CAMBRIDGE Fully Assembled Outdoor Fireplace Manual de usuario

Tipo
Manual de usuario
Cambridge Fully Assembled
Outdoor Fireplace
Instruction Manual
Cambridge Montado Completamente
Manual de Instrucciones Chimenea al
Aire Libre
1
Cambridge FullyAssembled
Outdoor Fireplace
Layer Reference Guide: Guía de Referencia:
Finished
Grade
Foundation Layer
2 3/8” Above Top of Foundation
Fireplace Dimensions:
59 7/8” Long
55 7/8” Deep
101 1/2” High
Fireplace Weights:
7507 lbs. Each
Chimenea de dimensiones:
59 7/8” Largo
55 7/8” Profundo
101 1/2 Alto
Pesos Chimenea:
7507 lbs. Cada
2
Cambridge FullyAssembled
Outdoor Fireplace
Layer Reference Guide: Guía de Referencia:
Optional Woodbox
Woodboxes Opcionales
Woodbox Dimensions:
34” Long
36” Deep
38 1/2” High
Woodbox Weights:
1950 lbs. Each
Leñera Dimensiones:
34” Largo
36” Profundo
38 1/2 Alto
Leñera Pesos :
1950 lbs. Cada
3
Cambridge FullyAssembled
Outdoor Fireplace
Tools Required for Fireplace Kit Installation:
Skid steer loader or other type of machinery with
forks capable of lifting 4000 lbs.
Safety Goggles
Ear Protection
Dust Mask
Gloves
Shovels (digging & flat)
Metal Cutters for banding on cubes
Mason Hammer (chipping, hammer)
Road Stone Rake
Tamper (Hand or Mechanical)
Wheelbarrow
Level (2’ and 6’ recommended)
Speed Square
Caulk Gun 10 oz or 28 oz (depends on what size
adhesive is purchased)
Rubber Mallet
14” Demo saw with diamond blade
Tape Measure
Marking Device (pencil, soap stone, etc)
Chalk Line
Hand Broom
Concrete Tools (Trowel/Floats)
6 Foot ladder or scaffold according to your company’s
state, and OSHA safety policy
Drill & 1/16” bit
5/16” nut driver
7 ¼” Circular saw with wood blade
4” Electric grinder
4” Diamond cup grinder
Items Included in the Fireplace Kit:
1 - Fireplace unit top
1 - Fireplace unit bottom
1 - Fireplace Hearth
6 - Forklift protectors
8 - Filler Block
1 - Installation manual
Material Required:
¾” clean stone (approx. 1 ton)
Concrete (approx. 32-80 lb bags)
Cambridge concrete adhesive
approx. 6 (29 oz.) or 17 (10.3 oz.) tubes
(4 pcs) 2” x 4” x 8’ lumber
2 ½” wood screws
½” rebar (approx. 15’)
4
Cambridge FullyAssembled
Outdoor Fireplace
Herramienta Requerida Para la Instalacion del Kit:
Minicargador o de otro tipo de maquinaria con
horquillas capaces de levantar 4000 libras.
Gafas de seguridad
Protecci n auditiva
Máscara de polvo
Guantes
Palas (excavaci n y plano)
Cortadores de Metal de bandas en los cubos
Mason Hammer (astillado, martillo)
Camino del rastrillo de Piedra
Sabotaje (manual o mecánica)
Carretilla
Nivel (2’ y 6’ recomendado)
Velocidad de la Plaza
Pistola para calafatear 10 oz o 28 oz (depende de
qué tamaño es comprar pegamento)
Martillo de goma
14 “Demo sierra con disco de diamante
Cinta métrica
Dispositivo de marcado (lápiz, piedra jabon, etc)
Línea de tiza
Escoba de mano
Herramientas concretas (paleta / flotadores)
6 pies escalera o andamio de acuerdo al estado de su
empresa, y la política de seguridad de OSHA
Taladro y 1/16” bits
5 /16” Tuerca conductor
7 ¼” Sierra circular con hoja de madera
4” Amoladora eléctrica
4” Amoladora de la taza del diamante
Artículos Incluidos en el Kit de la Chimenea:
1 - Chimenea superior de la unidad
1 - Chimenea inferior de la unidad
1 - Chimenea hogar
6 - protectores de montacargas
8 - de relleno bloque
1 - Manual de instalacion
Material Requerido:
¾” Piedra limpia (aprox 1 tonelada)
Hormigon (aprox. 32-bolsas de 80 libras)
Cambridge concretas adhesive aprox. 6 (29oz) o
17 (10.3 oz). Tubos
(4 piezas) de 2”x 4” x 8”de madera
2 ½” tornillos para madera
5
Cambridge FullyAssembled
Outdoor Fireplace
Fireplace Concrete Pad Construction:
Call 811 for information on underground utility marking. Select desired location and excavate
64” L x 58” W x 12” D area for concrete pad. Fill excavated area with approximately 6” of ¾”
clean gravel, compacting every 3”. Frame remaining 4” with 2”x4” lumber to create a level pad
(be sure 2”x4” wood frame is perfectly level, front to back and side to side). See attached
drawing for details of steel reinforcement rod placement. Fill concrete tubes and 2”x4” wood
frame with a 4,000 psi strong concrete mix.
