ½” barra de refuerzo (aprox. 14’) Silicona para el flasheo *Las horas de trabajo estimadas para la construccion de la chimenea seran 5 a 8 horas con (2, 3, o 4) hombres con experiencia mederada. 4 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Fireplace Concrete Pad Construction: Call 811 for information on underground utility marking. Select desired location and excavate 52” L x 65 3/4” W x 12 3/4” D area for concrete pad. Fill excavated area with approximately 6” of ¾” clean gravel, compacting every 3”. Frame remaining 4” with 2” x 4” lumber to create a level pad. (Be sure 2” x 4” wood frame is perfectly level, front to back and side to side) See attached drawing for details of steel reinforcement rod placement. Fill 2” x 4” wood frame with a 4,000 psi strong concrete mix. *Allow pad to cure for minimum of 48 hours. *Note: (Wood Box Additions) If you are going to add fire wood box extensions, either a single unit or a set, it will be necessary to construct an additional concrete pad for each unit added. Construccion concreta del cojín de la chimenea: Llamada 811 para la información sobre la marca para uso general subterráneo. Seleccione deseó la local -ización y excavan 52” L x 65 3/4” W x 12 3/4” D áreas para el cojín concreto. Instale cuatro 8” tubos concretos del diámetro a la helada-línea según código local. Llene el área excavada de aproximadamente 6” de ¾” grava limpia, compactando cada 3”. Capítulo 4” restantes con madera de construcción de 2” x 4” para crear un cojín nivel. (Sea sure el marco de madera 2” x 4” es perfectamente nivel, frente ha atrás y lado a lado) vea el dibujo atado para los detalles de la colocación de acero de la barra del refuerzo. Llene el marco de madera de los tubos concretos y de 2” x 4” de una mezcla de hormigón fuerte de 4,000 PSI. *Permita que el cojín cure para el mínimo de 48 horas. *Note: (Adiciones para la caja de lena) Si usted va a agregar las extensiones de madera de la caja del fuego, una sola unidad o un sistema será necesario construir los cojines concretos adicionales para cada unidad agregada. 5 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Fireplace Concrete Pad Detail-Cross Section Drawing /Concreta del cojín de la chimenea detail-Dibujo Seccionado Transversalmente A B C 4” 10” 6” A. 1/2” steel reinforcing rod / Barra de refuerzo de 1/2” B. 4” concrete slab / Bloque de cemento de 4” C. 6” of ¾ clean stone / 6” de ¾ grave limpia Top View-Footing Detail / Vision Superior-Detaile De Pie 52” 65 3/4” 6 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Stones Included In The Kit: 48” Lintel (1 Piece) 40” Lintel (1 Piece) 4”x4” 32” Lintel (4 Pieces) Large (157 Pieces) 4”x4” Cut Stone (1 Piece) Large to remove 3 ½” x 5 ½” (2 Pieces) 7 Large to remove 3” x 8” (2 Pieces) Cambridge Pre-Packaged Olde English Paver Fireplace Kit 5 1/2”x4 1/4” Small (2 Pieces) 8 1/4”x5 1/2” Medium (7 Pieces) 8 1/4”x8 1/4” Large (1 Piece) Large to remove 3”x4” (1 Piece) Small to remove 1”x1 1/2” (1 Piece) 1 1/2”x6 13/16”Small (1 Piece) Cut Medium to remove 1 1/2”x1 1/2” (2 Pieces) Medium (82 Pieces) Large to remove 3”x3” (1 Piece) 8 2015 Small (247 Pieces) 6 3/4”x6 3/4” Medium (1 Pieces) 8 13/16”x8 13/16” Large (2 Pieces) Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Additional Cut Stones Large notch cut 1 1/2” x 1 1/2” offset by 4” (13 Pieces) Large notch cut 1 1/2” x 1 1/2” (15 Pieces) 9 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Pad: Capa 1: Mark a line 4” in on all sides on the concrete pad to mark the outside perimeter of the fireplace. Marque una línea 4” de todo los lados del cojín de concreto a marca el perímetro exterior de la chimenea. Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 10 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 1-A: Capa 1-A: Firebox Placement: Install firebox in the center of the pad. Attach 4ft air-cooled chimney per manufactures instructions enclosed in the firebox. Colocacion de la caja de fuegos: Instale el unidad de la caja de fuegos 8 ¼” de la del frente de la capa 1 y 9” adentro en lado izquierdo y derecho. Ate la chimenea refrigerada de 4 pies por fabrica la instruccion. 