Bradley S19-2200 Installation Instructions Manual

Tipo
Installation Instructions Manual

Este manual también es adecuado para

P.O. Box 309, Menomonee Falls, WI 53052-0309
Phone: 1.800.BRADLEY Fax: 262.253.4161
bradleycorp.com
215-1289 Rev. L; EN 10-09-018
© 2011 Bradley Corporation
Page 1 of 22 4-11-2011
S19-2200
EFX 60/S19-2200
Thermostatic Mixing Valve
with Optional Cabinet
Robinet thermostatique
mélangeur avec armoire
en option
Válvula mezcladora termostática
con armario opcional
Table of Contents
Supplies Required ..................................................... 2
Installation Instructions ............................................. 2
Dimensions ............................................................... 3
Optional Equipment Installation ................................ 5
Troubleshooting ......................................................... 6
Sommaire
Fournitures requises ................................................. 9
Instructions relatives à l’installation ........................... 9
Dimensions ............................................................. 10
Installation de l’équipement optionnel ..................... 12
Dépannage ............................................................. 13
Tabla de contenidos
Materiales necesarios ............................................. 16
Instrucciones de instalación .................................... 16
Dimensiones ........................................................... 17
Instalaciones de equipos opcionales ...................... 19
Solución de problemas ........................................... 20
Installation
Inlet Connections: 1" NPT
Outlet Connection: 1-1/4" NPT
Temperature Range: 65 95°F
Maximum Pressure: 125 PSI
Inlet Temperature Hot: 120 180° F
Inlet Temperature Cold: 33 80° F
Minimum Temperature Differential
(from valve set point): 20° F
Raccords d’arrivée : 1 po NPT
Raccord de sortie : 1-1/4 po NPT
Plage de température : 65 95 °F
Pression maximum : 125 lb/po
2
Température d’arrivée, eau chaude : 120 180 °F
Température d’arrivée, eau froide : 33 80 °F
Différence de température minimum
(à partir de valeur de consigne de robinet) : 20 °F
Conexiones de entrada: NPT de 1 pulg.
Conexión de salida: NPT de 1-1/4 pulg.
Rango de temperaturas: 65 – 95 °F
Presión máxima: 125 PSI
Temperatura de entrada, caliente: 120 – 180 °F
Temperatura de entrada, fría: 33 – 80 °F
Diferencial de temperatura mínima
(desde el punto de ajuste de la válvula): 20 °F
EFX60/P/RS
EFX 60/S19-2200 Installation
2 4-19-2011 Bradley Corporation • 215-1289 Rev. L; EN 10-09-018
Supplies recommended for installation
Lockable shut-off on the outlet if tempered water is supplied to one or more emergency fixtures
Lockable shut-off on the inlets/supplies
(6) 3/8" wall anchors and fasteners for surface-mounted cabinet
(4) 1/4" fasteners (and wall anchors, if necessary) for recess-mounted cabinet
Unions on all connections to facilitate removal of valve
Tools required for temperature adjustment
5/32" Allen wrench
Blade screwdriver
1
Install Optional Cabinet (If not installing cabinet, skip to Step 2)
Recessed Cabinet:
1. Rough-in wall opening 24-1/2" W x 28-1/2".
2. Insert the cabinet and secure to wall with four 1/4" fasteners
properly anchored (supplied by installer.)
3. Install two anchors and screws through the valve bracket in
back of the cabinet into a secure brace (supplied by installer) or
into wall. This will support the valve.
4. Install the valve nipples and one-half of the union ball valve
using pipe sealant or tefl on tape. Install the other half of the
union ball valve onto inlet and outlet pipe.
5. Insert the valve into the bracket in the cabinet (right side goes
in fi rst). Continue with the valve installation procedure.
6. Position the wall fl ange tight to the wall and caulk in place.
Surface-Mounted Cabinet:
1. Measure and mark the cabinet mounting hole locations
at the dimensions shown on next page. Install six 3/8" wall
anchors (supplied by installer).
2. Position the cabinet onto the wall and secure into place
with six 3/8" wall fasteners (supplied by installer).
3. Install the valve nipples and one-half of the union ball
valve using pipe sealant or tefl on tape. Then install the
other half of the union ball valve onto the inlet and outlet
piping.
4. Insert the valve into the bracket in the cabinet (right
side of the valve goes in fi rst). Continue with the valve
installation procedure.
IMPORTANT!
Read this entire installation manual to ensure proper installation. When
nished with the installation, le this manual with the owner or maintenance
department. Compliance and conformity to local codes and ordinances is
the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for
before discarding packaging material. If any parts are missing, do not begin
installation until you obtain the missing parts.
Make sure that all water supply lines have been fl ushed and then completely
turned off before beginning installation. Debris in supply lines can cause
valves to malfunction.
Product warranties may be found under “Products” on our web site at
bradleycorp.com.
Installation
THIS
SIDE
U
P
Packing List
Installation EFX 60/S19-2200
Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 4-19-2011 3
(mm)
22-3/4" (578)
Door
10-3/16"
(259)
7-5/8"
(194)
8-3/4"
(222)
26"
(660)
24"
(610)
Nipple
Union Ball
Valve
2" (51)
1-1/4" NPT
Outlet
0.28" Dia. Holes
(4) each side,
(8) Total
6-1/2"
(165)
2"
(51)
1" NPT
Inlets
2-1/2"
(64)
5"
(127)
2-1/2"
(64)
18"
(457)
28"
(711)
Wall
Flange
26-3/4"
(679)
Door
2-1/4" (57)
30"
(762)
Bottom View
Side ViewFront View
22-3/4" (578)
Door
10-3/16"
(259)
7-5/8"
(194)
8-3/4"
(222)
24"
(610)
Nipple
Union Ball
Valve
1-1/4" NPT Outlet
6-1/2"
(165)
1" NPT
Inlets
2-1/2"
(64)
2-1/2"
(64)
28"
(711)
26-3/4"
(679)
Door
2-1/4" (57)
Mounting Hole Locations
9-3/4"
(248)
9-3/16"
(233)
24"
(610)
20"
(508)
5-1/8"
(130)
2"
(51)
2"
(51)
0.47 Dia. Holes
(6) Places
Optional Recessed Cabinet
Optional Surface-Mounted Cabinet
Wall Opening:
24-1/2" W x 28-1/2" H
EFX 60/S19-2200 Installation
4 4-19-2011 Bradley Corporation • 215-1289 Rev. L; EN 10-09-018
2
Connect Supply Lines and Install Thermometer
3
Adjust Temperature with Water Running
When the check valves are in the
open (opera ting) position, the cover
screw for the stop/check stem will
be fl ush with the valve cap.
Check for leaks by pressurizing
unit SLOWLY.
Install Thermometer using pipe
sealant or tefl on tape.
Check the temperature when approximately 10 GPM
water fl ow is reached (equivalent to two face washes)
Slotted Cover
Screw
Stop/Check
Cover Screw
Check
Stop Nut
Water Recirculation
Plug
Thermometer
Tempered Water
(to Fixture)
HOT
COLD
Slotted Cover
Screw
Temperature Set
Screw
C
H
4
Test Unit
Shut the hot water supply off by closing hot water inlet valve or supply check valve. While the hot water supply is turned off,
check to make sure the cold water continues to fl ow. If the cold water is fl owing properly, reopen the hot water supply.
Shut the cold water supply off by closing the cold water inlet valve or supply check valve. While the cold water supply is off,
check to make sure that the hot water fl ow has shut down. If hot water is shut down, reopen cold water supply. Test unit
weekly for proper function and desired set temperature.
DO NOT SKIP THIS STEP!!!
This device must be checked for fi nal temperature and adjusted as
necessary. The standard preset factory temperature setting is 85°F
(29°C). [the range of the valve is 65°F – 95°F (18°C – 35°C)]. Consult
proper medical and/or safety authorities for the optimum temperature
recommended for your particular application.
5/32" Allen Wrench
Installation EFX 60/S19-2200
Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 4-19-2011 5
5
Optional Water Recirculation Setup
Check Valve
(Typ)
COLD
HOT
Heat Trap
28" Drop
Balancing Valve (Typ)
Water
Heater
Storage
Tank
Tempered Water Flow
Return Flow
Temperature Switch
Recirculated
Tempered
Water
Recirculating Pump
Cold
Water
Recirculating the water in the system provides constant regulation of the water temperature. Flush the supply lines thoroughly
after completing installation. Close off all fi xtures and label them as not available for use durin g the recirculating process.
1. Turn off the recirculating pump and turn on the water supply at emergency fi xture (a water fl ow rate of 10-15 GPM is required).
2. Let the water run through the system until a consistent temperature is obtained. If you do not obtain the required temperature,
refer to step #3 on previous page for temperature readjustment.
3. As soon as the water reaches the proper temperature, turn on the recirculating pump (make certain the proper system
temperature has been achieved before proceeding).
4. Check the water temperature at the return pump. If the temperature exceeds the appropriate level by 2°F, adjust the temperature
high-limit switch (this will turn off the pump). Wait until the return water temperature is 5°F below the appropriate level and adjust the
low-limit switch (this will turn the pump back on).
5. Open the balancing valve completely.
6. Turn off all fi xtures and make sure there is no water running through the system (the cold inlet pipe should feel warm to the touch).
7. Let the system run for 30 minutes or longer without water. If, after thirty minutes, the water temperature increases, you may
readjust the temperature by slowly closing the balancing valve until the appropriate temperature is reached.
Alternate
Recirculation
(less than 5 GPM)
EFX 60/S19-2200 Installation
6 4-19-2011 Bradley Corporation • 215-1289 Rev. L; EN 10-09-018
Troubleshooting Thermostatic Mixing Valve
Problem Cause Solution
External leaks in the
system
Either the NPT joints or the o-rings have been
damaged.
Replace the NPT joints and/or o-rings where necessary. For
replacement of o-rings, contact your Bradley representative and ask
for O-Ring Seal Kit (S65-177).
No hot water fl ow (cold
water fl ow only)
The thermostat has failed and, subsequently, the
safety shut-off has engaged.
Inspect Thermostat:
1. Remove the top cap and pull out the push rod and thermostat.
2. Insert a 7/16" dia. rod into the thermostat bellows.
3. Mark the length of the thermostat bellows (at room temperature,
with 10 lb. of force, the bellows length should be approx. 2-5/8").
4. If the thermostat bellows length is not in the proper range, the
thermostat must be replaced (it cannot be repaired). Contact your
Bradley representative and ask for Thermostat Kit (S65-178).
Limited water fl ow The inlet shut-off valve may be partially closed
or there has been a signifi cant decrease in water
pressure.
Dirt and debris have collected on the check
screen or seat, limiting the movement of the stop
and checks.
Clean Stop and check Valves:
Remove the stop and checks, clean the screen and seat and
reassemble the valve. Do not remove the seat. The components
may be scraped with a screwdriver to remove debris. A pair of
tweezers works well for pulling debris out from the seat. If the
stop and checks need to be replaced, contact your Bradley
representative and ask for Check/Stop Kit (S65-179).
Temperature fl uctuation
or improper Temperature
The stop and check sections of the valve do not
move freely.
Clean Stop and Check Valves as described above.
Thermostat is slowly failing. Check Thermostat as described above, or replace.
Inlet supply line to the mixing valve is being
shared by other pieces of equipment that are
used only periodically, such as laundry appliances
or washdown stations. It may reduce the inlet
pressure to the mixing valve to less than 10 PSI.
The supply line size may not be large enough to
supply both the valve and the other appliances.
Enlarge the supply line size, reconfi gure the supply line or regulate
the supply usage.
Recirculation is not balanced. Review recirculation set up on page 5.
Piston does not move freely and must be cleaned. See next page for piston disassembly and cleaning directions.
Before attempting to troubleshoot the valve or
disassemble the components, check for the following:
Stop/check valves are fully open (the slotted stem
must be flush with the stop/check cap) and that all
inlet and outlet shut-off valves are open
Hot and cold inlet pipes are connected properly,
and that there are no cross-connectio ns or leaking
stop/check valves
Water heater output is at least 15° F above the set
temperature.
Be sure to close the appropriate shut-off valves prior
to disassembly of the valve and reopen the valves
after inspection and repair is complete.
