Transcripción de documentos
Cambridge Pre-Packaged
Olde English Paver Outdoor Fireplace Kit
Instruction Manual
Manual de Instrucciones para la
Chimenea de Cambridge Olde Ingles
Ladrillos Pre-Empaquetado para Uso
Afuera
Cambridge Pre-Packaged
2015
Olde English Paver Fireplace Kit
Layer Reference Guide:
Guía de Referencia:
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Finished
Grade
2 3/4” Above Top of Foundation
Foundation Layer
2
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Cambridge Fireplace
This unit is capable of burning natural gas, propane and wood. If either propane or natural gas is the
preferred method of burning, seek a licensed professional plumber before construction. Also, if using
propane or natural gas, a knockout is located on either side of the unit to facilitate gas piping. All piping and knockouts must be completed before installing blocks around unit as the unit will become inaccessible when construction is completed.
Tools Required for Fireplace Kit Installation:
Items Included in the Fireplace Kit:
Safety Goggles
Ear Protection
Dust Mask
Gloves
Shovels (digging & flat)
Metal Cutters for banding on cubes
Mason Hammer (chipping, hammer)
Road Stone Rake
Tamper (Hand or Mechanical)
Wheelbarrow
Level (2’ and 6’ recommended)
Speed Square
Caulk Gun 10 oz or 28 oz (depends on what size
adhesive is purchased)
Rubber Mallet
14” Demo saw with diamond blade
Tape Measure
Marking Device (pencil, soap stone, etc)
Chalk Line
Hand Broom
Concrete Tools (Trowel/Floats)
6 Foot ladder or scaffold according to your company’s state, and OSHA safety policy
Drill & 1/16” bit
5/16” nut driver
7 ¼” Circular saw with wood blade
4” Electric grinder
4” Diamond cup grinder
1 - Stainless Steel Fireplace with instruction manual
1 - 4 Foot air-cooled chimney
1 - Black powder coated termination cap
1 - Galvanized flashing for top of completed fireplace
2 - Reinforced concrete lintels 48” x 4” x 6”
4 - Reinforced concrete lintels 32” x 4” x 6”
3 - Plastic shim pack sheet for leveling lintels or
block as needed
6 - Precut 6”x 6” imported polished granite tile for
facing front of fireplace lintel
3 - Cubes of Cambridge Olde English Pavers
1 - Installation manual for concrete pad and Olde
English Pavers
Material Required:
¾” clean stone (approx. 1 ton)
Concrete (approx. 17-80 lb bags)
Cambridge concrete adhesive (approx. 6-29 oz. or 17
-10.3 oz. tubes)
(4 pcs) 2” x 4” x 8’ lumber
2 ½” wood screws
½” rebar (approx. 14’)
Silicone for flashing
* Estimated man hours for construction of the fireplace will be 5 to 8 hours based on (2, 3, or 4) man
crew with moderate experience.
3
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Chimenea de Cambridge:
Esta unidad es capaz de quemar el gas natural, el propano y la madera. Si el propano o el gas natural es
el método preferido de quema, busque a un plomero profesional autorizado antes de construcción. También, si usa el propano o el gas natural, un golpe de gracia está situado de cualquier lado de la unidad
para facilitar la instalación de tubos de gas. Toda la tubería y golpes de gracia deben ser terminados
antes de instalar bloques alrededor de la unidad pues la unidad llegará a ser inaccesible cuando se termina la construcción.
Herramienta requerida para la instalacion del
kit:
Anteojos de seguridad
Protecci n auditiva
Máscara de polvo
Guantes
Palas (& de excavaci n; Plano) Cortadores del
metal (para congregar en los cubos)
Martillo del mas n (que salta el & Martillo)
Rastrillo de piedra
Pis n (mano o mecánicos)
Carretilla
Nivel (2’ y 6’ recomendado)
Cuadrado de la velocidad
Calafatee el arma 10oz. o 28oz. (depende encendido se compra qué pegamento del tamaño)
Mazo de goma
14” Sierra de versi n parcial de programa consider con la lámina del diamante
Cinta métrica
Dispositivo de la marca (lápiz, piedra del jab n,
etc.)