11 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 1-B: Capa 1-B: Remove firebox top support with a Phillips screwdriver. Take the 8 screws out removing the firebox top face support. This will not be needed for the install. See photo for details. Quite la ayuda de tapa del lugar de la caja de fuegos con un destornillador de Philips. Tome los 8 tornillos hacia fuera que quitan la caja de fuegos ayuda de cara superior. Esto no será necesario para la instalaci n. Vea la foto para los detalles. 12 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” Layer 1: Capa 1: Piece Count = (2) Small, (3) Medium, (8) Large, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (3) Mediano, (8) Grande, (1) Grande 1 1/2“x1 1/2“, (1) Grande 1 1/2“x 1 1/2“ offset 4“ Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 13 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” Layer 2: Capa 2: Piece Count = (2) Small, (3) Medium, (8) Large, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (3) Mediano, (8) Grande, Aplique el pegamento concreto e instálelo por la foto. Apply concrete adhesive and install per photo. 14 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Layer 3: Hearth Layer Capa 3 Capa del Hogar Piece Count = (2) Small, (3) Medium, (12) Large, (1) Large notch cut 1 1/2” x 1 1/2” Numero de piezas = (2) Pequeño, (3) Mediano, (12) Grande , (1) Grande 1 1/2”x 1 1/2” Hearth will overhang 5 ¾” past layer 3 in the front of the fireplace. El hogar sobresaldrá por capa 3 del pasado de 5 ¾” en el frente de la chimenea. Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 15 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” 8 1/2” 5 1/2” Layer 4: Capa 4: Piece Count = (2) Small, (2) Medium, (6) Large, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (2) Mediano, (6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2”x 1 1/2” offset 4” (1) Medium Cut 8 ¼” x 5 ½” Corte (1) Mediano 8 ¼” x 5 ½” Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 16 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” 8 1/2” 5 1/2” Layer 5: Capa 5: Piece Count = (2) Small, (2) Medium, (6) Large, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4”, Numero de Piezas = (2) Pequeño, (2) Mediano, (6) Grande Corte, (1) Mediano 8 ¼” x 5 ½”, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2”x 1 1/2” offset 4” (1) Medium Cut 8 ¼” x 5 ½” Aplique el pegamento concreto e instálelo por la foto. Apply concrete adhesive and install per photo. 17 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” 8 1/2” 5 1/2” Layer 6: Capa 6: Piece Count = (2) Small, (2) Medium, (6) Large, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (2) Mediano, (6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2” x 1 1/2” offset 4” (1) Medium Cut 8 ¼” x 5 ½” Corte (1) Mediano 8 ¼” x 5 ½” Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 18 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” 8 1/2” 5 1/2” Layer 7: Capa 7: Piece Count = (2) Small, (2) Medium, (6) Large, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (2) Mediano, (6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2” x 1 1/2” offset 4” (1) Medium Cut 8 ¼” x 5 ½” Corte (1) Mediano 8 ¼” x 5 ½” Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 19 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” 8 1/2” 5 1/2” Layer 8: Capa 8: Piece Count = (2) Small, (2) Medium, (6) Large, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (2) Mediano, (6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2” x 1 1/2” offset 4” (1) Medium Cut 8 ¼” x 5 ½” Corte (1) Mediano 8 ¼” x 5 ½” Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 20 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” 8 1/2” 5 1/2” Layer 9: Capa 9: Piece Count = (2) Small, (2) Medium, (6) Large, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (2) Mediano, (6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2” x 1 1/2” offset 4” (1) Medium Cut 8 ¼” x 5 ½” Corte (1) Mediano 8 ¼” x 5 ½” Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 21 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” 8 1/2” 5 1/2” Layer 10: Capa 10: Piece Count = (2) Small, (2) Medium, (6) Large, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (2) Mediano, (6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2” x 1 1/2” offset 4” (1) Medium Cut 8 ¼” x 5 ½” Corte (1) Mediano 8 ¼” x 5 ½” Apply concrete adhesive and install per photo Aplique el pegamento concreto e instálelo por la foto. 22 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” 8 1/2” 5 1/2” Layer 11: Capa 11: Piece Count = (2) Small, (2) Medium, (6) Large , (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (2) Mediano, (6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2” x 1 1/2” offset 4” (1) Medium Cut 8 ¼” x 5 ½” Corte (1) Mediano 8 ¼” x 5 ½” Apply concrete adhesive and install per photo Aplique el pegamento concreto e instálelo por la foto. 23 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 9” 2015 9” 4 1/4” Layer 11-A: Lintel Placement Capa 11-A: Colocacion del Dintel Cut (1) 48” lintel down in size to 40” Install lintel 9” from left and right side & 4 ¼” from front. Corte (1) 48” dintel ha 40” Instale el dintel 9” de lado izquierdo y derecho & 4 ¼” del frente. Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 24 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” 3 1/2” 4 1/4” Small 5 1/2” 5 1/2” Layer 12: Capa 12: Piece Count = (2) Small, (2) Medium, (5) Large, (1) Small Cut 4 ¼” x 5 ½”, (1) Large cut to remove a corner piece that is 3 ½” x 5 ½”, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (2) Mediano, (5) Grande Corte (1) Pequeño 4 ¼” x 5 ½” Corte (1) Grande para quitar un pedazo de la esquina que sea 3 ½”x 5 ½”, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2”x 1 1/2” offset 4” Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 25 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” 3 1/2” 4 1/4” Small 5 1/2” 5 1/2” Layer 13: Capa 13: Piece Count = (2) Small, (2) Medium, (5) Large Numero de piezas = (2) Pequeño, (2) Mediano, (5) Grande Cut (1) Small to 4 ¼” x 5 ½”, Cut (1) Large to remove a corner piece that is 3 ½” x 5 ½”, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Corte (1) Pequeño 4 ¼” x 5 ½” Corte (1) Grande para quitar un pedazo de la esquina que sea 3 ½”x 5 ½”, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2”x 1 1/2” offset 4” Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 26 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large notch cut 1 1/2” x 1 1/2” Large notch cut 1 1/2” x 1 1/2” offset by 4” Large 8 1/4” Layer 14: Capa 14: Piece Count = (2) Small, (2) Medium, (8) Large, (1) Large cut to 8 1/4”x 8 1/4”, (1) Large notch cut 1 1/2” x 1 1/2”, (1) Large notch cut 1 1/2” x 1 1/2” offset by 4” Numero de piezas = (2) Pequeño, (2) Mediano, (8) Grande, (1) Grande 1 1/2” x 1 1/2”, (1) Grande 1 1/2”x 1 1/2” offset 4” Corte (1) Grande 8 1/4”x 8 1/4” Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 27 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Large 8 1/4” Layer 15: Capa 15: Piece Count = (2) Small, (2) Medium, (10) Large Numero de piezas = (2) Pequeño, (2) Mediano, (10) Grande, (1) Grande 8 1/4”x 8 1/4” Cut (1) Large to 8 1/4” x 8 1/4” Aplique el pegamento concreto e instálelo por la foto. Apply concrete adhesive and install per photo. 28 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 48” Lintel 4 3/4” 2015 4 3/4” 9 3/4” Layer 15-A: Lintel Placement Capa 15-A: Curso del Dintel Install (1) 48” lintel – 4 ¾” in from left and right sides and 9 ¾” in from front face. See photo details. Instale (1) 48” dintel - 4 ¾” en derechos delanteros y 9 3/4” adentro de cara delantera. Vea los detalles de la foto. Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 29 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 3 1/2”” 3 1/2” 5 1/2” 4” Large 8 1/4” Layer 16: Capa 16: Piece Count = (2) Small, (3) Medium, (8) Large Numero de piezas = (2) Pequeño, (3) Mediano, (8) Grande Corte (1) Grande pedazo para quitar un 3 ½ ” x 4” pedazo dede una esquina. Corte (1) Pedazo grande para quitar un pedazo hecho muescas en de 3 1/2” x 5 1/2”. Corte (1) Pedazo grande para quitar una esquina de 8 1/4” x 8 1/4”. Aplique el pegamento concreto e instálelo por la foto. Cut (1) Large piece to remove a 3 ½” x 4” notched piece. Cut (1) Large piece to remove a 3 ½” x 5 ½ ” corner. Cut (1) Large to 8 1/4” x 8 1/4” Apply concrete adhesive and install per photo. 30 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Cut Large to 8 1/4” Long 8 1/4” 8 1/4” Cut Large to 9 1/2” Long and cut 3 x 1 1/2” from a corner Cut Large to 9 1/2” Long and cut 3 x 1 1/2” from a corner 9 1/2” 9 1/2” 3” 3” 1 1/2” 1 1/2” 3” 3” 8” 8” Layer 17: Capa 17: Piece Count = (2) Medium, (10) Large Caution: On the front of the fireplace, overhanging stones will not be able to support themselves and will require added weight from the next layer (#18) to hold it in place. Temporary stones can be laid on top of the overhanging stones until the next layer is permanently installed. Cut (2) Large pieces to be 8 1/4” x 8 1/4”. Cut (2) Large pieces to remove a 3” x 8” piece from a corner. Cut (2) Large pieces to 9 1/2” and remove a 3 x 1 1/2” piece from a corner. Numero de Piezas = (2) Mediano, (10) Grande Precauci n: En el frente de la chimenea las piedras sobresalientes no podrán apoyarse y re-querirán agregaron el peso de la capa siguiente (#18) para llevarla a cabo en el lugar. Las piedras temporales se pueden poner encima de unidades colgantes excesivas hasta que la capa siguiente esté instalada permanentemente. Corte (2) Pedazo Grande para quitar un 8 1/4” x8 1/4” pedazo de una esquina. Corte (2) Pedazos grandes para ser 3” x 8 ”. Corte (2) Pedazos grandes para quitar un pedazo de 9 1/2” and remove 3x1 1/2” de una esquina. Instale 1 ½” proyección en lados izquierdos y derechos y 3 ¾” en frente. La parte posterior será rasante. Install 1 ½” over-hang on left and right sides and 3 ¾” in front. Back will be flush. Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 31 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 4” 2015 4” 16” 16” Layer 17-A: Lintel Placement Capa 17-A: Colocacion del Dintel Install (4) 32” lintels 16” from the left and right side 4” from the back. Instale (4) 32” dinteles 16” el lado izquierdo y del derecho 4” de la parte posterior. Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 32 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 3 1/2” 2015 3 1/2” 8 1/4” Layer 18: Capa 18: Piece Count = (12) Small, (4) Medium, (4) Large Install 3 ½” step-in on left and right side and 8 1/4” step-in on front. Back is flush. Numero de piezas = (12) Pequeño, (4) Mediano, (4) Grande Instale 3 ½” paso en lados izquierdos y derechosy 8 1/4” paso en frente. La parte posterior es rasante. Aplique el pegamento concreto e instálelo por la foto. Apply concrete adhesive and install per photo. 33 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 19: Capa 19: Piece Count = (10) Small, (11) Medium Cut (1) Small piece to create a 4” x 4” piece. Cut (1) Medium to create a 6 ¾” x 6 ¾” piece. Numero de piezas = (10) Pequeño, (11) Mediano Corte (1) Pequeño pedazo para crear un pedazo de 4” x 4”. Corte (1) Medio para crear un 6 ¾” x 6 ¾” pedazo . Install 4” step-in on left and right sides. Front and back are flush. Instale 4” paso en lados izquierdos y derechos. El frente y la parte posterior son rasantes. Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 34 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 20: Capa 20: Piece Count = (16) Medium Numero de piezas = (16) Mediano Install 4 ½” step-in on left and right sides. Front and back are flush. Instale el 4 ½” paso en lados izquierdos y derechos. El frente y la parte posterior son rasantes. Apply concrete adhesive and install per photo. Aplique el pegamento con-creto e instálelo por la foto. 35 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 21: Capa 21: Piece Count = (16) Small Install 2” step-in on left and right sides and 4” step-in on front and back. Numero de piezas = (16) Pequeña Instale 2” paso en lados izquierdos y derechos y 4” paso en frente y detrás. Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 36 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 22: Capa 22: Piece Count = (16) Small Apply concrete adhesive and install per photo. Numero de piezas = (16) Pequeña Aplique el pegamento concreto e instálelo por la foto. 37 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 23: Capa 23: Piece Count = (16) Small Apply concrete adhesive and install per photo. Numero de piezas = (16) Pequeño Aplique el pegamento concreto e instálelo por la foto. 38 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 24: Capa 24: Piece Count = (16) Small Apply concrete adhesive and install per photo. Numero de piezas = (16) Pequeño Aplique el pegamento concreto e instálelo por la foto. 39 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 25: Capa 25: Piece Count = (16) Small Apply concrete adhesive and install per photo. Numero de piezas = (16) Pequeño Aplique el pegamento concreto e instálelo por la foto. 40 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 26: Capa 26: Piece Count = (16) Small Apply concrete adhesive and install per photo. Numero de piezas = (16) Pequeño Aplique el pegamento concreto e instálelo por la foto. 41 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 27: Capa 27: Piece Count = (16) Small Apply concrete adhesive and install per photo. Numero de piezas = (16) Pequeño Aplique el pegamento concreto e instálelo por la foto. 42 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 28: Capa 28: Piece Count = (16) Small Apply concrete adhesive and install per photo. Numero de piezas = (16) Pequeño Aplique el pegamento concreto e instálelo por la foto. 43 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 29: Capa 29: Piece Count = (16) Small Apply concrete adhesive and install per photo. Numero de piezas = (16) Pequeño Aplique el pegamento concreto e instálelo por la foto. 44 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 30: Capa 31: Piece Count = (28) Small Cut (1) Small piece to 1 ½” x 6 13/16”. Numero de piezas = (28) Pequeño Corte (1) Pequeño pedazo a 1 ½” x 6 13/16”. Install a 1 1/4” overhang on left and right side 2” overhang on front and back. Instale una 1 1/4”proyeccion de lado izquierdo y derecho y una 2” proyeccion de frente y detrás. Apply concrete adhesive and install per photo. Aplique el pegamento concreto e instálelo por la foto. 45 Cambridge Pre-Packaged Olde English Paver Fireplace Kit Chase Flashing • El destellar de la persecución Chase flashing with collar facing up. Persecucion que destella con el revestimiento del collar para arriba. 46 2015 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Layer 32: Capa 32: Once the chimney has been centered, take the chase flashing with the collar up and slide it onto the termination cap sleeve until it is flush with the bottom of the termination cap. (See Photo Bottom Left) See picture detail of how the termination cap chase flashing and chimney section should line up inside the block chimney cavity. (See Photo Bottom Right) Take the entire assembly to the top of the fireplace chimney, carefully slide the termination cap sleeve into the chimney section while rotating left to right so the sections line up and sleeve together. Una vez que se ha centrado la chimenea tome la persecuci n que destella con el collar para arriba y deslícela encendido hacia la manga del casquillo de la terminacion hasta que sea rasante con la parte inferior del casquillo de la terminaci n. (Véase la foto inferior) Represente el detalle de c mo el destellar de la persecucion del casquillo de la terminacion y la seccion de la chimenea deben alinearse dentro de la cavidad de la chimenea del bloque. (Véase la foto abajo a la derecha) Lleve a la asamblea entera a la tapa de la chimenea, resbale cuidadosamente la manga del casquillo de la terminacion dentro de la secci n de la chimenea mientras que la rotaci n de izquierda a derecha las secciones se alinea y envuelve tan junta. 