Stop/Check Valve
Valve Seat
Stop/Check
Strainer
Installation EFX 60/S19-2200
Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 4-19-2011 7
C
If the rod travels less than1/2", the piston is not
moving freely within the liner and they must be
cleaned:
1. Remove the control section assembly, top cap
and thermostat.
2. Unthread the liner from the cap (it is glued
together; the o-rings must be removed and heat
should be applied to melt the glue and loosen
the liner).
3. Clean the piston and liner with any cleaner
suitable for brass and stainless steel (400-grit
sandpaper may be used to polish and hone the
piston and liner).
Troubleshooting: Piston Disassembly and Cleaning
To prevent injuries, use proper protective equipment for
eyes and skin when using a propane torch.
Thermostat
Top Cap
with Pushrod
7/16"
Rod
Piston Overheat
Chamber
The second mark
should be 1/2"
higher on the rod
than the fi rst mark.
B
Insert a 7/16" dia. rod into the valve and into the
piston overheat chamber. Mark the length of the
rod inside the valve. Push the rod until the piston
stops and mark the new length.
D
Push the mechanism up and down several times
to make sure the piston moves smoothly and
consistently. If it is not consistent, repeat Procedure
C until it moves freely, or replace. Contact your
Bradley representative and ask for Piston/Liner Kit
(part number S65-180).
A
Remove the valve’s top cap and pull out the
push rod and then the thermostat. You may use a
needle-nose pliers to remove the thermostat from
the valve body if desired.
EFX 60/S19-2200 Installation
8 4-19-2011 Bradley Corporation • 215-1289 Rev. L; EN 10-09-018
Item Qty. Description
4 1 Washer
9 1 Washer
32 2 Seal
33 2 Washer
45 1 Washer
Washer/Seal Kit S65-311
Item Qty. Description
2 1 O-Ring
10 1 O-Ring
12 1 O-Ring
17 1 O-Ring
18 1 O-Ring
19 1 O-Ring
21 1 O-Ring
26 2 O-Ring
28 2 O-Ring
36 2 O-Ring
O-Ring Kit S65-177
Item Qty. Description
25 2 Cap
26 2 O-Ring
27 2 Stem
28 2 O-Ring
29 2 Strainer
30 1 Hot Supply
Spring
31 2 Holder
(for Seal)
32 2 Seal
33 2 Washer
34 2 Nut
35 2 Seat
36 2 O-Ring
47 1 Cold Supply
Spring (Blue)
Check/Stop Kit S65-359
Item Qty. Description
15 1 Thermostat
17 1 O-Ring
21 1 O-Ring
Thermostat Kit S65-178
Item Qty. Description
2 1 O-Ring
3 1 Liner
4 1 Washer
5 1 Screw
6 1 Spring
7 1 Lower Overheat
Chamber
8 1 Spring
9 1 Washer
10 1 O-Ring
11 1 Piston
12 1 O-Ring
13 1 Upper Overheat
Chamber
14 1 Upper Seat
45 1 Washer
Piston & Liner Kit S65-180
Item Qty. Description
2 1 O-Ring
3 1 Liner
4 1 Washer
5 1 Screw
6 1 Spring
7 1 Lower Overheat
Chamber
8 1 Spring
9 1 Washer
10 1 O-Ring
11 1 Piston
12 1 O-Ring
13 1 Upper Overheat
Chamber
14 1 Upper Seat
15 1 Thermostat
16 1 Pushrod
17 1 O-Ring
18 1 O-Ring
19 1 O-Ring
20 1 Mixing Valve Cap
21 1 O-Ring
22 1 Control Cap
23 1 Set Screw
24 1 Screw
45 1 Washer
Center Section Kit S65-305
Kit numbers for rough brass fi nish and standard range
thermostat. Contact Bradley for other confi gurations.
Brass Pipe (3/4" IPS)Valve Body
Thermometer
Parts Breakdown
Cold Supply Spring is marked with
blue paint. DO NOT SWITCH WITH
HOT SUPPLY SPRING (30).
36
29
35
46
Installation EFX 60/S19-2200
Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 4-19-11 9
Fournitures requises pour l’installation :
Robinet d’arrêt verrouillable sur la sortie en cas d’alimentation d’eau tempérée vers un ou plusieurs appareils d’urgence
Robinet d’arrêt verrouillable sur les arrivées/alimentations
(6) Ancrages muraux et fixations 3/8 po pour armoire montée en surface
(4) Fixations 1/4 po (et ancrages muraux, si nécessaire) pour armoire encastrée
Raccords sur toutes les connexions pour faciliter la dépose du robinet
Outils requis pour réglage de température
Clé Allen 5/32 po
Tournevis à lame
1
Installer l’armoire en option (si l’installation d’une armoire n’est pas requise,
passer à l’étape 2).
Armoire encastrée :
1. Ouverture murale pour plomberie brute 62 cm L x 72 cm
(24-1/2 po L x 28-1/2 po).
2. Insérer l’armoire et la fi xer au mur avec quatre fi xations 1/4 po
adéquatement ancrées (fournies par l’installateur).
3. Installer deux ancrages et vis à travers le support de robinet à l’arrière
de l’armoire et dans un contrevent sécuritaire (fourni par l’installateur) ou
dans un mur. Cela soutiendra le robinet.
4. Installer les raccords fi letés du robinet et la moitié du clapet à bille
du raccord en utilisant un produit d’étanchéité pour tuyaux ou du ruban
téfl on. Installer l’autre moitié du clapet à bille du raccord sur le tuyau
d’entrée et de sortie.
5. Insérer le robinet dans le support dans l’armoire (le côté droit entre en
premier). Continuer avec la procédure d’installation du robinet.
6. Positionner la rosace murale tout contre le mur et colmater en place.
Armoire montée en surface :
1. Mesurer et marquer les emplacements des trous de montage
de l’armoire selon les dimensions indiquées à la page suivante.
Installer six ancrages muraux de 3/8 po (fournis par l’installateur).
2. Positionner l’armoire dans le mur et fi xer en place avec six
xations murales de 3/8 po (fournies par l’installateur).
3. Installer les raccords fi letés du robinet et la moitié du clapet à
bille du raccord en utilisant un produit d’étanchéité pour tuyaux
ou du ruban téfl on. Puis installer l’autre moitié du clapet à bille du
raccord sur le tuyau d’entrée et de sortie.
4. Insérer le robinet dans le support dans l’armoire (le côté
droit du robinet entre en premier). Continuer avec la procédure
d’installation du robinet.
IMPORTANT !
Lire ce manuel d’installation dans son intégralité pour garantir une
installation appropriée. Une fois celle-ci terminée, classer ce manuel auprès
du service à la clientèle ou d’entretien. L’installateur est responsable de
respecter la conformité aux codes et ordonnances locaux.
Séparer les pièces de l’emballage et veiller à bien avoir toutes les pièces
avant de jeter le matériau d’emballage. Le cas échéant, ne pas commencer
l’installation avant d’avoir obtenu les pièces manquantes.
Veiller à bien vidanger et fermer toutes les conduites d’eau avant de
commencer l’installation. Tout débris dans les conduites d’alimentation
risque de provoquer un mauvais fonctionnement des soupapes.
Les garanties du produit se trouvent sous la rubrique « Products »
(Produits) sur notre site Web à bradleycorp.com
Installation
THIS
SID
E
UP
Packing List
EFX 60/S19-2200 Installation
10 4-19-11 Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018
(mm)
22-3/4 po (578)
Porte
10-3/16 po
(259)
7-5/8 po
(194)
8-3/4 po
(222)
26 po
(660)
24 po
(610)
Raccord
Clapet à bille
pour raccord
2 po (51)
1-1/4 po NPT
Sortie
0,28 po Dia. Trous
(4) de chaque côté,
(8) Total
6-1/2 po
(165)
2 po
(51)
1 po NPT
Entrées
2-1/2 po
(64)
5 po
(127)
2-1/2 po
(64)
18 po
(457)
28 po
(711)
Rosace
murale
26-3/4 po
(679)
Porte
2-1/4 po (57)
30 po
(762)
Vue de dessous
Vue latéraleVue de face
22-3/4 po (578)
Porte
10-3/16 po
(259)
7-5/8 po
(194)
8-3/4 po
(222)
24 po
(610)
Raccord fi leté
Clapet à bille
pour raccord
1-1/4 po NPT Sortie
6-1/2 po
(165)
1 po NPT
Entrées
2-1/2 po
(64)
2-1/2 po
(64)
28 po
(711)
26-3/4 po
(679)
Porte
2-1/4 po (57)
Emplacement des trous de montage
9-3/4 po
(248)
9-3/16 po
(233)
24 po
(610)
20 po
(508)
5-1/8 po
(130)
2 po (51)
2 po (51)
0,47 Dia.
Trous (6)
Emplacements
Armoire encastrée en option
Armoire montée en surface en option
Ouverture murale :
24-1/2 po L x 28-1/2 po H
Installation EFX 60/S19-2200
Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 4-19-11 11
2
Connecter les conduites d’alimentation et installer le thermostat
3
Régler la température avec l’eau qui s’écoule
Lorsque les clapets de non-retour sont
en position ouvert (en fonctionnement),
la vis d’obturation pour la tige arrêt/non-
retour sera égale avec le capuchon du
robinet.
Vérifi er la présence de fuites en
pressurisant l’unité LENTEMENT.
Installer le thermostat en utilisant un
produit d’étanchéité pour tuyaux ou
du ruban téfl on.
Vérifi er la température lorsque le débit d’eau atteint environ
10 GPM (équivalent de deux douches faciales)
Vis d’obturation
à fente
Vis d’obturation
arrêt/non-retour
Écrou Non-
retour Arrêt
Bouchon de
recirculation d’eau
Thermomètre
Eau tempérée
(vers appareil)
CHAUD
FROID
Vis
d’obturation
à fente
Vis de réglage de
température
C
H
4
Tester unité
Fermer l’arrivée d’eau chaude en fermant le robinet d’arrivée d’eau chaude ou le clapet de non-retour. Pendant que l’alimentation d’eau
chaude est coupée, vérifi er que le débit d’eau froide continue de s’écouler. Si l’eau froide circule correctement, rouvrir l’alimentation d’eau
chaude.
Fermer l’arrivée d’eau froide en fermant le robinet d’arrivée d’eau froide ou le clapet de non-retour. Pendant que l’alimentation d’eau froide
est coupée, vérifi er que le débit d’eau chaude s’est arrêté. Si l’eau chaude est arrêtée, rouvrir l’alimentation d’eau froide. Tester l’unité
chaque semaine pour s’assurer d’un bon fonctionnement et d’un réglage de température désiré.
NE PAS SAUTER CETTE ÉTAPE !!!
Cet appareil doit être vérifi é pour sa température fi nale et ajusté si
nécessaire. Le réglage de température standard préréglé en usine est à
29 °C (85 °F). [la plage du robinet va de 18 °C – 35 °C (65 °F – 95 °F)].
Consulter les autorités médicales et/ou de sécurité appropriées pour
connaître la température optimale recommandée pour l’application en
question.
5/32 po Clé Allen
EFX 60/S19-2200 Installation
12 4-19-11 Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018
5
Confi guration de recirculation d’eau optionnelle
Clapet de non-retour (Typ)
FROID
CHAUD
Piège à chaleur
Descente 28 po
Robinet d’équilibrage (Typ)
Chauffe-eau
Réservoir de
stockage
Débit d’eau tempérée
Écoulement
restitué
Interrupteur de température
Eau tempérée
recirculée
Pompe de recirculation
Eau froide
Recirculer l’eau dans le système offre une régulation constante de la température de l’eau. Rincer les conduites d’alimentation complètement
après avoir complété l’installation. Fermer tous les appareils et les identifi er comme non disponibles pour utilisation durant le processus de
recirculation.
1. Fermer la pompe de recirculation et ouvrir l’alimentation en eau au niveau de l’appareil d’urgence (un débit d’eau de 38-57 l/min [10-15 gal/min]
est requis).
2. Laisser l’eau circuler à travers le système jusqu’à ce qu’une température constante soit obtenue). Si vous n’obtenez pas la température requise,
consulter l’étape 3 à la page précédente pour un réajustement de la température.
3. Aussitôt que la température adéquate de l’eau est atteinte, ouvrir la pompe de recirculation (s’assurer que la température adéquate ait été atteinte
avant de poursuivre).