Línea de tiza
Escoba de la mano
Herramientas concretas (paletas y flotadores)
Escala o andamio de 6Ft según su company’s
estado, y de la política de seguridad de OSHA;
Taladro y 1/16” pedacito
5/16” Aprietatuerca
7 1/4” Sierra Circular con la lámina de madera
4” Amoladora eléctrica
4” Amoladora de la taza del diamante
Artículos Incluidos en el Kit de Chimenea:
1-de acero inoxidable de chimenea con manual de
instrucciones
1-4 pies chimenea enfriado por aire
1-Polvo Negro tapa de terminación de cubierta
1-Galvanizado intermitente para la tapa de la chimenea completa
2-Dinteles de hormigón armado de 48”x4”x 6”
4-Dinteles de hormigón armado de 32”x4”x 6”
3-Hoja plástico de calza para nivelar dinteles o bloquear cuando sea necesario
6-6”x 6” Granito pulido importado
3-Cubos de Olde Inglés ladrillos
1-Manual de instalación para la plataforma de concreto y ladrillos Olde Inglés
Material Necesario:
¾” piedra limpia (aprox. 1 tonelada)
Concreto (aprox. 17 bolsas de 80 libras)
Cambridge adhesivo (aprox. 6-29 oz. o 17-10.3 oz.
tubos)
(4 piezas) de 2”x 4” x 8’de madera
2 ½” tornillos para madera
½” barra de refuerzo (aprox. 14’)
Silicona para el flasheo
*Las horas de trabajo estimadas para la construccion de la chimenea seran 5 a 8 horas con (2, 3, o 4)
hombres con experiencia mederada.
4
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Fireplace Concrete Pad Construction:
Call 811 for information on underground utility marking. Select desired location and excavate 52” L x
65 3/4” W x 12 3/4” D area for concrete pad. Fill excavated area with approximately 6” of ¾” clean
gravel, compacting every 3”. Frame remaining 4” with 2” x 4” lumber to create a level pad. (Be sure 2”
x 4” wood frame is perfectly level, front to back and side to side) See attached drawing for details of
steel reinforcement rod placement. Fill 2” x 4” wood frame with a 4,000 psi strong concrete mix.
*Allow pad to cure for minimum of 48 hours.
*Note: (Wood Box Additions) If you are going to add fire wood box extensions, either a single unit or a
set, it will be necessary to construct an additional concrete pad for each unit added.
Construccion concreta del cojín de la chimenea:
Llamada 811 para la información sobre la marca para uso general subterráneo. Seleccione deseó la local
-ización y excavan 52” L x 65 3/4” W x 12 3/4” D áreas para el cojín concreto. Instale cuatro 8” tubos
concretos del diámetro a la helada-línea según código local. Llene el área excavada de aproximadamente 6” de ¾” grava limpia, compactando cada 3”. Capítulo 4” restantes con madera de construcción
de 2” x 4” para crear un cojín nivel. (Sea sure el marco de madera 2” x 4” es perfectamente nivel, frente
ha atrás y lado a lado) vea el dibujo atado para los detalles de la colocación de acero de la barra del refuerzo. Llene el marco de madera de los tubos concretos y de 2” x 4” de una mezcla de hormigón fuerte
de 4,000 PSI.
*Permita que el cojín cure para el mínimo de 48 horas.
*Note: (Adiciones para la caja de lena) Si usted va a agregar las extensiones de madera de la caja del
fuego, una sola unidad o un sistema será necesario construir los cojines concretos adicionales para cada
unidad agregada.