47 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Once you have the termination cap sleeved into the chimney section, you can apply silicone between the final layer of block and the chase flashing to prevent any water or foreign material from entering chimney cavity. Locate the pre-drilled holes in the termination cap. Then drill into both sides of the chase flashing. Install sheet metal screws and screw in cap. Do the same on the opposite side. **The first time you go to use your fireplace light a small fire for the first 8 hours of use so you properly season the inner fire lining of your fire box. Una vez que usted tiene el casquillo de la terminacion envuelto en la secci n de la chimenea, usted puede aplicar el silicón entre la capa final de bloque y la persecucion que destella para prevenir cu-alquier agua o material extranjero de la cavidad de la chimenea que entra. Localice los agujeros pretaladrados en casquillo de la terminacion. Entonces perfore en ambos lados de destellar de la persecuci n. Instale los tornillos y el tornillo de metal de hoja en casquillo. Haga iguales en lado opuesto. ** La primera vez que usted va a utilizar su luz de la chimenea un pequeño fuego para las primeras 8 horas de uso que usted sazona tan correctamente la guarnicion interna del fuego de su caja del fuego. 48 Cambridge Pre-Packaged Olde English Paver Fireplace Kit Facing Lintel with Granite Tile: 2015 Dintel del Revestimiento con el Azulejo de Granite: In your fireplace kit you will find 5 pieces of 6” x 6” granite tile. The granite tile is to be applied to the face of the concrete lintel (polished side facing out) at the top of the fire box using concrete adhesive. (Make sure you use a retaining wall adhesive that will not be affected by the heat from the fire box.) En su kit de la chimenea usted encontrará 5 pedazos de azulejo del granito 6” x 6”. El azulejo del granito debe ser aplicado a la cara del dintel concreto, (revestimiento lateral pulido hacia fuera) en la tapa de la caja del fuego usando el pegamento concreto. (Segura se de que usted utilice un pegamento del muro de contencion que no sea afectado por el calor de la caja del fuego.) Apply concrete adhesive as per the manufacturer’s directions. Be careful not to put on too much adhesive so it does not migrate between the tile joints. Firmly press all tiles in position. It will be necessary to brace up the bottom of the tile to prevent it from moving while the adhesive is curing. (Please refer to the figure below.) Aplique el pegamento concreto según las direcciones de los fabricantes. Tenga cuidado de no poner demasiado pegamento para no hacer que emigre entre los empalmes del azulejo. Presione firmemente todos los azulejos en la posicion. Será necesario apoyar encima de la parte inferior del azulejo para evitar que se mueva mientras que el pegamento está curando. (Refiera por favor a la figura abajo.) 49 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 Now that all the tiles are set, leave the bracing in place for 24 hours to allow the adhesive proper time to cure. Wait 2 days after tile installation before making a fire in your new fireplace. The first time you go to use your fireplace light a small fire for the first 8 hours of use so you properly season the inner fire lining of your fire box. Ahora que se fijan todos los azulejos, deje apoyar en el lugar por 24 horas para dar un plazo de la época apropiada adhesiva de curar. Espere 2 días después de la instalaci n del azulejo antes que tiene un fuego en su nueva chimenea. La primera vez que usted va a utilizar su luz de la chimenea un pequeño fuego por sus primeras 8 horas de uso tan usted sazona correctamente el interno enciende la guarnicion de su caja del fuego. 50 Cambridge Pre-Packaged Olde English Paver Fireplace Kit 2015 VIEWS RIGHT FRONT LEFT BACK 51
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51

CAMBRIDGE Olde English Paver Outdoor Fireplace Kit Manual de usuario

Tipo
Manual de usuario