4. Vérifi er la température de l’eau au niveau de la pompe de retour. Si la température dépasse le niveau approprié par 1,1 °C (2 °F), ajuster
l’interrupteur de limite supérieure de température (cela fermera la pompe). Attendre que la température de retour d’eau soit 2,8 °C (5 °F) sous le
niveau approprié et ajuster l’interrupteur de limite inférieure (cela rouvrira la pompe).
5. Ouvrir complètement le robinet d’équilibrage.
6. Fermer tous les appareils et s’assurer qu’il n’y a pas d’eau qui circule à travers le système (le tuyau d’arrivée d’eau froide devrait être chaud au
toucher).
7. Laisser le système fonctionner pendant 30 minutes ou plus sans eau. Si, après 30 minutes, la température de l’eau augmente, vous pour pouvez
rajuster la température en fermant lentement le robinet d’équilibrage jusqu’à ce que la température appropriée soit atteinte.
Recirculation
alternative (moins de
19 l/min [5 gal/min])
Installation EFX 60/S19-2200
Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 4-19-11 13
Dépannage du robinet mélangeur thermostatique
Problème Cause Solution
Fuites externes dans le
système
Les joints NPT ou les joints toriques ont été
endommagés.
Remplacer les joints NPT et/ou joints toriques le cas échéant. Pour tout
remplacement de joints toriques, contacter le représentant Bradley et lui
demander un Kit de joint torique (référence S65-177).
Aucun débit d’eau chaude
(débit d’eau froide
seulement)
Le thermostat est défectueux et donc le dispositif d’arrêt
automatique de sécurité s’est enclenché.
Vérifi er le thermostat :
1. Enlever le capuchon supérieur et retirer la tige de culbuteur et le
thermostat.
2. Insérer une tige de 7/16 po de diamètre dans le souffl et du thermostat.
3. Marquer la course du souffl et du thermostat (à la température de la pièce,
avec une force de 10 lb, la course du souffl et devrait être d’environ 6,7 cm
[2-5/8 po]).
4. Si la course du souffl et du thermostat n’est pas dans la plage appropriée,
le thermostat doit être remplacé (il ne peut pas être réparé). Contacter le
représentant Bradley et lui demander un Kit de thermostat (S65-178).
Débit d’eau limité Le robinet d’arrêt d’arrivée est possiblement fermé
partiellement ou il y a eu une diminution signifi cative au
niveau de la pression d’eau.
La saleté et les débris se sont accumulés sur le siège ou
le tamis des clapets d’arrêt/de non-retour, ce qui limite le
mouvement de ces derniers.
Nettoyer les clapets d’arrêt et de non-retour :
Enlever ces derniers, nettoyer le tamis et le siège et remonter le robinet.
Ne pas enlever le siège. Gratter les composants avec un tournevis pour
enlever les débris. Des pincette peuvent être utilisées pour enlever les
débris du siège. Pour remplacer les clapets d’arrêt/de non-retour, contacter
le représentant Bradley et demander un Kit de clapet d’arrêt/de non-retour
(référence S65-179).
Température d’eau
inadéquate ou fl uctuation de
température.
Les sections arrêt/non-retour du robinet ne se déplacent
pas librement.
Nettoyer les clapets d’arrêt et de non-retour tel que décrit ci-dessus.
Le thermostat commence à être défectueux. Vérifi er le thermostat tel que décrit ci-dessus, ou remplacer.
La conduite d’alimentation d’arrivée vers le robinet
mélangeur est partagé par les autres machines qui sont
utilisées uniquement périodiquement, telles que les
machines à laver ou les stations à siphon directe. Cela
peut diminuer la pression d’arrivée au robinet mélangeur
à moins de 0,7 bar (10 lb/po
2
). La taille de la conduite
d’alimentation peut ne pas être suffi samment large
pour alimenter à la fois le robinet et les autres appareils
ménagers.
Agrandir la taille de la conduite d’alimentation, reconfi gurer la conduite
d’alimentation ou réguler l’usage d’alimentation.
La recirculation n’est pas équilibrée. Réviser la confi guration de la recirculation à la page 12.
Le piston ne se déplace pas librement et doit être
nettoyé.
Consulter la page suivante pour le démontage du piston et des instructions
de nettoyage.
Avant d’essayer de dépanner le robinet ou de démonter les
composants, vérifi er ce qui suit :
Les clapets d’arrêt/non-retour sont complètement ouverts
(la tige à fente doit être égale avec le capuchon d’arrêt/
non-retour) et que les robinets d’arrêt d’arrivée et de
sortie sont ouverts
Les canalisations d’arrivée chaude et froide
sont correctement raccordées et il n’existe ni de
raccordements croisés ni de fuite de clapets arrêt/non-
retour.
La sortie du chauffage d’eau est d’au moins 8,3 °C
(15 °F) au dessus de la température réglée.
S’assurer de fermer les robinets d’arrêt adéquats avant de
démonter le robinet et de les rouvrir après inspection et une
fois la réparation terminée.
Robinetterie arrêt/
non-retour
Siège du robinet
Crépine Arrêt/
Non-retour
EFX 60/S19-2200 Installation
14 4-19-11 Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018
C
Si la tige se déplace de moins de 12,7 mm (1/2 po),
le piston ne se déplace pas librement en dedans du
revêtement et doit être nettoyé :
1. Retirer l’ensemble section de contrôle, le capuchon
supérieur et le thermostat.
2. Enlever le revêtement du capuchon (il est collé
ensemble; les joints toriques doivent être enlevés et de
la chaleur doit être appliquée pour faire fondre la colle
et desserrer le revêtement).
3. Nettoyer le piston et le revêtement avec tout
nettoyant approprié pour du cuivre ou de l’acier
inoxydable (du papier sablé grosseur 400 peut être
utilisé pour polir et affuter le piston et le revêtement).
Dépannage : Démontage du piston et nettoyage
Afi n de prévenir les blessures, utiliser de l’équipement de
protection approprié pour les yeux et la peau lorsque vous
utilisez un chalumeau à propane.
Thermostat
Capuchon supérieur
avec poussoir
Tige 7/16 po
Chambre de
surchauffe du
piston
La seconde marque
doit être 12,7 mm
(1/2 po) plus haute
sur la tige que la
première marque.
B
Insérer une tige de 7/16 po de diamètre dans le robinet
et dans la chambre de surchauffe du piston. Marquer la
longueur de la tige à l’intérieur du robinet. Pousser la tige
jusqu’à ce que le piston arrête et marquer la nouvelle
longueur.
D
Pousser le mécanisme en haut et en bas plusieurs fois
pour s’assurer que le piston se déplace librement et de
façon constante. Si non constant, répéter la Procédure
C jusqu’à satisfaction, ou remplacer. Contacter votre
représentant Bradley et lui demander un Kit de Piston/
Revêtement (référence S65-180).
A
Enlever le capuchon supérieur et retirer la tige de
culbuteur puis le thermostat. Vous pouvez utiliser des
pinces à becs fi ns pour enlever le thermostat du corps du
robinet si désiré.
Installation EFX 60/S19-2200
Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 4-19-11 15
Repère Qté Désignation
4 1 Rondelle
9 1 Rondelle
32 2 Joint
33 2 Rondelle
45 1 Rondelle
Kit Rondelle/Joint S65-311
Repère Qté Désignation
2 1 Joint torique
10 1 Joint torique
12 1 Joint torique
17 1 Joint torique
18 1 Joint torique
19 1 Joint torique
21 1 Joint torique
26 2 Joint torique
28 2 Joint torique
36 2 Joint torique
Kit Joint torique S65-177
Repère Qté Désignation
25 2 Capuchon
26 2 Joint torique
27 2 Tige
28 2 Joint torique
29 2 Crépine
30 1 Ressort
alimentation en
eau chaude
31 2 Support
(pour Joint)
32 2 Joint
33 2 Rondelle
34 2 Écrou
35 2 Siège
36 2 Joint torique
47 1 Ressort
alimentation en
eau froide (Bleu)
Kit Arrêt/Non-retour S65-359
Repère Qté Désignation
15 1 Thermostat
17 1 Joint torique
21 1 Joint torique
Kit Thermostat S65-178
Repère Qté Désignation
2 1 Joint torique
3 1 Gaine
4 1 Rondelle
5 1 Vis
6 1 Ressort
7 1 Chambre de
surchauffe
inférieure
8 1 Ressort
9 1 Rondelle
10 1 Joint torique
11 1 Piston
12 1 Joint torique
13 1 Chambre de
surchauffe
supérieure
14 1 Siège supérieur
45 1 Rondelle
Kit Piston et Revêtement S65-180
Repère Qté Désignation
2 1 Joint torique
3 1 Gaine
4 1 Rondelle
5 1 Vis
6 1 Ressort
7 1 Chambre de surchauffe
inférieure
8 1 Ressort
9 1 Rondelle
10 1 Joint torique
11 1 Piston
12 1 Joint torique
13 1 Chambre de surchauffe
supérieure
14 1 Siège supérieur
15 1 Thermostat
16 1 Poussoir
17 1 Joint torique
18 1 Joint torique
19 1 Joint torique
20 1 Capuchon du robinet
mélangeur
21 1 Joint torique
22 1 Capuchon de
commande
23 1 Vis calante
24 1 Vis
45 1 Rondelle
Trousse portion centrale S65-305
Numéros de trousse pour la fi nition laiton brut et le thermostat
standard. Contacter Bradley pour toute autre confi guration.
Le ressort d’alimentation en eau
froide est identifi é avec de la peinture
bleue. NE PAS CHANGER AVEC LE
RESSORT D’ALIMENTATION EN EAU
CHAUDE (30).
Tuyau en laiton (3/4 po IPS)Corps de robinet
Thermomètre
Liste des pièces
36
29
35
46
EFX 60/S19-2200 Instalación
16 4-19-11 Bradley Corporation • 215-1289 Mod. L; ES 10-09-018
Materiales recomendados para la instalación
Cierre bloqueable en la salida si se suministra agua temperada a uno o más accesorios de emergencia
Cierre bloqueable de las entradas o de los suministros
(6) anclajes y sujetadores de pared de 3/8 pulg. para el gabinete montado en la superficie
(4) sujetadores de 1/4 pulg. (y anclajes de pared, si fuera necesario) para el gabinete empotrado
Uniones en todas las conexiones para facilitar el retiro de la válvula
Herramientas necesarias para el ajuste de temperatura
Llave Allen de 5/32 pulg.
Destornillador de paleta
1
Instale el gabinete opcional (si no va a instalar el gabinete, siga con el Paso 2)
Gabinete empotrado:
1. Orifi cio de colocación en la pared de 62 cm (24-1/2 pulg.) de ancho x
72 cm (28-1/2 pulg.).
2. Inserte y fi je el gabinete con cuatro sujetadores de 1/4 pulg.
(proporcionado por el instalador) anclados apropiadamente a la pared.
3. Instale los dos anclajes y tornillos a través del soporte de la válvula
en la parte trasera del gabinete en una abrazadera fi rme (proporcionada
por el instalador) o en la pared. Esto soportará la válvula.
4. Instale los niples de la válvula y la mitad de la válvula de bolas de la
unión, usando sellador para tubos o cinta de tefl ón. Instale la otra mitad
de la válvula de bolas de la unión en el tubo de entrada y salida.
5. Inserte la válvula en el soporte del gabinete (primero el lado derecho).
Continúe con el procedimiento de instalación de la válvula.
6. Ponga fi rmemente la brida de pared en la pared y aplique masilla
para fi jarla en su lugar.
Gabinete montado en la superfi cie:
1. Mida y marque la ubicación de los orifi cios de montaje
del gabinete en las dimensiones que se muestran en la
siguiente página. Instale seis anclajes de pared de 3/8 pulg.
(proporcionados por el instalador).
2. Ponga el gabinete en la pared y fíjelo en su lugar con seis
sujetadores de pared de 3/8 pulg. (proporcionados por el
instalador).
3. Instale los niples de la válvula y la mitad de la válvula de bolas
de la unión, usando sellador para tubos o cinta de tefl ón. Luego,
instale la otra mitad de la válvula de bolas de la unión en el tubo
de entrada y salida.
4. Inserte la válvula en el soporte del gabinete (primero el
lado derecho de la válvula). Continúe con el procedimiento de
instalación de la válvula.
¡IMPORTANTE!