5
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Fireplace Concrete Pad Detail-Cross Section Drawing /Concreta del cojín de la
chimenea detail-Dibujo Seccionado Transversalmente
A
B
C
4”
10”
6”
A. 1/2” steel reinforcing rod / Barra de refuerzo de 1/2”
B. 4” concrete slab / Bloque de cemento de 4”
C. 6” of ¾ clean stone / 6” de ¾ grave limpia
Top View-Footing Detail / Vision Superior-Detaile De Pie
52”
65 3/4”
6
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Stones Included In The Kit:
48” Lintel (1 Piece)
40” Lintel (1 Piece)
4”x4”
32” Lintel (4 Pieces)
Large (157 Pieces)
4”x4” Cut Stone (1 Piece)
Large to remove 3 ½” x 5 ½” (2 Pieces)
7
Large to remove 3” x 8” (2 Pieces)
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
5 1/2”x4 1/4” Small (2 Pieces)
8 1/4”x5 1/2” Medium (7 Pieces)
8 1/4”x8 1/4” Large (1 Piece)
Large to remove 3”x4” (1 Piece)
Small to remove 1”x1 1/2” (1 Piece)
1 1/2”x6 13/16”Small (1 Piece)
Cut Medium to remove 1 1/2”x1 1/2” (2 Pieces)
Medium (82 Pieces)
Large to remove 3”x3” (1 Piece)
8
2015
Small (247 Pieces)
6 3/4”x6 3/4” Medium (1 Pieces)
8 13/16”x8 13/16” Large (2 Pieces)
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Additional Cut Stones
Large notch cut 1 1/2” x 1 1/2”
offset by 4”
(13 Pieces)
Large notch cut 1 1/2” x 1 1/2”
(15 Pieces)
9
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Pad:
Capa 1:
Mark a line 4” in on all sides on the concrete pad
to mark the outside perimeter of the fireplace.
Marque una línea 4” de todo los lados del cojín de
concreto a marca el perímetro exterior de la chimenea.
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
10
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 1-A:
Capa 1-A:
Firebox Placement: Install firebox in the center
of the pad. Attach 4ft air-cooled chimney per
manufactures instructions enclosed in the firebox.
Colocacion de la caja de fuegos:
Instale el unidad de la caja de fuegos 8 ¼” de la
del frente de la capa 1 y 9” adentro en lado
izquierdo y derecho. Ate la chimenea refrigerada
de 4 pies por fabrica la instruccion.
11
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 1-B:
Capa 1-B:
Remove firebox top support with a Phillips
screwdriver. Take the 8 screws out removing the
firebox top face support. This will not be needed
for the install. See photo for details.
Quite la ayuda de tapa del lugar de la caja de fuegos con un destornillador de Philips. Tome los 8
tornillos hacia fuera que quitan la caja de fuegos
ayuda de cara superior. Esto no será necesario
para la instalaci n. Vea la foto para los detalles.
12
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch
cut 1 1/2” x
1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Layer 1:
Capa 1:
Piece Count = (2) Small, (3) Medium, (8) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (3) Mediano,
(8) Grande, (1) Grande 1 1/2“x1 1/2“,
(1) Grande 1 1/2“x 1 1/2“ offset 4“
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
13
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch
cut 1 1/2” x
1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Layer 2:
Capa 2:
Piece Count = (2) Small, (3) Medium, (8) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (3) Mediano,
(8) Grande,
Aplique el pegamento concreto e instálelo por la
foto.
Apply concrete adhesive and install per photo.
14
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Layer 3: Hearth Layer
Capa 3 Capa del Hogar
Piece Count = (2) Small, (3) Medium, (12) Large,
(1) Large notch cut 1 1/2” x 1 1/2”
Numero de piezas = (2) Pequeño, (3) Mediano, (12)
Grande , (1) Grande 1 1/2”x 1 1/2”
Hearth will overhang 5 ¾” past layer 3 in the
front of the fireplace.
El hogar sobresaldrá por capa 3 del pasado de 5
¾” en el frente de la chimenea.