* Allow concrete pad to cure for 48 hours.
Construccion Concreta del Cojín de la Chimenea:
Llame al 811 para obtener informaci n sobre la utilidad de metro marcado. Seleccione la ubicaci
n deseada y excavar 88” de largo x 60” W x 12” D área de plataforma de concreto. Instale cuatro
8” de diámetro de los tubos de hormig n a las heladas-line como por el c digo local. Llene la zona
excavada con aproximadamente 6” de ¾” limpia grava, compactando cada 3”. (No llene los
tubos de concreto con grava). Marco restantes 4” con 2” x4”de madera para crear una plata-
forma de nivel. (Asegúrese de 2” x 4” marco de madera está perfectamente horizontal, de ade-
lante hacia atrás y de lado a lado) Véanse los detalles del dibujo para la colocaci n de varillas de
acero de refuerzo. Relleno de concreto y tubos de 2” x4” marco de madera con una mezcla de
concreto 4000 PSI fuerte.
* Deje que la almohadilla para curar por un mínimo de 48 horas.
6
Cambridge FullyAssembled
Outdoor Fireplace
Fireplace Concrete Pad Detail-Drawing
A - ½” steel reinforcing rod / Barra de refuerzo de acero
B - 8” concrete slab / Bloque de cemento de 8”
C - 2” x 8” Forms / 2” x 8” Formas
D - Grade: 2 3/8 below finished paver height / Grado: 2 3/8 "altura por debajo del pavimento aca-
bado
E - Place rebar 4” from the bottom of slab / Coloque las barras de refuerzo de 4 "de la parte inferior
de la losa
Top View-Footing Detail / Vision Superior-Detaile De Pie:
7
Cambridge FullyAssembled
Outdoor Fireplace
Pre-Made Fireplace With Wood Boxes Concrete Pad Detail-Cross Section Drawing:
Concreta del Cojín de la Chimenea Detail-Dibujo Seccionado Transversalmente:
A - ½” steel reinforcing rod / Barra de refuerzo de acero
B - 8” concrete slab / Bloque de cemento de 8”
C - 2” x 8” Forms / 2” x 8” Formas
D - Grade: 2 3/8 below finished paver height / Grado: 2 3/8 "altura por debajo del pavimento aca-
bado
E - Place Rebar 4” from the bottom of slab / Coloque las barras de refuerzo de 4 "de la parte inferior
de la losa
Top View-Footing Detail / Vision Superior-Detaile De Pie:
8
Cambridge FullyAssembled
Outdoor Fireplace
Included In The Kit:
(OPTIONAL)
Woodbox
Right
Fireplace Top
Fireplace Bottom
(OPTIONAL)
Woodbox
Left
Fireplace Hearth Filler Block
Fork protectors are for installation purposes only. They will
need to be removed before the filler blocks are installed.
Protectores de horquilla son instalación sólo se propone y tendrá que eliminar-
se antes de que se instalan los bloques de relleno.
Fork Protectors
Fork Protectors Fork Protectors
9
Cambridge FullyAssembled
Outdoor Fireplace
FILLER BLOCKS
4”
8”
4”
There are (8) filler blocks included in this kit. They are used on the top front and back, the bottom back of the
unit, and the hearth. Do not put the filler blocks in the fork pocket on the bottom unit
front. The hearth will cover the bottom unit fork pockets so there is no need to
place the filler blocks.
The woodboxes are optional .
10
Cambridge FullyAssembled
Outdoor Fireplace
Step 1:
Carefully lift the Fireplace bottom with a capable
machine and place centered on the cured concrete
base pad. Always work the machine from the back
of the unit when possible, to eliminate any chance
of damage.