Lea en su totalidad este manual de instalación para garantizar una
instalación adecuada. Al completar la instalación, entregue este manual al
propietario o al Departamento de Mantenimiento. Es responsabilidad del
instalador cumplir a cabalidad los códigos y las ordenanzas locales.
Saque las piezas del embalaje y asegúrese de haberlas sacado todas antes
de desecharlo. Si falta alguna pieza, no comience la instalación hasta
obtenerla.
Asegúrese de purgar todas las tuberías de suministro de agua y que estén
completamente cerradas antes de comenzar la instalación. Los desechos
acumulados en las tuberías de suministro pueden provocar defectos en el
funcionamiento de las válvulas.
Las garantías del producto se pueden encontrar en la sección “Products”
(Productos) del sitio Web, bradleycorp.com.
Installation
THIS
SID
E
U
P
Packing List
Instalación EFX 60/S19-2200
Bradley Corporation • 215-1289 Mod. L; ES 10-09-018 4-19-11 17
(mm)
22-3/4 pulg. (578)
Puerta
10-3/16 pulg.
(259)
7-5/8 pulg.
(194)
8-3/4 pulg.
(222)
26 pulg.
(660)
24 pulg.
(610)
Niple
Válvula de bolas
de la unión
2 pulg. (51)
Salida de
NPT de 1-1/4 pulg.
0,28 pulg. de diá. Orifi cios
(4) a cada lado,
(8) Total
6-1/2 pulg.
(165)
2 pulg.
(51)
Entradas de NPT
de 1 pulg.
2-1/2 pulg.
(64)
5 pulg.
(127)
2-1/2 pulg.
(64)
18 pulg.
(457)
28 pulg.
(711)
Brida de
pared
26-3/4 pulg.
(679)
Puerta
2-1/4 pulg. (57)
30 pulg.
(762)
Vista inferior
Vista lateralVista frontal
22-3/4 pulg. (578)
Puerta
10-3/16 pulg.
(259)
7-5/8 pulg.
(194)
8-3/4 pulg.
(222)
24 pulg.
(610)
Niple
Válvula de bolas
de la unión
Salida de NPT de 1-1/4 pulg.
6-1/2 pulg.
(165)
Entradas de NPT
de 1 pulg.
2-1/2 pulg.
(64)
2-1/2 pulg.
(64)
28 pulg.
(711)
26-3/4 pulg.
(679)
Puerta
2-1/4 pulg. (57)
Ubicación de los orifi cios de montaje
9-3/4 pulg.
(248)
9-3/16 pulg.
(233)
24 pulg.
(610)
20 pulg.
(508)
5-1/8 pulg.
(130)
2 pulg. (51)
2 pulg. (51)
0,47 de diá.
Orifi cios
(6) lugares
Gabinete empotrado opcional
Gabinete opcional montado en la superfi cie
Orifi cio de la pared: 62 cm (24-1/2 pulg.)
de ancho x 72 cm (28-1/2 pulg.) de alto
EFX 60/S19-2200 Instalación
18 4-19-11 Bradley Corporation • 215-1289 Mod. L; ES 10-09-018
2
Conecte las tuberías de suministro e instale el termómetro
3
Ajuste la temperatura con el agua corriendo
Cuando las válvulas de retención
estén en la posición abierta
(funcionando), el tornillo de la
cubierta del vástago de cierre o
retención debe estar alineado con
la tapa de la válvula.
Revise si hay fi ltraciones,
presurizando la unidad
LENTAMENTE.
Instale el termómetro usando
sellador para tubos o cinta de
tefl ón.
Revise la temperatura cuando se alcance aproximadamente
a 38 LPM (10 GPM) de caudal de agua (equivalente a dos
lavados faciales)
Tornillo de
cubierta ranurada
Tornillo de cubierta de
cierre y retención
Tuerca de tope
de retención
Tapón de recirculación
de agua
Termómetro
Agua temperada
(para el accesorio)
CALIENTE
FRÍA
Tornillo de
cubierta ranurada
Tornillo de ajuste
de temperatura
C
H
4
Unidad de prueba
Corte el suministro de agua caliente cerrando la válvula de entrada de agua caliente o la válvula de retención de suministro. Con el
suministro de agua caliente cerrado, verifi que que siga fl uyendo agua fría. Si el agua fría fl uye correctamente, vuelva a abrir el suministro de
agua caliente.
Corte el suministro de agua fría cerrando la válvula de entrada de agua fría o la válvula de retención de suministro. Con el suministro de
agua fría cerrado, verifi que que se haya detenido el fl ujo de agua caliente. Si se detiene el agua caliente, vuelva a abrir el suministro de agua
fría. Revise la unidad semanalmente para verifi car el funcionamiento apropiado y el ajuste deseado de la temperatura.
¡NO SE SALTE ESTE PASO!
Se debe revisar la temperatura fi nal de este dispositivo y ajustarla, según sea
necesario. La confi guración estándar de la temperatura predeterminada de
fábrica es 29 °C (85 °F). [el rango de la válvula es de 18 °C a 35 °C (65 °F a
95 °F)]. Consulte a las autoridades médicas o de seguridad correspondientes
sobre la temperatura óptima recomendada para la aplicación en particular.
5/32 pulg. Llave Allen
Instalación EFX 60/S19-2200
Bradley Corporation • 215-1289 Mod. L; ES 10-09-018 4-19-11 19
5
Instalación de recirculación opcional de agua
Válvula de retención
(Típ.)
FRÍA
CALIENTE
Bajada de
trampa de calor
de 28 pulg.
Válvula de equilibrio (Típ.)
Calentador
de agua
Tanque de
almacenamiento
Flujo de agua temperada
Flujo de retorno
Interruptor de temperatura
Agua
temperada
recirculada
Bomba de recirculación
Agua fría
La recirculación del agua en el sistema proporciona regulación constante de la temperatura del agua. Purgue las tuberías de suministro
completamente antes de terminar la instalación. Cierre todos los accesorios y etiquételos como no disponibles para usarse durante el
proceso de recirculación.
1. Apague la bomba de recirculación y abra el suministro de agua en los accesorios de emergencia [se requiere un caudal de agua de 38 a 57 LPM
(10 a 15 GPM)].
2. Deje que el agua corra a través del sistema hasta que alcance una temperatura constante. Si no obtiene la temperatura necesaria, consulte el
paso N.º 3 en la página anterior para volver a ajustar la temperatura.
3. Tan pronto como el agua alcance la temperatura apropiada, encienda la bomba de recirculación (antes de proceder, asegúrese de que se haya
alcanzado la temperatura adecuada en el sistema).
4. Revise la temperatura del agua en la bomba de retorno. Si la temperatura excede el nivel apropiado en 1,1 °C (2 °F), ajuste el interruptor del
límite superior de temperatura (esto apagará la bomba). Espere hasta que la temperatura del agua de retorno esté a 2,8 °C (5 °F) por debajo del
nivel apropiado y ajuste el interruptor del límite inferior (esto volverá a encender la bomba).
5. Abra completamente la válvula de equilibrio.
6. Desconecte todos los accesorios y asegúrese de que no fl uya agua por el sistema (el tubo de entrada de agua fría debe sentirse tibio al tacto).
7. Deje que el sistema funcione sin agua durante 30 minutos o más. Si, después de treinta minutos, aumenta la temperatura del agua, puede volver
a ajustar la temperatura cerrando lentamente la válvula de equilibrio hasta que se alcance la temperatura adecuada.
Recirculación alterna (menos
de 19 LPM (5 GPM)
EFX 60/S19-2200 Instalación
20 4-19-11 Bradley Corporation • 215-1289 Mod. L; ES 10-09-018
Solución de problemas de la válvula mezcladora termostática
Problema Causa Solución
Filtraciones externas en el
sistema
Es posible que se hayan dañado las juntas NPT o las
juntas tóricas.
Reemplace las juntas NPT o las juntas tóricas, donde sea necesario. Para el
reemplazo de las juntas tóricas, comuníquese con el representante local de
Bradley y consulte por el kit (S65-177) de sellos de juntas tóricas.
No fl uye agua caliente (fl uye
solamente agua fría)
Falló el termostato y, en consecuencia, se enganchó la
retención de seguridad.
Inspección del termostato:
1. Retire la tapa superior y saque la varilla de empuje y el termostato.
2. Inserte una barra de 7/16 pulg. diá. en el fuelle del termostato.
3. Marque la longitud del fuelle del termostato [a temperatura ambiente,
con 44,5 N de fuerza (10 libras fuerza), la longitud del fuelle debe ser
aproximadamente de 6,7 cm (2-5/8 pulg.)].
4. Si la longitud del fuelle del termostato no está en el rango apropiado, se
debe reemplazar el termostato (no se puede reparar). Comuníquese con el
representante local de Bradley y consulte por el Kit (S65-178) del termostato.
Flujo limitado de agua Es posible que la entrada de la válvula de retención
esté parcialmente cerrada o haya disminuido
signifi cativamente la presión de agua.
Se acumuló suciedad y desechos en la rejilla o asiento
de retención, limitando el movimiento de cierre y
retenciones.
Limpie las válvulas de cierre y retención:
Retire el cierre y las retenciones, limpie la rejilla y el asiento y vuelva a
ensamblar la válvula. No retire el asiento. Los componentes se pueden
raspar con un destornillador para retirar los desechos. Un par de pinzas
funciona bien para sacar los desechos del asiento. Si es necesario
reemplazar el cierre y las retenciones, comuníquese con el representante
local de Bradley y consulte por el kit (S65-179) de retención/cierre.
Fluctuación de la
temperatura o temperatura
incorrecta
Las secciones de cierre y retención de la válvula no se
mueven libremente.
Limpie las válvulas de cierre y retención como se describe anteriormente.
El termostato lentamente comienza a fallar. Revise el termostato como se describe anteriormente o reemplácelo.
La tubería de suministro de entrada hacia la válvula
mezcladora se comparte con otras piezas del equipo
que se usan solamente en forma periódica, tales como
aparatos de lavandería o estaciones de fl ujo. Esto puede
reducir la presión de entrada hacia la válvula mezcladora
a menos de 0,7 bar (10 PSI). Es posible que el tamaño
de la tubería de suministro no sea lo sufi cientemente
grande para dar suministro a la válvula y a los otros
aparatos.
Aumente el tamaño de la tubería de suministro, vuelva a confi gurar la tubería
de suministro o regule el uso del suministro.
La recirculación no está equilibrada. Revise la instalación de la recirculación en la página 19.
El pistón no se mueve libremente y se debe limpiar. Consulte la página siguiente para ver las instrucciones de desensamble y
limpieza.
Antes de intentar solucionar problemas de la válvula o
desensamblar los componentes, revise lo siguiente:
Que las válvulas de cierre o retención estén
completamente abiertas (el vástago ranurado debe estar
alineado con la tapa de cierre o retención) y que estén
abiertas todas las válvulas de retención de entrada y
salida
Que los tubos de entrada de agua caliente y fría estén
conectados correctamente y que no existan conexiones
cruzadas ni válvulas de cierre o retención con filtraciones.
La salida del calentador de agua esté al menos a 8,3 °C
(15 °F) por sobre la temperatura establecida.
Asegúrese de cerrar las válvulas de retención
correspondientes antes de desensamblar la válvula,
y vuelva a abrir las válvulas después de completar la
inspección y la reparación.
Válvula de cierre y
retención
Asiento de la
válvula
Filtro de cierre y
retención
Instalación EFX 60/S19-2200
Bradley Corporation • 215-1289 Mod. L; ES 10-09-018 4-19-11 21
C
Si la varilla se desplaza menos de 12,7 mm (1/2 pulg.), el
pistón no se mueve libremente dentro del revestimiento y
se deben limpiar:
1. Retire el conjunto de la sección de control, la tapa
superior y el termostato.
2. Desenrosque el revestimiento desde la tapa (si está
pegado; se deben retirar las juntas tóricas y se debe
aplicar calor para derretir el pegamento y soltar el
revestimiento).
3. Limpie el pistón y el revestimiento con cualquier
limpiador adecuado para bronce y acero inoxidable (se
puede utilizar papel de lija grano 400 para pulir y afinar
el pistón y el revestimiento).
Solución de problemas: Desensamble y limpieza del pistón
Para evitar lesiones, use el equipo adecuado de
protección para los ojos y para la piel cuando use
soplete de propano.
