Latex-ite 31766 Guía de instalación

Tipo
Guía de instalación
TOOLS NEEDED:
9” Roller frame & extension pole
1/2” Nap roller cover
(3/4” if driveway is rough/porous)
Paint stirrer
OTHER PREPARATION PRODUCTS:
latex·ite
®
Cleaner Degreaser
latex·ite
®
Oil Spot Primer
(if you have gas/oil spots)
latex·ite
®
Crack Fillers
and/or
Patch products
Gloves
Designed primarily for previously sealed
blacktop driveways. Coverage will be
lower with unsealed pavement. (Wait at
least 6 months before sealing new
blacktop).
750 – 900 square feet per pail.
1 hour
4 hrs (if shaded areas allow an
additional 4 hrs)
If necessary, patch & repair all
cracks/troubled areas day before
application. Clean driveway & prime
any gas/oil spots prior to application.
½” nap roller cover & extension pole
Easy stir formula – use a paint stirrer to
reach even consistency
1 Coat (2 if driveway is in poor condition)
No rain in forecast for 48 hours.
Temperature between 55ºF-90ºF
Soap & water
10 YEAR
UV Rays, gasoline, oil, de-icing salts &
other car chemicals. Ultra violet rays
Low VOC, pail is recyclable
Other Tips:
Not for use on concrete surfaces.
On an extremely hot day mist off surface prior to applying
make sure there is no standing water.
For rough/porous driveways you may need a second coat.
Using a ¾” nap roller will help application. Apply second
coat after first coat is dry to to the touch (1 hour should be
fine unless you have shaded areas – give extra time).
Coverage will vary on application technique, tool used and
porosity of pavement.
Do not dilute this product or add ingredients to it
(such as sand).
Contents: CAS#
Water 7732-18-5
Vinyl Acrylic Proprietary
Calcium Carbonate 1317-65-3
Black pigment 1333-86-4
VOC <25 g/L
KEEP FROM
FREEZING
FOR USE ON:
COVERAGE:
FOOT TRAFFIC
READY:
VEHICLE
TRAFFIC READY:
PREPARATION:
APPLICATION:
TOOLS:
STIR:
NUMBER OF
COATS:
WEATHER:
CLEAN UP:
WARRANTY:
RESISTS:
ENVIRONMENT:
PROJECT REFERENCE GUIDE:
1. Limpiar…Barrer y limpiar toda la
entrada. Eliminar manchas de aceite y
combustible – enjuagar los restos con
agua.
2. Sellar…Evitar que las manchas de
aceite penetren aplicando un sellador
fuerte. Va con blanco… se seca
transparente. El sellador para manchas
de aceite se vende en www.latexite.com
3. Rellenar…Recortar el pico y verter el
relleno en la grieta justo por debajo del
borde asfáltico. No rellenar demasiado.
Permanece maleable.
4. Reparar…Reparar las grietas grandes
y lugares hundidos aplicando en capas
(de 1/4” - 1/2” de espesor) del parche.
Una vez curado, se podrá aplicar otro
nivel… emparejar bordes.
5. Emparchar…Aplicar el parche en
surcos, baches y recortes… rellenar por
sobre la superficie asfáltica… luego
apisonar. Esperar 2 semanas antes de
sellar.
6. Mezlar…Determinar la cantidad de
baldes (ver cobertura), mezclar bien todos
los baldes para lograr consistencia.
7. Aplique…latex·ite
®
ACRYLIC
GRADE
después de que se hayan
realizado todas reparaciones
adecuadamente y el asfaltado esté limpio
y seco. Recortar todo el césped suelto a
lo largo del borde. Comience su proyecto
en el extremo alto de la calzada de
acceso.
Agite... moje... haga rodar... Agite el
sellador con el agitador de pintura hasta
que tenga una consistencia uniforme.
Moje la cabeza de rodillo de pelo de 1/2
pulgada en el cubo y aplique el sellador en
secciones cuadradas de 4’ x 4’
asegurándose de hacer rodar de manera
cruzada con pinceladas perpendiculares
para obtener una cobertura completa.
Deje pasar una hora antes de caminar y 4
horas antes de pasar con un automóvil. Si
hay áreas semicubiertas, deje pasar 8
horas antes de pasar con un vehículo.