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
15
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
8 1/2”
5 1/2”
Layer 4:
Capa 4:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (2) Mediano, (6)
Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1
1/2”x 1 1/2” offset 4”
(1) Medium Cut 8 ¼” x 5 ½”
Corte (1) Mediano 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
16
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
8 1/2”
5 1/2”
Layer 5:
Capa 5:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”,
Numero de Piezas = (2) Pequeño, (2) Mediano,
(6) Grande Corte, (1) Mediano 8 ¼” x 5 ½”, (1)
Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2”x 1 1/2”
offset 4”
(1) Medium Cut 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
Apply concrete adhesive and install per photo.
17
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
8 1/2”
5 1/2”
Layer 6:
Capa 6:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
(1) Medium Cut 8 ¼” x 5 ½”
Corte (1) Mediano 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
18
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
8 1/2”
5 1/2”
Layer 7:
Capa 7:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
(1) Medium Cut 8 ¼” x 5 ½”
Corte (1) Mediano 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
19
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
8 1/2”
5 1/2”
Layer 8:
Capa 8:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
(1) Medium Cut 8 ¼” x 5 ½”
Corte (1) Mediano 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
20
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
8 1/2”
5 1/2”
Layer 9:
Capa 9:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
(1) Medium Cut 8 ¼” x 5 ½”
Corte (1) Mediano 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
21
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
8 1/2”
5 1/2”
Layer 10:
Capa 10:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
(1) Medium Cut 8 ¼” x 5 ½”
Corte (1) Mediano 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo
Aplique el pegamento concreto e instálelo por la
foto.
22
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
8 1/2”
5 1/2”
Layer 11:
Capa 11:
Piece Count = (2) Small, (2) Medium, (6) Large ,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
(1) Medium Cut 8 ¼” x 5 ½”
Corte (1) Mediano 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo
Aplique el pegamento concreto e instálelo por la
foto.
23
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
9”
2015
9”
4 1/4”
Layer 11-A: Lintel Placement
Capa 11-A: Colocacion del Dintel
Cut (1) 48” lintel down in size to 40”
Install lintel 9” from left and right side &
4 ¼” from front.
Corte (1) 48” dintel ha 40”
Instale el dintel 9” de lado izquierdo y derecho &
4 ¼” del frente.
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
24
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
3 1/2”
4 1/4”
Small
5 1/2”
5 1/2”
Layer 12:
Capa 12:
Piece Count = (2) Small, (2) Medium, (5) Large,
(1) Small Cut 4 ¼” x 5 ½”,
(1) Large cut to remove a corner piece that is 3
½” x 5 ½”,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (2) Mediano, (5)
Grande
Corte (1) Pequeño 4 ¼” x 5 ½”
Corte (1) Grande para quitar un pedazo de la esquina que sea 3 ½”x 5 ½”, (1) Grande 1 1/2”x 1
1/2”, (1) Grande 1 1/2”x 1 1/2” offset 4”
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
25
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
3 1/2”
4 1/4”
Small
5 1/2”
5 1/2”
Layer 13:
Capa 13:
Piece Count = (2) Small, (2) Medium, (5) Large
Numero de piezas = (2) Pequeño, (2) Mediano, (5)
Grande
Cut (1) Small to 4 ¼” x 5 ½”,
Cut (1) Large to remove a corner piece that is 3
½” x 5 ½”,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Corte (1) Pequeño 4 ¼” x 5 ½”
Corte (1) Grande para quitar un pedazo de la esquina que sea 3 ½”x 5 ½”, (1) Grande 1 1/2”x 1
1/2”, (1) Grande 1 1/2”x 1 1/2” offset 4”
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
26
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large notch cut
1 1/2” x 1 1/2”
Large notch cut
1 1/2” x 1 1/2”
offset by 4”
Large
8 1/4”
Layer 14:
Capa 14:
Piece Count = (2) Small, (2) Medium, (8) Large,
(1) Large cut to 8 1/4”x 8 1/4”,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Numero de piezas = (2) Pequeño, (2) Mediano, (8)
Grande, (1) Grande 1 1/2” x 1 1/2”, (1) Grande 1
1/2”x 1 1/2” offset 4”
Corte (1) Grande 8 1/4”x 8 1/4”
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
27
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Large
8 1/4”
Layer 15:
Capa 15:
Piece Count = (2) Small, (2) Medium, (10) Large
Numero de piezas = (2) Pequeño, (2) Mediano, (10)
Grande, (1) Grande 8 1/4”x 8 1/4”
Cut (1) Large to 8 1/4” x 8 1/4”
Aplique el pegamento concreto e instálelo por la
foto.