Termostato
Tapa superior
con varilla de empuje
Varilla de
7/16 pulg.
Cámara de
sobrecalentamiento
del pistón
La segunda marca en
la varilla debe estar
12,7 mm (1/2 pulg.)
más arriba que la
primera marca.
B
Inserte una varilla de 7/16 pulg. de diá. en la válvula y
en la cámara de sobrecalentamiento del pistón. Marque
la longitud de la varilla dentro de la válvula. Empuje la
varilla hasta que se detenga el pistón y marque la nueva
longitud.
D
Empuje el mecanismo hacia arriba y hacia abajo varias
veces para asegurarse de que el pistón se mueva
suave y constantemente. Si es constante, repita el
Procedimiento C hasta que se mueva libremente o
cámbielo. Comuníquese con el representante local de
Bradley y consulte por el Kit del pistón y revestimientos
(número de pieza S65-180).
A
Retire la tapa superior de la válvula y saque la varilla de
empuje y luego el termostato. Se puede usar un alicates
de punta de aguja para retirar el termostato desde el
cuerpo de la válvula.
EFX 60/S19-2200 Instalación
22 4-19-11 Bradley Corporation • 215-1289 Mod. L; ES 10-09-018
Artículo Cantidad Descripción
4 1 Arandela
9 1 Arandela
32 2 Sello
33 2 Arandela
45 1 Arandela
Kit S65-311 de arandelas y sellos
Artículo Cantidad Descripción
2 1 Junta tórica
10 1 Junta tórica
12 1 Junta tórica
17 1 Junta tórica
18 1 Junta tórica
19 1 Junta tórica
21 1 Junta tórica
26 2 Junta tórica
28 2 Junta tórica
36 2 Junta tórica
Kit S65-177 de juntas tóricas
Artículo Cantidad Descripción
25 2 Tapa
26 2 Junta tórica
27 2 Vástago
28 2 Junta tórica
29 2 Filtro
30 1 Resorte de
suministro de
agua caliente
31 2 Soporte
(para sello)
32 2 Sello
33 2 Arandela
34 2 Tuerca
35 2 Asiento
36 2 Junta tórica
47 1 Resorte de
suministro de
agua fría (azul)
Kit S65-359 de retención/cierre
Artículo Cantidad Descripción
15 1 Termostato
17 1 Junta tórica
21 1 Junta tórica
Kit S65-178 del termostato
Artículo Cantidad Descripción
2 1 Junta tórica
3 1 Revestimiento
4 1 Arandela
5 1 Tornillo
6 1 Resorte
7 1 Cámara inferior
de sobre-
calentamiento
8 1 Resorte
9 1 Arandela
10 1 Junta tórica
11 1 Pistón
12 1 Junta tórica
13 1 Cámara superior
de sobre-
calentamiento
14 1 Asiento superior
45 1 Arandela
Kit S65-180 del pistón y revestimientos
Artículo Cantidad Descripción
2 1 Junta tórica
3 1 Revestimiento
4 1 Arandela
5 1 Tornillo
6 1 Resorte
7 1 Cámara inferior de
sobrecalentamiento
8 1 Resorte
9 1 Arandela
10 1 Junta tórica
11 1 Pistón
12 1 Junta tórica
13 1 Cámara superior de
sobrecalentamiento
14 1 Asiento superior
15 1 Termostato
16 1 Varilla de empuje
17 1 Junta tórica
18 1 Junta tórica
19 1 Junta tórica
20 1 Tapa de la válvula
mezcladora
21 1 Junta tórica
22 1 Tapa de control
23 1 Tornillo de ajuste
24 1 Tornillo
45 1 Arandela
Kit S65-305 de la sección central
Números de kit para acabado de bronce áspero y termostato
de rango estándar. Comuníquese con Bradley para consultar
por otras confi guraciones.
El resorte de suministro de agua fría
está marcado con pintura azul. NO LO
INTERCAMBIE POR EL RESORTE DE
SUMINISTRO DE AGUA CALIENTE (30).
Tubo de bronce (3/4 pulg. IPS)Cuerpo de la válvula
Termómetro
Desglose de piezas
36
29
35
46

Transcripción de documentos

Installation EFX 60/S19-2200 Thermostatic Mixing Valve with Optional Cabinet Robinet thermostatique mélangeur avec armoire en option S19-2200 Válvula mezcladora termostática con armario opcional Table of Contents Supplies Required..................................................... Installation Instructions ............................................. Dimensions ............................................................... Optional Equipment Installation ................................ Troubleshooting ......................................................... 2 2 3 5 6 Sommaire Fournitures requises ................................................. 9 Instructions relatives à l’installation........................... 9 Dimensions ............................................................. 10 Installation de l’équipement optionnel ..................... 12 Dépannage ............................................................. 13 Tabla de contenidos EFX60/P/RS Inlet Connections: 1" NPT Outlet Connection: 1-1/4" NPT Temperature Range: 65 – 95°F Maximum Pressure: 125 PSI Inlet Temperature Hot: 120 – 180° F Inlet Temperature Cold: 33 – 80° F Minimum Temperature Differential (from valve set point): 20° F 215-1289 Rev. L; EN 10-09-018 © 2011 Bradley Corporation Page 1 of 22 4-11-2011 Materiales necesarios ............................................. Instrucciones de instalación .................................... Dimensiones ........................................................... Instalaciones de equipos opcionales ...................... Solución de problemas ........................................... Raccords d’arrivée : 1 po NPT Raccord de sortie : 1-1/4 po NPT Plage de température : 65 – 95 °F Pression maximum : 125 lb/po2 Température d’arrivée, eau chaude : 120 – 180 °F Température d’arrivée, eau froide : 33 – 80 °F Différence de température minimum (à partir de valeur de consigne de robinet) : 20 °F 16 16 17 19 20 Conexiones de entrada: NPT de 1 pulg. Conexión de salida: NPT de 1-1/4 pulg. Rango de temperaturas: 65 – 95 °F Presión máxima: 125 PSI Temperatura de entrada, caliente: 120 – 180 °F Temperatura de entrada, fría: 33 – 80 °F Diferencial de temperatura mínima (desde el punto de ajuste de la válvula): 20 °F P.O. Box 309, Menomonee Falls, WI 53052-0309 Phone: 1.800.BRADLEY Fax: 262.253.4161 bradleycorp.com EFX 60/S19-2200 Installation IMPORTANT! Read this entire installation manual to ensure proper installation. When finished with the installation, file this manual with the owner or maintenance department. Compliance and conformity to local codes and ordinances is the responsibility of the installer. Installation Packing List IS TH SIDE UP • • • • Separate parts from packaging and make sure all parts are accounted for before discarding packaging material. If any parts are missing, do not begin installation until you obtain the missing parts. Make sure that all water supply lines have been flushed and then completely turned off before beginning installation. Debris in supply lines can cause valves to malfunction. Product warranties may be found under “Products” on our web site at bradleycorp.com. Supplies recommended for installation • Lockable shut-off on the outlet if tempered water is supplied to one or more emergency fixtures • Lockable shut-off on the inlets/supplies • (6) 3/8" wall anchors and fasteners for surface-mounted cabinet • (4) 1/4" fasteners (and wall anchors, if necessary) for recess-mounted cabinet • Unions on all connections to facilitate removal of valve Tools required for temperature adjustment • 5/32" Allen wrench • Blade screwdriver 1 Install Optional Cabinet (If not installing cabinet, skip to Step 2) Recessed Cabinet: Surface-Mounted Cabinet: 1. Rough-in wall opening 24-1/2" W x 28-1/2". 1. Measure and mark the cabinet mounting hole locations at the dimensions shown on next page. Install six 3/8" wall anchors (supplied by installer). 2. Insert the cabinet and secure to wall with four 1/4" fasteners properly anchored (supplied by installer.) 3. Install two anchors and screws through the valve bracket in back of the cabinet into a secure brace (supplied by installer) or into wall. This will support the valve. 4. Install the valve nipples and one-half of the union ball valve using pipe sealant or teflon tape. Install the other half of the union ball valve onto inlet and outlet pipe. 5. Insert the valve into the bracket in the cabinet (right side goes in first). Continue with the valve installation procedure. 2. Position the cabinet onto the wall and secure into place with six 3/8" wall fasteners (supplied by installer). 3. Install the valve nipples and one-half of the union ball valve using pipe sealant or teflon tape. Then install the other half of the union ball valve onto the inlet and outlet piping. 4. Insert the valve into the bracket in the cabinet (right side of the valve goes in first). Continue with the valve installation procedure. 6. Position the wall flange tight to the wall and caulk in place. 2 4-19-2011 Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 Installation EFX 60/S19-2200 (mm) Optional Recessed Cabinet Front View Side View Wall Flange 22-3/4" (578) Door 10-3/16" (259) 2" (51) 2-1/4" (57) 1-1/4" NPT Outlet 2-1/2" (64) Union Ball Valve 5" (127) 26-3/4" (679) Door 28" (711) Nipple 18" (457) 30" (762) 2-1/2" (64) 7-5/8" (194) 8-3/4" (222) 2" (51) 6-1/2" (165) 0.28" Dia. Holes (4) each side, (8) Total 26" (660) 1" NPT Inlets Bottom View Wall Opening: 24-1/2" W x 28-1/2" H 24" (610) Optional Surface-Mounted Cabinet 10-3/16" (259) 22-3/4" (578) Door 2-1/4" (57) 1-1/4" NPT Outlet 2-1/2" (64) Union Ball Valve 26-3/4" (679) Door 28" (711) Nipple Mounting Hole Locations 5-1/8" (130) 2-1/2" (64) 7-5/8" (194) 8-3/4" (222) 1" NPT Inlets 9-3/4" (248) 0.47 Dia. Holes (6) Places 6-1/2" (165) 24" (610) 9-3/16" (233) 24" (610) Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 2" 2" (51) (51) 4-19-2011 20" (508) 3 EFX 60/S19-2200 2 Installation Connect Supply Lines and Install Thermometer Slotted Cover Screw Tempered Water (to Fixture) When the check valves are in the open (operating) position, the cover screw for the stop/check stem will be flush with the valve cap. Check Stop Nut Stop/Check Cover Screw Water Recirculation Plug Install Thermometer using pipe sealant or teflon tape. Thermometer Check for leaks by pressurizing unit SLOWLY. HOT COLD 3 Adjust Temperature with Water Running Check the temperature when approximately 10 GPM water flow is reached (equivalent to two face washes) Slotted Cover Screw 5/32" Allen Wrench This device must be checked for final temperature and adjusted as necessary. The standard preset factory temperature setting is 85°F (29°C). [the range of the valve is 65°F – 95°F (18°C – 35°C)]. Consult proper medical and/or safety authorities for the optimum temperature recommended for your particular application. H C Temperature Set Screw 4 Test Unit DO NOT SKIP THIS STEP!!! Shut the hot water supply off by closing hot water inlet valve or supply check valve. While the hot water supply is turned off, check to make sure the cold water continues to flow. If the cold water is flowing properly, reopen the hot water supply. Shut the cold water supply off by closing the cold water inlet valve or supply check valve. While the cold water supply is off, check to make sure that the hot water flow has shut down. If hot water is shut down, reopen cold water supply. Test unit weekly for proper function and desired set temperature. 4 4-19-2011 Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 Installation 5 EFX 60/S19-2200 Optional Water Recirculation Setup Recirculating the water in the system provides constant regulation of the water temperature. Flush the supply lines thoroughly after completing installation. Close off all fixtures and label them as not available for use during the recirculating process. Check Valve (Typ) Tempered Water Flow COLD Cold Water Alternate Recirculation (less than 5 GPM) Heat Trap 28" Drop Temperature Switch Recirculated Tempered Water HOT Return Flow Balancing Valve (Typ) Recirculating Pump Water Heater Storage Tank 1. Turn off the recirculating pump and turn on the water supply at emergency fixture (a water flow rate of 10-15 GPM is required). 2. Let the water run through the system until a consistent temperature is obtained. If you do not obtain the required temperature, refer to step #3 on previous page for temperature readjustment. 3. As soon as the water reaches the proper temperature, turn on the recirculating pump (make certain the proper system temperature has been achieved before proceeding). 