Otros consejos:
No utilizar en superficies de hormigón
En un día extremadamente caluroso, eliminar la niebla de la superficie antes de la aplicación;
asegurarse de que no haya agua depositada
Para las calzadas de acceso que tengan baches o sean porosas, es posible que se necesite una
segunda capa. Utilizar un rodillo de pelo de 3/4 pulgadas ayudará a la aplicación. Aplicar la segunda
capa después de que la primera capa esté seca al tacto (1 hora sería suficiente, a menos que tenga
áreas semicubiertas en ese caso, se deberá esperar más)
• La cobertura variará según la técnica de aplicación, la herramienta utilizada y la porosidad del pavimento
No se debe diluir este producto ni agregarle ingredientes (tales como arena)
HERRAMIENTAS NECESARIAS:
Armazón de rodillo de 9 pulgadas y poste de extensión
Armazón de rodillo de pelo de 1/2 pulgada (3/4 pulgada si la
calzada de entrada tiene baches o es porosa)
Agitador de pintura
OTROS PRODUCTOS PARA LA PREPARACIÓN:
latex·ite
®
Desengrasador limpiador
latex·ite
®
Imprimador para manchas de aceite
(si tiene manchas de combustible/aceite)
latex·ite
®
Relleno para grietas o productos para emparchar
Gloves
Diseñado principalmente para calzadas de acceso
asfaltadas previamente selladas. La cobertura será
menor en aplicaciones no selladas. (esperar como
mínimo 6 meses antes de sellar el asfaltado nuevo)
750 a 900 pies cuadrados por cubo
1 hora
4 horas (si las áreas están semicubiertas,
permitir 4 horas más)
Si fuese necesario, emparche y repare todas las
grietas/áreas con problemas un día antes de la
aplicación. Limpie la calzada de acceso e
imprima las manchas de combustible/aceite
antes de la aplicación.
Armazón de rodillo de pelo de ½ pulgada
y poste de extensión
Fórmula fácil de agitar: utilice un agitador
de pintura para logar una consistencia uniforme
1 capa
(2 si la calzada de entrada está en mal estado)
No debe haber pronóstico de lluvia por 48 horas.
La temperatura debe ser entre 55° F y 90° F.
Agua y jabón
10 AÑO
Rayos ultravioleta, gasolina, aceite, sales de
deshielo y otros productos químicos de los
automóviles. Rayos ultravioletas
Compuestos orgánicos volátiles (VOC) bajos,
el cubo es reciclable.
PARA USAR EN:
COBERTURA
LISTO PARA EL
TRÁFICO A PIE
LISTO PARA EL
TRÁFICO VEHICULAR
PREPARACIÓN
HERRAMIENTAS DE
APLICACIÓN
AGITACIÓN
CANTIDAD DE CAPAS
CLIMA
LIMPIEZA
GARANTÍA
RESISTE
AMBIENTE
GUÍA DE REFERENCIA DEL PROYECTO:
SIMPLE!
Clean Up: Use soap & water. Pail is recyclable.
Note:
Allow new asphalt to cure at least 6 months prior to sealing.
Limpieza: Utilice agua y jabón. El cubo es reciclable.
Nota: Deje que el asfalto nuevo se cure al menos 6 meses antes de aplicar el sellador.
Contenidos: N. ° de Servicio de Abstractos Químicos (CAS)
Agua 7732-18-5
Acrílico de vinilo Propietario
Carbonato de calcio 1317-65-3
Pigmento negro 1333-86-4
EVITE QUE SE
CONGELE
Easy How-To Info…
1. Clean…Sweep & clean off entire driveway. Scrub oil, gas
spots & stains - rinse away dirty residue with water.
2. Prime…Prevent oil spot bleed-through by brushing primer
on full strength. Goes on white…dries clear. Oil Spot primer is
available at www.latexite.com
3. Fill…Snip spout & pour crack filler into crack until just below
asphalt surface. Don’t over fill. Remains pliable.
4. Repair…Fix large cracks & low spots by troweling in layers
(1/4”-1/2” thick) of patch. Once cured, you can build up
another level...feather edges.
5. Patch…Scoop patch into ruts, potholes and cut outs…fill
above asphalt surface…then tamp to surface level. Wait 2
weeks before sealing over.
6. Stir it…Determine the number of pails to be applied (see
coverage), stir all pails thoroughly to a uniform consistency.
7. Apply…
latex·ite
®
ACRYLIC GRADE
after all repairs have cured
properly and blacktop is clean and dry. Clip any loose grass along
the edge. Start your project on the high end of the driveway.