Apply concrete adhesive and install per photo.
28
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
48” Lintel
4 3/4”
2015
4 3/4”
9 3/4”
Layer 15-A: Lintel Placement
Capa 15-A: Curso del Dintel
Install (1) 48” lintel – 4 ¾” in from left and right
sides and 9 ¾” in from front face. See photo details.
Instale (1) 48” dintel - 4 ¾” en derechos delanteros
y 9 3/4” adentro de cara delantera.
Vea los detalles de la foto.
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
29
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
3 1/2””
3 1/2”
5 1/2”
4”
Large
8 1/4”
Layer 16:
Capa 16:
Piece Count = (2) Small, (3) Medium, (8) Large
Numero de piezas = (2) Pequeño, (3) Mediano,
(8) Grande
Corte (1) Grande pedazo para quitar un 3 ½ ” x
4” pedazo dede una esquina.
Corte (1) Pedazo grande para quitar un pedazo
hecho muescas en de 3 1/2” x 5 1/2”.
Corte (1) Pedazo grande para quitar una esquina
de 8 1/4” x 8 1/4”.
Aplique el pegamento concreto e instálelo por la
foto.
Cut (1) Large piece to remove a 3 ½” x 4”
notched piece.
Cut (1) Large piece to remove a 3 ½” x 5 ½ ”
corner.
Cut (1) Large to 8 1/4” x 8 1/4”
Apply concrete adhesive and install per photo.
30
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Cut Large to 8 1/4” Long
8 1/4”
8 1/4”
Cut Large to 9 1/2”
Long and cut 3 x 1 1/2”
from a corner
Cut Large to 9 1/2”
Long and cut 3 x 1 1/2”
from a corner
9 1/2”
9 1/2”
3”
3”
1 1/2”
1 1/2”
3”
3”
8”
8”
Layer 17:
Capa 17:
Piece Count = (2) Medium, (10) Large
Caution: On the front of the fireplace, overhanging stones will not be able to support themselves and will require added weight from the
next layer (#18) to hold it in place. Temporary
stones can be laid on top of the overhanging
stones until the next layer is permanently installed.
Cut (2) Large pieces to be 8 1/4” x 8 1/4”.
Cut (2) Large pieces to remove a 3” x 8” piece
from a corner.
Cut (2) Large pieces to 9 1/2” and remove a 3 x 1
1/2” piece from a corner.
Numero de Piezas = (2) Mediano, (10) Grande
Precauci n: En el frente de la chimenea las piedras
sobresalientes no podrán apoyarse y re-querirán
agregaron el peso de la capa siguiente (#18) para
llevarla a cabo en el lugar. Las piedras temporales
se pueden poner encima de unidades colgantes excesivas hasta que la capa siguiente esté instalada
permanentemente.
Corte (2) Pedazo Grande para quitar un 8 1/4” x8
1/4” pedazo de una esquina.
Corte (2) Pedazos grandes para ser 3” x 8 ”.
Corte (2) Pedazos grandes para quitar un pedazo
de 9 1/2” and remove 3x1 1/2” de una esquina.
Instale 1 ½” proyección en lados izquierdos y
derechos y 3 ¾” en frente. La parte posterior será
rasante.
Install 1 ½” over-hang on left and right sides and
3 ¾” in front. Back will be flush.
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
31
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
4”
2015
4”
16”
16”
Layer 17-A: Lintel Placement
Capa 17-A: Colocacion del Dintel
Install (4) 32” lintels 16” from the left and
right side 4” from the back.
Instale (4) 32” dinteles 16” el lado izquierdo y
del derecho 4” de la parte posterior.