4. Check the water temperature at the return pump. If the temperature exceeds the appropriate level by 2°F, adjust the temperature high-limit switch (this will turn off the pump). Wait until the return water temperature is 5°F below the appropriate level and adjust the low-limit switch (this will turn the pump back on). 5. Open the balancing valve completely. 6. Turn off all fixtures and make sure there is no water running through the system (the cold inlet pipe should feel warm to the touch). 7. Let the system run for 30 minutes or longer without water. If, after thirty minutes, the water temperature increases, you may readjust the temperature by slowly closing the balancing valve until the appropriate temperature is reached. Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 4-19-2011 5 EFX 60/S19-2200 Installation Troubleshooting Thermostatic Mixing Valve Stop/Check Valve Before attempting to troubleshoot the valve or disassemble the components, check for the following: • Stop/check valves are fully open (the slotted stem must be flush with the stop/check cap) and that all inlet and outlet shut-off valves are open • Hot and cold inlet pipes are connected properly, and that there are no cross-connections or leaking stop/check valves • Water heater output is at least 15° F above the set temperature. Be sure to close the appropriate shut-off valves prior to disassembly of the valve and reopen the valves after inspection and repair is complete. Stop/Check Strainer Valve Seat Problem Cause Solution External leaks in the system Either the NPT joints or the o-rings have been damaged. Replace the NPT joints and/or o-rings where necessary. For replacement of o-rings, contact your Bradley representative and ask for O-Ring Seal Kit (S65-177). No hot water flow (cold water flow only) The thermostat has failed and, subsequently, the safety shut-off has engaged. Limited water flow The inlet shut-off valve may be partially closed or there has been a significant decrease in water pressure. Inspect Thermostat: 1. Remove the top cap and pull out the push rod and thermostat. 2. Insert a 7/16" dia. rod into the thermostat bellows. 3. Mark the length of the thermostat bellows (at room temperature, with 10 lb. of force, the bellows length should be approx. 2-5/8"). 4. If the thermostat bellows length is not in the proper range, the thermostat must be replaced (it cannot be repaired). Contact your Bradley representative and ask for Thermostat Kit (S65-178). Temperature fluctuation or improper Temperature Dirt and debris have collected on the check screen or seat, limiting the movement of the stop and checks. Clean Stop and check Valves: Remove the stop and checks, clean the screen and seat and reassemble the valve. Do not remove the seat. The components may be scraped with a screwdriver to remove debris. A pair of tweezers works well for pulling debris out from the seat. If the stop and checks need to be replaced, contact your Bradley representative and ask for Check/Stop Kit (S65-179). The stop and check sections of the valve do not move freely. Clean Stop and Check Valves as described above. Thermostat is slowly failing. Check Thermostat as described above, or replace. Inlet supply line to the mixing valve is being shared by other pieces of equipment that are used only periodically, such as laundry appliances or washdown stations. It may reduce the inlet pressure to the mixing valve to less than 10 PSI. The supply line size may not be large enough to supply both the valve and the other appliances. Enlarge the supply line size, reconfigure the supply line or regulate the supply usage. Recirculation is not balanced. Review recirculation set up on page 5. Piston does not move freely and must be cleaned. See next page for piston disassembly and cleaning directions. 6 4-19-2011 Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 Installation EFX 60/S19-2200 Troubleshooting: Piston Disassembly and Cleaning To prevent injuries, use proper protective equipment for eyes and skin when using a propane torch. A Remove the valve’s top cap and pull out the push rod and then the thermostat. You may use a needle-nose pliers to remove the thermostat from the valve body if desired. B Insert a 7/16" dia. rod into the valve and into the piston overheat chamber. Mark the length of the rod inside the valve. Push the rod until the piston stops and mark the new length. C If the rod travels less than1/2", the piston is not moving freely within the liner and they must be cleaned: 1. Remove the control section assembly, top cap and thermostat. 2. Unthread the liner from the cap (it is glued together; the o-rings must be removed and heat should be applied to melt the glue and loosen the liner). 3. Clean the piston and liner with any cleaner suitable for brass and stainless steel (400-grit sandpaper may be used to polish and hone the piston and liner). Top Cap with Pushrod Thermostat 7/16" Rod D Piston Overheat Chamber Push the mechanism up and down several times to make sure the piston moves smoothly and consistently. If it is not consistent, repeat Procedure C until it moves freely, or replace. Contact your Bradley representative and ask for Piston/Liner Kit (part number S65-180). Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 The second mark should be 1/2" higher on the rod than the first mark. 4-19-2011 7 EFX 60/S19-2200 Installation Parts Breakdown 46 29 Cold Supply Spring is marked with blue paint. DO NOT SWITCH WITH HOT SUPPLY SPRING (30). 35 Thermometer 36 Valve Body Brass Pipe (3/4" IPS) Center Section Kit S65-305 Thermostat Kit S65-178 Item 15 17 21 Qty. 1 1 1 Description Thermostat O-Ring O-Ring Piston & Liner Kit S65-180 8 Item 2 3 4 5 6 7 Qty. 1 1 1 1 1 1 8 9 10 11 12 13 1 1 1 1 1 1 14 45 1 1 Description O-Ring Liner Washer Screw Spring Lower Overheat Chamber Spring Washer O-Ring Piston O-Ring Upper Overheat Chamber Upper Seat Washer Kit numbers for rough brass finish and standard range thermostat. Contact Bradley for other configurations. Washer/Seal Kit S65-311 Item 4 9 32 33 45 Qty. 1 1 2 2 1 Description Washer Washer Seal Washer Washer O-Ring Kit S65-177 Item 2 10 12 17 18 19 21 26 28 36 Qty. 1 1 1 1 1 1 1 2 2 2 4-19-2011 Description O-Ring O-Ring O-Ring O-Ring O-Ring O-Ring O-Ring O-Ring O-Ring O-Ring Check/Stop Kit S65-359 Item 25 26 27 28 29 30 Qty. 2 2 2 2 2 1 31 2 32 33 34 35 36 47 2 2 2 2 2 1 Description Cap O-Ring Stem O-Ring Strainer Hot Supply Spring Holder (for Seal) Seal Washer Nut Seat O-Ring Cold Supply Spring (Blue) Item 2 3 4 5 6 7 Qty. 1 1 1 1 1 1 8 9 10 11 12 13 1 1 1 1 1 1 14 15 16 17 18 19 20 21 22 23 24 45 1 1 1 1 1 1 1 1 1 1 1 1 Description O-Ring Liner Washer Screw Spring Lower Overheat Chamber Spring Washer O-Ring Piston O-Ring Upper Overheat Chamber Upper Seat Thermostat Pushrod O-Ring O-Ring O-Ring Mixing Valve Cap O-Ring Control Cap Set Screw Screw Washer Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 Installation EFX 60/S19-2200 IMPORTANT ! Lire ce manuel d’installation dans son intégralité pour garantir une installation appropriée. Une fois celle-ci terminée, classer ce manuel auprès du service à la clientèle ou d’entretien. L’installateur est responsable de respecter la conformité aux codes et ordonnances locaux. Installation Packing List IS TH SIDE UP • • • • Séparer les pièces de l’emballage et veiller à bien avoir toutes les pièces avant de jeter le matériau d’emballage. Le cas échéant, ne pas commencer l’installation avant d’avoir obtenu les pièces manquantes. Veiller à bien vidanger et fermer toutes les conduites d’eau avant de commencer l’installation. Tout débris dans les conduites d’alimentation risque de provoquer un mauvais fonctionnement des soupapes. Les garanties du produit se trouvent sous la rubrique « Products » (Produits) sur notre site Web à bradleycorp.com Fournitures requises pour l’installation : • Robinet d’arrêt verrouillable sur la sortie en cas d’alimentation d’eau tempérée vers un ou plusieurs appareils d’urgence • Robinet d’arrêt verrouillable sur les arrivées/alimentations • (6) Ancrages muraux et fixations 3/8 po pour armoire montée en surface • (4) Fixations 1/4 po (et ancrages muraux, si nécessaire) pour armoire encastrée • Raccords sur toutes les connexions pour faciliter la dépose du robinet Outils requis pour réglage de température • Clé Allen 5/32 po • Tournevis à lame 1 Installer l’armoire en option (si l’installation d’une armoire n’est pas requise, passer à l’étape 2). Armoire encastrée : Armoire montée en surface : 1. Ouverture murale pour plomberie brute 62 cm L x 72 cm (24-1/2 po L x 28-1/2 po). 1. Mesurer et marquer les emplacements des trous de montage de l’armoire selon les dimensions indiquées à la page suivante. Installer six ancrages muraux de 3/8 po (fournis par l’installateur). 2. Insérer l’armoire et la fixer au mur avec quatre fixations 1/4 po adéquatement ancrées (fournies par l’installateur). 3. Installer deux ancrages et vis à travers le support de robinet à l’arrière de l’armoire et dans un contrevent sécuritaire (fourni par l’installateur) ou dans un mur. Cela soutiendra le robinet. 4. Installer les raccords filetés du robinet et la moitié du clapet à bille du raccord en utilisant un produit d’étanchéité pour tuyaux ou du ruban téflon. Installer l’autre moitié du clapet à bille du raccord sur le tuyau d’entrée et de sortie. 2. Positionner l’armoire dans le mur et fixer en place avec six fixations murales de 3/8 po (fournies par l’installateur). 3. Installer les raccords filetés du robinet et la moitié du clapet à bille du raccord en utilisant un produit d’étanchéité pour tuyaux ou du ruban téflon. Puis installer l’autre moitié du clapet à bille du raccord sur le tuyau d’entrée et de sortie. 4. Insérer le robinet dans le support dans l’armoire (le côté droit du robinet entre en premier). Continuer avec la procédure d’installation du robinet. 5. Insérer le robinet dans le support dans l’armoire (le côté droit entre en premier). Continuer avec la procédure d’installation du robinet. 6. Positionner la rosace murale tout contre le mur et colmater en place. Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 4-19-11 9 EFX 60/S19-2200 Installation (mm) Armoire encastrée en option Vue de face Vue latérale Rosace murale 22-3/4 po (578) Porte 10-3/16 po (259) 2 po (51) 2-1/4 po (57) 1-1/4 po NPT Sortie 2-1/2 po (64) Clapet à bille pour raccord 5 po (127) 26-3/4 po (679) Porte 28 po (711) Raccord 18 po (457) 30 po (762) 2-1/2 po (64) 7-5/8 po (194) 8-3/4 po (222) 2 po (51) 6-1/2 po (165) 0,28 po Dia. Trous (4) de chaque côté, (8) Total 26 po (660) 1 po NPT Entrées Vue de dessous Ouverture murale : 24-1/2 po L x 28-1/2 po H 24 po (610) Armoire montée en surface en option 10-3/16 po (259) 22-3/4 po (578) Porte 2-1/4 po (57) 1-1/4 po NPT Sortie 2-1/2 po (64) Clapet à bille pour raccord 26-3/4 po (679) Porte 28 po (711) Raccord fileté Emplacement des trous de montage 5-1/8 po (130) 2-1/2 po (64) 7-5/8 po (194) 8-3/4 po (222) 1 po NPT Entrées 9-3/4 po (248) 0,47 Dia. Trous (6) Emplacements 6-1/2 po (165) 24 po (610) 9-3/16 po (233) 24 po (610) 10 4-19-11 2 po (51) 2 po (51) 20 po (508) Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 Installation 2 EFX 60/S19-2200 Connecter les conduites d’alimentation et installer le thermostat Vis d’obturation à fente Eau tempérée (vers appareil) Lorsque les clapets de non-retour sont en position ouvert (en fonctionnement), la vis d’obturation pour la tige arrêt/nonretour sera égale avec le capuchon du robinet. Installer le thermostat en utilisant un produit d’étanchéité pour tuyaux ou du ruban téflon. Écrou Nonretour Arrêt Vis d’obturation arrêt/non-retour Bouchon de recirculation d’eau Thermomètre Vérifier la présence de fuites en pressurisant l’unité LENTEMENT. CHAUD FROID 3 Régler la température avec l’eau qui s’écoule Vérifier la température lorsque le débit d’eau atteint environ 10 GPM (équivalent de deux douches faciales) Vis d’obturation à fente 5/32 po Clé Allen Cet appareil doit être vérifié pour sa température finale et ajusté si nécessaire. Le réglage de température standard préréglé en usine est à 29 °C (85 °F). [la plage du robinet va de 18 °C – 35 °C (65 °F – 95 °F)]. Consulter les autorités médicales et/ou de sécurité appropriées pour connaître la température optimale recommandée pour l’application en question. 