Stir…Dip…Roll…
Stir Sealer with a paint stirrer until uniform
consistency. Dip 1/2” nap roller head into pail and seal in 4’ x 4’
square sections making sure to cross-roll using perpendicular
strokes for full coverage. Allow 1 hour prior to foot traffic and
4 hours prior to car traffic. If there are shaded areas allow 8
hours prior to car traffic.

Transcripción de documentos

TOOLS NEEDED:  9” Roller frame & extension pole  1/2” Nap roller cover (3/4” if driveway is rough/porous)  Paint stirrer OTHER PREPARATION PRODUCTS:  latex·ite® Cleaner Degreaser  latex·ite® Oil Spot Primer (if you have gas/oil spots)  latex·ite® Crack Fillers and/or Patch products  Gloves PROJECT REFERENCE GUIDE: Designed primarily for previously sealed blacktop driveways. Coverage will be FOR USE ON: lower with unsealed pavement. (Wait at least 6 months before sealing new blacktop). COVERAGE: 750 – 900 square feet per pail. FOOT TRAFFIC READY: 1 hour 4 hrs (if shaded areas allow an VEHICLE TRAFFIC READY: additional 4 hrs) If necessary, patch & repair all cracks/troubled areas day before PREPARATION: application. Clean driveway & prime any gas/oil spots prior to application. APPLICATION: TOOLS: ½” nap roller cover & extension pole STIR: Easy stir formula – use a paint stirrer to reach even consistency NUMBER OF COATS: 1 Coat (2 if driveway is in poor condition) WEATHER: No rain in forecast for 48 hours. Temperature between 55ºF-90ºF CLEAN UP: Soap & water WARRANTY: 10 YEAR RESISTS: UV Rays, gasoline, oil, de-icing salts & other car chemicals. Ultra violet rays Easy How-To Info… 1. Clean…Sweep & clean off entire driveway. Scrub oil, gas spots & stains - rinse away dirty residue with water. 2. Prime…Prevent oil spot bleed-through by brushing primer on full strength. Goes on white…dries clear. Oil Spot primer is available at www.latexite.com 3. Fill…Snip spout & pour crack filler into crack until just below asphalt surface. Don’t over fill. Remains pliable. 4. Repair…Fix large cracks & low spots by troweling in layers (1/4”-1/2” thick) of patch. Once cured, you can build up another level...feather edges. 5. Patch…Scoop patch into ruts, potholes and cut outs…fill above asphalt surface…then tamp to surface level. Wait 2 weeks before sealing over. 6. Stir it…Determine the number of pails to be applied (see coverage), stir all pails thoroughly to a uniform consistency. 7. Apply…latex·ite® ACRYLIC GRADE™ after all repairs have cured properly and blacktop is clean and dry. Clip any loose grass along the edge. Start your project on the high end of the driveway. Stir…Dip…Roll…Stir Sealer with a paint stirrer until uniform consistency. Dip 1/2” nap roller head into pail and seal in 4’ x 4’ square sections making sure to cross-roll using perpendicular strokes for full coverage. Allow 1 hour prior to foot traffic and 4 hours prior to car traffic. If there are shaded areas allow 8 hours prior to car traffic. • Not for use on concrete surfaces. • On an extremely hot day mist off surface prior to applying make sure there is no standing water. • For rough/porous driveways you may need a second coat. Using a ¾” nap roller will help application. Apply second coat after first coat is dry to to the touch (1 hour should be fine unless you have shaded areas – give extra time). • Coverage will vary on application technique, tool used and porosity of pavement. • Do not dilute this product or add ingredients to it (such as sand). OTROS PRODUCTOS PARA LA PREPARACIÓN:  latex·ite® Desengrasador limpiador  latex·ite® Imprimador para manchas de aceite (si tiene manchas de combustible/aceite)  latex·ite® Relleno para grietas o productos para emparchar  Gloves GUÍA DE REFERENCIA DEL PROYECTO: PARA USAR EN: Diseñado principalmente para calzadas de acceso asfaltadas previamente selladas. La cobertura será menor en aplicaciones no selladas. (esperar como mínimo 6 meses antes de sellar el asfaltado nuevo) COBERTURA 750 a 900 pies cuadrados por cubo LISTO PARA EL TRÁFICO A PIE 1 hora LISTO PARA EL 4 horas (si las áreas están semicubiertas, TRÁFICO VEHICULAR permitir 4 horas más) PREPARACIÓN Si fuese