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
32
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
3 1/2”
2015
3 1/2”
8 1/4”
Layer 18:
Capa 18:
Piece Count = (12) Small, (4) Medium, (4) Large
Install 3 ½” step-in on left and right side and 8
1/4” step-in on front. Back is flush.
Numero de piezas = (12) Pequeño, (4) Mediano, (4)
Grande
Instale 3 ½” paso en lados izquierdos y derechosy
8 1/4” paso en frente. La parte posterior es
rasante.
Aplique el pegamento concreto e instálelo por la
foto.
Apply concrete adhesive and install per photo.
33
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 19:
Capa 19:
Piece Count = (10) Small, (11) Medium
Cut (1) Small piece to create a 4” x 4” piece.
Cut (1) Medium to create a 6 ¾” x 6 ¾” piece.
Numero de piezas = (10) Pequeño, (11) Mediano
Corte (1) Pequeño pedazo para crear un pedazo
de 4” x 4”.
Corte (1) Medio para crear un 6 ¾” x 6 ¾”
pedazo .
Install 4” step-in on left and right sides. Front
and back are flush.
Instale 4” paso en lados izquierdos y derechos. El
frente y la parte posterior son rasantes.
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
34
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 20:
Capa 20:
Piece Count = (16) Medium
Numero de piezas = (16) Mediano
Install 4 ½” step-in on left and right sides.
Front and back are flush.
Instale el 4 ½” paso en lados izquierdos y derechos. El frente y la parte posterior son rasantes.
Apply concrete adhesive and install per photo.
Aplique el pegamento con-creto e instálelo por la
foto.
35
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 21:
Capa 21:
Piece Count = (16) Small
Install 2” step-in on left and right sides and 4”
step-in on front and back.
Numero de piezas = (16) Pequeña
Instale 2” paso en lados izquierdos y derechos y 4”
paso en frente y detrás.
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
36
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 22:
Capa 22:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Numero de piezas = (16) Pequeña
Aplique el pegamento concreto e instálelo por la
foto.
37
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 23:
Capa 23:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
38
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 24:
Capa 24:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
39
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 25:
Capa 25:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
40
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 26:
Capa 26:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
41
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 27:
Capa 27:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
42
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 28:
Capa 28:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
43
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 29:
Capa 29:
Piece Count = (16) Small
Apply concrete adhesive and install per photo.
Numero de piezas = (16) Pequeño
Aplique el pegamento concreto e instálelo por la
foto.
44
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 30:
Capa 31:
Piece Count = (28) Small
Cut (1) Small piece to 1 ½” x 6 13/16”.
Numero de piezas = (28) Pequeño
Corte (1) Pequeño pedazo a 1 ½” x 6 13/16”.
Install a 1 1/4” overhang on left and right side
2” overhang on front and back.
Instale una 1 1/4”proyeccion de lado izquierdo y
derecho y una 2” proyeccion de frente y detrás.
Apply concrete adhesive and install per photo.
Aplique el pegamento concreto e instálelo por la
foto.
45
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Chase Flashing • El destellar de la persecución
Chase flashing with collar facing up.
Persecucion que destella con el revestimiento del collar para arriba.
46
2015
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Layer 32:
Capa 32:
Once the chimney has been centered, take the
chase flashing with the collar up and slide it
onto the termination cap sleeve until it is flush
with the bottom of the termination cap. (See
Photo Bottom Left) See picture detail of how
the termination cap chase flashing and chimney section should line up inside the block
chimney cavity. (See Photo Bottom Right)
Take the entire assembly to the top of the fireplace chimney, carefully slide the termination
cap sleeve into the chimney section while rotating left to right so the sections line up and
sleeve together.
Una vez que se ha centrado la chimenea tome la
persecuci n que destella con el collar para arriba
y deslícela encendido hacia la manga del casquillo
de la terminacion hasta que sea rasante con la
parte inferior del casquillo de la terminaci n.