4 Tester unité H C Vis de réglage de température NE PAS SAUTER CETTE ÉTAPE !!! Fermer l’arrivée d’eau chaude en fermant le robinet d’arrivée d’eau chaude ou le clapet de non-retour. Pendant que l’alimentation d’eau chaude est coupée, vérifier que le débit d’eau froide continue de s’écouler. Si l’eau froide circule correctement, rouvrir l’alimentation d’eau chaude. Fermer l’arrivée d’eau froide en fermant le robinet d’arrivée d’eau froide ou le clapet de non-retour. Pendant que l’alimentation d’eau froide est coupée, vérifier que le débit d’eau chaude s’est arrêté. Si l’eau chaude est arrêtée, rouvrir l’alimentation d’eau froide. Tester l’unité chaque semaine pour s’assurer d’un bon fonctionnement et d’un réglage de température désiré. Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 4-19-11 11 EFX 60/S19-2200 5 Installation Configuration de recirculation d’eau optionnelle Recirculer l’eau dans le système offre une régulation constante de la température de l’eau. Rincer les conduites d’alimentation complètement après avoir complété l’installation. Fermer tous les appareils et les identifier comme non disponibles pour utilisation durant le processus de recirculation. Clapet de non-retour (Typ) Débit d’eau tempérée FROID Eau froide Recirculation alternative (moins de 19 l/min [5 gal/min]) Piège à chaleur Descente 28 po Interrupteur de température Eau tempérée recirculée CHAUD Robinet d’équilibrage (Typ) Écoulement restitué Pompe de recirculation Chauffe-eau Réservoir de stockage 1. Fermer la pompe de recirculation et ouvrir l’alimentation en eau au niveau de l’appareil d’urgence (un débit d’eau de 38-57 l/min [10-15 gal/min] est requis). 2. Laisser l’eau circuler à travers le système jusqu’à ce qu’une température constante soit obtenue). Si vous n’obtenez pas la température requise, consulter l’étape 3 à la page précédente pour un réajustement de la température. 3. Aussitôt que la température adéquate de l’eau est atteinte, ouvrir la pompe de recirculation (s’assurer que la température adéquate ait été atteinte avant de poursuivre). 4. Vérifier la température de l’eau au niveau de la pompe de retour. Si la température dépasse le niveau approprié par 1,1 °C (2 °F), ajuster l’interrupteur de limite supérieure de température (cela fermera la pompe). Attendre que la température de retour d’eau soit 2,8 °C (5 °F) sous le niveau approprié et ajuster l’interrupteur de limite inférieure (cela rouvrira la pompe). 5. Ouvrir complètement le robinet d’équilibrage. 6. Fermer tous les appareils et s’assurer qu’il n’y a pas d’eau qui circule à travers le système (le tuyau d’arrivée d’eau froide devrait être chaud au toucher). 7. Laisser le système fonctionner pendant 30 minutes ou plus sans eau. Si, après 30 minutes, la température de l’eau augmente, vous pour pouvez rajuster la température en fermant lentement le robinet d’équilibrage jusqu’à ce que la température appropriée soit atteinte. 12 4-19-11 Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 Installation EFX 60/S19-2200 Dépannage du robinet mélangeur thermostatique Robinetterie arrêt/ non-retour Avant d’essayer de dépanner le robinet ou de démonter les composants, vérifier ce qui suit : • Les clapets d’arrêt/non-retour sont complètement ouverts (la tige à fente doit être égale avec le capuchon d’arrêt/ non-retour) et que les robinets d’arrêt d’arrivée et de sortie sont ouverts Crépine Arrêt/ Non-retour • Les canalisations d’arrivée chaude et froide sont correctement raccordées et il n’existe ni de raccordements croisés ni de fuite de clapets arrêt/nonretour. • La sortie du chauffage d’eau est d’au moins 8,3 °C (15 °F) au dessus de la température réglée. S’assurer de fermer les robinets d’arrêt adéquats avant de démonter le robinet et de les rouvrir après inspection et une fois la réparation terminée. Siège du robinet Problème Cause Solution Fuites externes dans le système Les joints NPT ou les joints toriques ont été endommagés. Remplacer les joints NPT et/ou joints toriques le cas échéant. Pour tout remplacement de joints toriques, contacter le représentant Bradley et lui demander un Kit de joint torique (référence S65-177). Aucun débit d’eau chaude (débit d’eau froide seulement) Le thermostat est défectueux et donc le dispositif d’arrêt automatique de sécurité s’est enclenché. Vérifier le thermostat : Débit d’eau limité Le robinet d’arrêt d’arrivée est possiblement fermé partiellement ou il y a eu une diminution significative au niveau de la pression d’eau. 2. Insérer une tige de 7/16 po de diamètre dans le soufflet du thermostat. 1. Enlever le capuchon supérieur et retirer la tige de culbuteur et le thermostat. 3. Marquer la course du soufflet du thermostat (à la température de la pièce, avec une force de 10 lb, la course du soufflet devrait être d’environ 6,7 cm [2-5/8 po]). 4. Si la course du soufflet du thermostat n’est pas dans la plage appropriée, le thermostat doit être remplacé (il ne peut pas être réparé). Contacter le représentant Bradley et lui demander un Kit de thermostat (S65-178). Température d’eau inadéquate ou fluctuation de température. La saleté et les débris se sont accumulés sur le siège ou le tamis des clapets d’arrêt/de non-retour, ce qui limite le mouvement de ces derniers. Nettoyer les clapets d’arrêt et de non-retour : Les sections arrêt/non-retour du robinet ne se déplacent pas librement. Nettoyer les clapets d’arrêt et de non-retour tel que décrit ci-dessus. Le thermostat commence à être défectueux. Vérifier le thermostat tel que décrit ci-dessus, ou remplacer. La conduite d’alimentation d’arrivée vers le robinet mélangeur est partagé par les autres machines qui sont utilisées uniquement périodiquement, telles que les machines à laver ou les stations à siphon directe. Cela peut diminuer la pression d’arrivée au robinet mélangeur à moins de 0,7 bar (10 lb/po2). La taille de la conduite d’alimentation peut ne pas être suffisamment large pour alimenter à la fois le robinet et les autres appareils ménagers. Agrandir la taille de la conduite d’alimentation, reconfigurer la conduite d’alimentation ou réguler l’usage d’alimentation. La recirculation n’est pas équilibrée. Réviser la configuration de la recirculation à la page 12. Le piston ne se déplace pas librement et doit être nettoyé. Consulter la page suivante pour le démontage du piston et des instructions de nettoyage. Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 Enlever ces derniers, nettoyer le tamis et le siège et remonter le robinet. Ne pas enlever le siège. Gratter les composants avec un tournevis pour enlever les débris. Des pincette peuvent être utilisées pour enlever les débris du siège. Pour remplacer les clapets d’arrêt/de non-retour, contacter le représentant Bradley et demander un Kit de clapet d’arrêt/de non-retour (référence S65-179). 4-19-11 13 EFX 60/S19-2200 Installation Dépannage : Démontage du piston et nettoyage Afin de prévenir les blessures, utiliser de l’équipement de protection approprié pour les yeux et la peau lorsque vous utilisez un chalumeau à propane. A Enlever le capuchon supérieur et retirer la tige de culbuteur puis le thermostat. Vous pouvez utiliser des pinces à becs fins pour enlever le thermostat du corps du robinet si désiré. B Insérer une tige de 7/16 po de diamètre dans le robinet et dans la chambre de surchauffe du piston. Marquer la longueur de la tige à l’intérieur du robinet. Pousser la tige jusqu’à ce que le piston arrête et marquer la nouvelle longueur. Capuchon supérieur avec poussoir Thermostat Si la tige se déplace de moins de 12,7 mm (1/2 po), le piston ne se déplace pas librement en dedans du revêtement et doit être nettoyé : 1. Retirer l’ensemble section de contrôle, le capuchon supérieur et le thermostat. C 2. Enlever le revêtement du capuchon (il est collé ensemble; les joints toriques doivent être enlevés et de la chaleur doit être appliquée pour faire fondre la colle et desserrer le revêtement). 3. Nettoyer le piston et le revêtement avec tout nettoyant approprié pour du cuivre ou de l’acier inoxydable (du papier sablé grosseur 400 peut être utilisé pour polir et affuter le piston et le revêtement). Tige 7/16 po D 14 Pousser le mécanisme en haut et en bas plusieurs fois pour s’assurer que le piston se déplace librement et de façon constante. Si non constant, répéter la Procédure C jusqu’à satisfaction, ou remplacer. Contacter votre représentant Bradley et lui demander un Kit de Piston/ Revêtement (référence S65-180). 4-19-11 La seconde marque doit être 12,7 mm (1/2 po) plus haute sur la tige que la première marque. Chambre de surchauffe du piston Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 Installation EFX 60/S19-2200 Liste des pièces 46 Le ressort d’alimentation en eau froide est identifié avec de la peinture bleue. NE PAS CHANGER AVEC LE RESSORT D’ALIMENTATION EN EAU CHAUDE (30). 29 35 Thermomètre 36 Corps de robinet Tuyau en laiton (3/4 po IPS) Trousse portion centrale S65-305 Kit Thermostat S65-178 Repère Qté Désignation 15 17 21 1 1 1 Thermostat Joint torique Joint torique Kit Piston et Revêtement S65-180 Repère Qté 2 3 4 5 6 7 1 1 1 1 1 1 8 9 10 11 12 13 1 1 1 1 1 1 14 45 1 1 Désignation Joint torique Gaine Rondelle Vis Ressort Chambre de surchauffe inférieure Ressort Rondelle Joint torique Piston Joint torique Chambre de surchauffe supérieure Siège supérieur Rondelle Numéros de trousse pour la finition laiton brut et le thermostat standard. Contacter Bradley pour toute autre configuration. Repère Qté 2 3 4 5 6 7 1 1 1 1 1 1 8 9 10 11 12 13 1 1 1 1 1 1 14 15 16 17 18 19 20 1 1 1 1 1 1 1 21 22 1 1 23 24 45 1 1 1 Kit Rondelle/Joint S65-311 Repère 4 9 32 33 45 Qté 1 1 2 2 1 Désignation Rondelle Rondelle Joint Rondelle Rondelle Kit Joint torique S65-177 Repère 2 10 12 17 18 19 21 26 28 36 Qté 1 1 1 1 1 1 1 2 2 2 Désignation Joint torique Joint torique Joint torique Joint torique Joint torique Joint torique Joint torique Joint torique Joint torique Joint torique Bradley Corporation • 215-1289 Rév. L ; FR 10-09-018 Kit Arrêt/Non-retour S65-359 Repère Qté 25 26 27 28 29 30 2 2 2 2 2 1 31 2 32 33 34 35 36 47 2 2 2 2 2 1 Désignation Capuchon Joint torique Tige Joint torique Crépine Ressort alimentation en eau chaude Support (pour Joint) Joint Rondelle Écrou Siège Joint torique Ressort alimentation en eau froide (Bleu) 4-19-11 Désignation Joint torique Gaine Rondelle Vis Ressort Chambre de surchauffe inférieure Ressort Rondelle Joint torique Piston Joint torique Chambre de surchauffe supérieure Siège supérieur Thermostat Poussoir Joint torique Joint torique Joint torique Capuchon du robinet mélangeur Joint torique Capuchon de commande Vis calante Vis Rondelle 15 EFX 60/S19-2200 Instalación ¡IMPORTANTE! Lea en su totalidad este manual de instalación para garantizar una instalación adecuada. Al completar la instalación, entregue este manual al propietario o al Departamento de Mantenimiento. Es responsabilidad del instalador cumplir a cabalidad los códigos y las ordenanzas locales. Installation Packing List IS TH SIDE UP • • • • Saque las piezas del embalaje y asegúrese de haberlas sacado todas antes de desecharlo. Si falta alguna pieza, no comience la instalación hasta obtenerla. Asegúrese de purgar todas las tuberías de suministro de agua y que estén completamente cerradas antes de comenzar la instalación. Los desechos acumulados en las tuberías de suministro pueden provocar defectos en el funcionamiento de las válvulas. Las garantías del producto se pueden encontrar en la sección “Products” (Productos) del sitio Web, bradleycorp.com. Materiales recomendados para la instalación • Cierre bloqueable en la salida si se suministra agua temperada a uno o más accesorios de emergencia • Cierre bloqueable de las entradas o de los suministros • (6) anclajes y sujetadores de pared de 3/8 pulg. para el gabinete montado en la superficie • (4) sujetadores de 1/4 pulg. (y anclajes de pared, si fuera necesario) para el gabinete empotrado • Uniones en todas las conexiones para facilitar el retiro de la válvula Herramientas necesarias para el ajuste de temperatura • Llave Allen de 5/32 pulg. • Destornillador de paleta 1 Instale el gabinete opcional (si no va a instalar el gabinete, siga con el Paso 2) Gabinete empotrado: Gabinete montado en la superficie: 1. Orificio de colocación en la pared de 62 cm (24-1/2 pulg.) de ancho x 72 cm (28-1/2 pulg.). 