Fully Assembled Outdoor Fireplace : Step 1
Paso 1:
Cuidadosamente levantar la parte inferior de la chi-
menea con una máquina y centra lo en el base con-
creto curado. Siempre trabajar la máquina desde la
parte posterior de la unidad cuando sea posible.
11
Cambridge FullyAssembled
Outdoor Fireplace
Step 2:
Offset Mark:
Line up front to back with front line marked on the
bottom unit.
Then center the top fireplace unit with the bottom
section left to right
Fully Assembled Outdoor Fireplace : Step 2
Offset mark: The unit is
shipped pre-marked, for
placement front to back.
Offset Markt: La unidad es
enviado y marcado para co-
locación de frente hay
atrás .
Paso 2:
Marca de desvío:
A línea de frente hasta atrás con la línea del frente mar-
cada en la unidad inferior.
Luego centra la unidad de la chimenea superior con la
sección inferior de izquierda a derecha
12
Cambridge FullyAssembled
Outdoor Fireplace
Step 3:
Lift and carefully place the Fireplace top on the
bottom unit according to the marks from the
previous step. Before adding the filler blocks to
the top unit, be sure to remove the wooden fork
protector.
Fully Assembled Outdoor Fireplace : Step 3
Fork protectors Fork protectors
Should you want to move
the unit in the future DO
NOT GLUE the filler
blocks in place.
Paso 3:
Levantar y colocar cuidadosamente la parte superior de
chimenea con la unidad de fondo acuerdo con las mar-
cas del paso anterior. Antes de agregar el bloque de
relleno, asegúrese de quitar el protector de la horquilla
de madera.
13
Cambridge FullyAssembled
Outdoor Fireplace
Step 4:
Do not put the filler blocks in place. The hearth
will cover the opening on the bottom of the fire-
place unit.
Fully Assembled Outdoor Fireplace : Step 4
Paso 4:
El siguiente paso es aplique adhesivo concreta e insta-
lar los bloques de relleno en los bolsillos de la horqui-
lla, antes de instalar la chimenea.
Si desea mover la unidad en el futuro no use pega-
mento.
14
Cambridge FullyAssembled
Outdoor Fireplace
Step 5 Optional:
Carefully move the optional woodboxes next to
the fireplace bottom unit.
The front woodbox bullnose edge should be lined
up flush with the front of the fireplace unit as
shown in the detail.
Fully Assembled Outdoor Fireplace : Step 5 Optional
Paso 5 opcional:
Cuidadosamente pon los cajas para la lena que
son opcionales junto a la unidad de fondo de la
chimenea.
The wood box bullnose should be
flush with the front of the fireplace.
15
Cambridge FullyAssembled
Outdoor Fireplace
Step 6:
Carefully bring the fireplace hearth about 6”-8”
away from the fireplace bottom. With the use of
two people move the hearth in to position by
hand. This is done to eliminate any damage that
might occur to the bullnose.
Fully Assembled Outdoor Fireplace : Step 6
Paso 6:
Cuidadosamente traer el hogar de la chimenea alre-
dedor de 6 "-8" lejos de la parte inferior de la chi-
menea. Con el uso de dos personas mueve el hogar
y posicionar a mano. Esto se hace para eliminar los
daños que podrían producirse a los ladrillos bullno-
se.
16
Cambridge FullyAssembled
Outdoor Fireplace
Fully Assembled Outdoor Fireplace : Step 7
Step 7:
Remove the two screws on top of the chimney
termination cap to drop the flue.
Remove these 2 screws to drop the flue.
Paso 7:
Retire los dos tornillos en la parte superior de la
tapa de terminación de la chimenea para dejar
caer la chimenea.
17
Cambridge FullyAssembled
Outdoor Fireplace
Step 8:
The last step is to apply concrete adhesive, and
install the filler blocks in the fork pockets.
Should you want to move the unit in
the future DO NOT GLUE the filler
blocks in place.
Be sure to remove the wooden fork protectors be-
fore installing the filler blocks.
Fully Assembled Outdoor Fireplace : Step 8
Filler Block
Filler Block
Filler Block
Paso 8:
El último paso es aplique adhesivo concreta e instalar
los bloques de relleno en los bolsillos de la horquilla.
Si desea mover la unidad en el futuro no use pega-
mento.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18

CAMBRIDGE Fully Assembled Outdoor Fireplace Manual de usuario

Tipo
Manual de usuario