(Véase la foto inferior) Represente el detalle de c
mo el destellar de la persecucion del casquillo de
la terminacion y la seccion de la chimenea deben
alinearse dentro de la cavidad de la chimenea del
bloque. (Véase la foto abajo a la derecha) Lleve a
la asamblea entera a la tapa de la chimenea, resbale cuidadosamente la manga del casquillo de la
terminacion dentro de la secci n de la chimenea
mientras que la rotaci n de izquierda a derecha las
secciones se alinea y envuelve tan junta.
47
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Once you have the termination cap sleeved into the chimney section, you can apply silicone between the
final layer of block and the chase flashing to prevent any water or foreign material from entering chimney cavity. Locate the pre-drilled holes in the termination cap. Then drill into both sides of the chase
flashing. Install sheet metal screws and screw in cap. Do the same on the opposite side.
**The first time you go to use your fireplace light a small fire for the first 8 hours of use so
you properly season the inner fire lining of your fire box.
Una vez que usted tiene el casquillo de la terminacion envuelto en la secci n de la chimenea, usted puede
aplicar el silicón entre la capa final de bloque y la persecucion que destella para prevenir cu-alquier agua
o material extranjero de la cavidad de la chimenea que entra. Localice los agujeros pretaladrados en casquillo de la terminacion. Entonces perfore en ambos lados de destellar de la persecuci n. Instale los tornillos y el tornillo de metal de hoja en casquillo. Haga iguales en lado opuesto.
** La primera vez que usted va a utilizar su luz de la chimenea un pequeño fuego para las
primeras 8 horas de uso que usted sazona tan correctamente la guarnicion interna del
fuego de su caja del fuego.
48
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Facing Lintel with Granite Tile:
2015
Dintel del Revestimiento con el
Azulejo de Granite:
In your fireplace kit you will
find 5 pieces of 6” x 6” granite
tile. The granite tile is to be applied to the face of the concrete
lintel (polished side facing out)
at the top of the fire box using
concrete adhesive. (Make sure
you use a retaining wall adhesive that will not be affected by
the heat from the fire box.)
En su kit de la chimenea usted encontrará 5 pedazos de azulejo del granito
6” x 6”. El azulejo del granito debe
ser aplicado a la cara del dintel concreto, (revestimiento lateral pulido
hacia fuera) en la tapa de la caja del
fuego usando el pegamento concreto.
(Segura se de que usted utilice un
pegamento del muro de contencion
que no sea afectado por el calor de la
caja del fuego.)
Apply concrete adhesive as per the manufacturer’s directions. Be careful not to put on too
much adhesive so it does not migrate between the tile joints. Firmly press all tiles in position.
It will be necessary to brace up the bottom of the tile to prevent it from moving while the adhesive is curing.
(Please refer to the figure below.)
Aplique el pegamento concreto según las direcciones de los fabricantes. Tenga cuidado de no
poner demasiado pegamento para no hacer que emigre entre los empalmes del azulejo. Presione firmemente todos los azulejos en la posicion. Será necesario apoyar encima de la parte
inferior del azulejo para evitar que se mueva mientras que el pegamento está curando.
(Refiera por favor a la figura abajo.)
49
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
Now that all the tiles are set, leave the bracing in place for 24 hours to allow the adhesive
proper time to cure. Wait 2 days after tile installation before making a fire in your new fireplace. The first time you go to use your fireplace light a small fire for the first 8 hours of use
so you properly season the inner fire lining of your fire box.
Ahora que se fijan todos los azulejos, deje apoyar en el lugar por 24 horas para dar un plazo
de la época apropiada adhesiva de curar. Espere 2 días después de la instalaci n del azulejo
antes que tiene un fuego en su nueva chimenea. La primera vez que usted va a utilizar su luz
de la chimenea un pequeño fuego por sus primeras 8 horas de uso tan usted sazona correctamente el interno enciende la guarnicion de su caja del fuego.
50
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
2015
VIEWS
RIGHT
FRONT
LEFT
BACK
51