necesario, emparche y repare todas las grietas/áreas con problemas un día antes de la aplicación. Limpie la calzada de acceso e imprima las manchas de combustible/aceite antes de la aplicación. HERRAMIENTAS DE Armazón de rodillo de pelo de ½ pulgada APLICACIÓN y poste de extensión AGITACIÓN Fórmula fácil de agitar: utilice un agitador de pintura para logar una consistencia uniforme CANTIDAD DE CAPAS 1 capa (2 si la calzada de entrada está en mal estado) CLIMA No debe haber pronóstico de lluvia por 48 horas. La temperatura debe ser entre 55° F y 90° F. LIMPIEZA Agua y jabón GARANTÍA 10 AÑO RESISTE Rayos ultravioleta, gasolina, aceite, sales de deshielo y otros productos químicos de los automóviles. Rayos ultravioletas AMBIENTE SIMPLE! ENVIRONMENT: Low VOC, pail is recyclable Other Tips: HERRAMIENTAS NECESARIAS:  Armazón de rodillo de 9 pulgadas y poste de extensión  Armazón de rodillo de pelo de 1/2 pulgada (3/4 pulgada si la calzada de entrada tiene baches o es porosa)  Agitador de pintura Clean Up: Use soap & water. Pail is recyclable. Note: Allow new asphalt to cure at least 6 months prior to sealing. Limpieza: Utilice agua y jabón. El cubo es reciclable. Nota: Deje que el asfalto nuevo se cure al menos 6 meses antes de aplicar el sellador. Contents: Water Vinyl Acrylic Calcium Carbonate Black pigment VOC <25 g/L CAS# 7732-18-5 Proprietary 1317-65-3 1333-86-4 KEEP FROM FREEZING Compuestos orgánicos volátiles (VOC) bajos, el cubo es reciclable. 1. Limpiar…Barrer y limpiar toda la entrada. Eliminar manchas de aceite y combustible – enjuagar los restos con agua. 2. Sellar…Evitar que las manchas de aceite penetren aplicando un sellador fuerte. Va con blanco… se seca transparente. El sellador para manchas de aceite se vende en www.latexite.com 3. Rellenar…Recortar el pico y verter el relleno en la grieta justo por debajo del borde asfáltico. No rellenar demasiado. Permanece maleable. 4. Reparar…Reparar las grietas grandes y lugares hundidos aplicando en capas (de 1/4” - 1/2” de espesor) del parche. Una vez curado, se podrá aplicar otro nivel… emparejar bordes. 5. Emparchar…Aplicar el parche en surcos, baches y recortes… rellenar por sobre la superficie asfáltica… luego apisonar. Esperar 2 semanas antes de sellar. 6. Mezlar…Determinar la cantidad de baldes (ver cobertura), mezclar bien todos los baldes para lograr consistencia. 7. Aplique…latex·ite® ACRYLIC GRADE™ después de que se hayan realizado todas reparaciones adecuadamente y el asfaltado esté limpio y seco. Recortar todo el césped suelto a lo largo del borde. Comience su proyecto en el extremo alto de la calzada de acceso. Agite... moje... haga rodar... Agite el sellador con el agitador de pintura hasta que tenga una consistencia uniforme. Moje la cabeza de rodillo de pelo de 1/2 pulgada en el cubo y aplique el sellador en secciones cuadradas de 4’ x 4’ asegurándose de hacer rodar de manera cruzada con pinceladas perpendiculares para obtener una cobertura completa. Deje pasar una hora antes de caminar y 4 horas antes de pasar con un automóvil. Si hay áreas semicubiertas, deje pasar 8 horas antes de pasar con un vehículo. Otros consejos: • No utilizar en superficies de hormigón • En un día extremadamente caluroso, eliminar la niebla de la superficie antes de la aplicación; asegurarse de que no haya agua depositada • Para las calzadas de acceso que tengan baches o sean porosas, es posible que se necesite una segunda capa. Utilizar un rodillo de pelo de 3/4 pulgadas ayudará a la aplicación. Aplicar la segunda capa después de que la primera capa esté seca al tacto (1 hora sería suficiente, a menos que tenga áreas semicubiertas en ese caso, se deberá esperar más) • La cobertura variará según la técnica de aplicación, la herramienta utilizada y la porosidad del pavimento • No se debe diluir este producto ni agregarle ingredientes (tales como arena) Contenidos: Agua Acrílico de vinilo Carbonato de calcio Pigmento negro N. ° de Servicio de Abstractos Químicos (CAS) 7732-18-5 Propietario 1317-65-3 1333-86-4 EVITE QUE SE CONGELE
  • Page 1 1

Latex-ite 31766 Guía de instalación

Tipo
Guía de instalación