1. Mida y marque la ubicación de los orificios de montaje del gabinete en las dimensiones que se muestran en la siguiente página. Instale seis anclajes de pared de 3/8 pulg. (proporcionados por el instalador). 2. Inserte y fije el gabinete con cuatro sujetadores de 1/4 pulg. (proporcionado por el instalador) anclados apropiadamente a la pared. 3. Instale los dos anclajes y tornillos a través del soporte de la válvula en la parte trasera del gabinete en una abrazadera firme (proporcionada por el instalador) o en la pared. Esto soportará la válvula. 4. Instale los niples de la válvula y la mitad de la válvula de bolas de la unión, usando sellador para tubos o cinta de teflón. Instale la otra mitad de la válvula de bolas de la unión en el tubo de entrada y salida. 5. Inserte la válvula en el soporte del gabinete (primero el lado derecho). Continúe con el procedimiento de instalación de la válvula. 2. Ponga el gabinete en la pared y fíjelo en su lugar con seis sujetadores de pared de 3/8 pulg. (proporcionados por el instalador). 3. Instale los niples de la válvula y la mitad de la válvula de bolas de la unión, usando sellador para tubos o cinta de teflón. Luego, instale la otra mitad de la válvula de bolas de la unión en el tubo de entrada y salida. 4. Inserte la válvula en el soporte del gabinete (primero el lado derecho de la válvula). Continúe con el procedimiento de instalación de la válvula. 6. Ponga firmemente la brida de pared en la pared y aplique masilla para fijarla en su lugar. 16 4-19-11 Bradley Corporation • 215-1289 Mod. L; ES 10-09-018 Instalación EFX 60/S19-2200 Gabinete empotrado opcional (mm) Vista frontal 10-3/16 pulg. (259) Vista lateral 22-3/4 pulg. (578) Puerta Brida de pared 2 pulg. (51) 2-1/4 pulg. (57) Salida de NPT de 1-1/4 pulg. 2-1/2 pulg. (64) 5 pulg. (127) Válvula de bolas de la unión 26-3/4 pulg. (679) Puerta 28 pulg. (711) Niple 18 pulg. (457) 30 pulg. (762) 2-1/2 pulg. (64) 7-5/8 pulg. (194) 8-3/4 pulg. (222) 26 pulg. (660) 2 pulg. (51) 6-1/2 pulg. (165) 0,28 pulg. de diá. Orificios (4) a cada lado, (8) Total Entradas de NPT de 1 pulg. Vista inferior Orificio de la pared: 62 cm (24-1/2 pulg.) de ancho x 72 cm (28-1/2 pulg.) de alto 24 pulg. (610) Gabinete opcional montado en la superficie 10-3/16 pulg. (259) 22-3/4 pulg. (578) Puerta 2-1/4 pulg. (57) Salida de NPT de 1-1/4 pulg. 2-1/2 pulg. (64) Válvula de bolas de la unión 26-3/4 pulg. (679) Puerta 28 pulg. (711) Niple Ubicación de los orificios de montaje 5-1/8 pulg. (130) 2-1/2 pulg. (64) 7-5/8 pulg. (194) 8-3/4 pulg. (222) Entradas de NPT de 1 pulg. 9-3/4 pulg. (248) 0,47 de diá. Orificios (6) lugares 6-1/2 pulg. (165) 24 pulg. (610) 9-3/16 pulg. (233) 24 pulg. (610) Bradley Corporation • 215-1289 Mod. L; ES 10-09-018 2 pulg. (51) 4-19-11 2 pulg. (51) 20 pulg. (508) 17 EFX 60/S19-2200 2 Instalación Conecte las tuberías de suministro e instale el termómetro Tornillo de cubierta ranurada Agua temperada (para el accesorio) Cuando las válvulas de retención estén en la posición abierta (funcionando), el tornillo de la cubierta del vástago de cierre o retención debe estar alineado con la tapa de la válvula. Instale el termómetro usando sellador para tubos o cinta de teflón. Tuerca de tope de retención Tornillo de cubierta de cierre y retención Tapón de recirculación de agua Termómetro Revise si hay filtraciones, presurizando la unidad LENTAMENTE. CALIENTE FRÍA 3 Ajuste la temperatura con el agua corriendo Revise la temperatura cuando se alcance aproximadamente a 38 LPM (10 GPM) de caudal de agua (equivalente a dos lavados faciales) Tornillo de cubierta ranurada 5/32 pulg. Llave Allen Se debe revisar la temperatura final de este dispositivo y ajustarla, según sea necesario. La configuración estándar de la temperatura predeterminada de fábrica es 29 °C (85 °F). [el rango de la válvula es de 18 °C a 35 °C (65 °F a 95 °F)]. Consulte a las autoridades médicas o de seguridad correspondientes sobre la temperatura óptima recomendada para la aplicación en particular. H C Tornillo de ajuste de temperatura 4 ¡NO SE SALTE ESTE PASO! Unidad de prueba Corte el suministro de agua caliente cerrando la válvula de entrada de agua caliente o la válvula de retención de suministro. Con el suministro de agua caliente cerrado, verifique que siga fluyendo agua fría. Si el agua fría fluye correctamente, vuelva a abrir el suministro de agua caliente. Corte el suministro de agua fría cerrando la válvula de entrada de agua fría o la válvula de retención de suministro. Con el suministro de agua fría cerrado, verifique que se haya detenido el flujo de agua caliente. Si se detiene el agua caliente, vuelva a abrir el suministro de agua fría. Revise la unidad semanalmente para verificar el funcionamiento apropiado y el ajuste deseado de la temperatura. 18 4-19-11 Bradley Corporation • 215-1289 Mod. L; ES 10-09-018 Instalación 5 EFX 60/S19-2200 Instalación de recirculación opcional de agua La recirculación del agua en el sistema proporciona regulación constante de la temperatura del agua. Purgue las tuberías de suministro completamente antes de terminar la instalación. Cierre todos los accesorios y etiquételos como no disponibles para usarse durante el proceso de recirculación. Válvula de retención (Típ.) Flujo de agua temperada FRÍA Agua fría Recirculación alterna (menos de 19 LPM (5 GPM) Bajada de trampa de calor de 28 pulg. Interruptor de temperatura Agua temperada recirculada CALIENTE Flujo de retorno Válvula de equilibrio (Típ.) Bomba de recirculación Calentador de agua Tanque de almacenamiento 1. Apague la bomba de recirculación y abra el suministro de agua en los accesorios de emergencia [se requiere un caudal de agua de 38 a 57 LPM (10 a 15 GPM)]. 2. Deje que el agua corra a través del sistema hasta que alcance una temperatura constante. Si no obtiene la temperatura necesaria, consulte el paso N.º 3 en la página anterior para volver a ajustar la temperatura. 3. Tan pronto como el agua alcance la temperatura apropiada, encienda la bomba de recirculación (antes de proceder, asegúrese de que se haya alcanzado la temperatura adecuada en el sistema). 4. Revise la temperatura del agua en la bomba de retorno. Si la temperatura excede el nivel apropiado en 1,1 °C (2 °F), ajuste el interruptor del límite superior de temperatura (esto apagará la bomba). Espere hasta que la temperatura del agua de retorno esté a 2,8 °C (5 °F) por debajo del nivel apropiado y ajuste el interruptor del límite inferior (esto volverá a encender la bomba). 5. Abra completamente la válvula de equilibrio. 6. Desconecte todos los accesorios y asegúrese de que no fluya agua por el sistema (el tubo de entrada de agua fría debe sentirse tibio al tacto). 7. Deje que el sistema funcione sin agua durante 30 minutos o más. Si, después de treinta minutos, aumenta la temperatura del agua, puede volver a ajustar la temperatura cerrando lentamente la válvula de equilibrio hasta que se alcance la temperatura adecuada. Bradley Corporation • 215-1289 Mod. L; ES 10-09-018 4-19-11 19 EFX 60/S19-2200 Instalación Solución de problemas de la válvula mezcladora termostática Válvula de cierre y retención Antes de intentar solucionar problemas de la válvula o desensamblar los componentes, revise lo siguiente: • Que las válvulas de cierre o retención estén completamente abiertas (el vástago ranurado debe estar alineado con la tapa de cierre o retención) y que estén abiertas todas las válvulas de retención de entrada y salida Filtro de cierre y retención • Que los tubos de entrada de agua caliente y fría estén conectados correctamente y que no existan conexiones cruzadas ni válvulas de cierre o retención con filtraciones. • La salida del calentador de agua esté al menos a 8,3 °C (15 °F) por sobre la temperatura establecida. Asegúrese de cerrar las válvulas de retención correspondientes antes de desensamblar la válvula, y vuelva a abrir las válvulas después de completar la inspección y la reparación. Asiento de la válvula Problema Causa Solución Filtraciones externas en el sistema Es posible que se hayan dañado las juntas NPT o las juntas tóricas. Reemplace las juntas NPT o las juntas tóricas, donde sea necesario. Para el reemplazo de las juntas tóricas, comuníquese con el representante local de Bradley y consulte por el kit (S65-177) de sellos de juntas tóricas. No fluye agua caliente (fluye solamente agua fría) Falló el termostato y, en consecuencia, se enganchó la retención de seguridad. Inspección del termostato: Flujo limitado de agua Es posible que la entrada de la válvula de retención esté parcialmente cerrada o haya disminuido significativamente la presión de agua. 2. Inserte una barra de 7/16 pulg. diá. en el fuelle del termostato. 1. Retire la tapa superior y saque la varilla de empuje y el termostato. 3. Marque la longitud del fuelle del termostato [a temperatura ambiente, con 44,5 N de fuerza (10 libras fuerza), la longitud del fuelle debe ser aproximadamente de 6,7 cm (2-5/8 pulg.)]. 4. Si la longitud del fuelle del termostato no está en el rango apropiado, se debe reemplazar el termostato (no se puede reparar). Comuníquese con el representante local de Bradley y consulte por el Kit (S65-178) del termostato. Fluctuación de la temperatura o temperatura incorrecta 20 Se acumuló suciedad y desechos en la rejilla o asiento de retención, limitando el movimiento de cierre y retenciones. Limpie las válvulas de cierre y retención: Las secciones de cierre y retención de la válvula no se mueven libremente. Limpie las válvulas de cierre y retención como se describe anteriormente. El termostato lentamente comienza a fallar. Revise el termostato como se describe anteriormente o reemplácelo. La tubería de suministro de entrada hacia la válvula mezcladora se comparte con otras piezas del equipo que se usan solamente en forma periódica, tales como aparatos de lavandería o estaciones de flujo. Esto puede reducir la presión de entrada hacia la válvula mezcladora a menos de 0,7 bar (10 PSI). Es posible que el tamaño de la tubería de suministro no sea lo suficientemente grande para dar suministro a la válvula y a los otros aparatos. Aumente el tamaño de la tubería de suministro, vuelva a configurar la tubería de suministro o regule el uso del suministro. La recirculación no está equilibrada. Revise la instalación de la recirculación en la página 19. El pistón no se mueve libremente y se debe limpiar. Consulte la página siguiente para ver las instrucciones de desensamble y limpieza. 4-19-11 Retire el cierre y las retenciones, limpie la rejilla y el asiento y vuelva a ensamblar la válvula. No retire el asiento. Los componentes se pueden raspar con un destornillador para retirar los desechos. Un par de pinzas funciona bien para sacar los desechos del asiento. Si es necesario reemplazar el cierre y las retenciones, comuníquese con el representante local de Bradley y consulte por el kit (S65-179) de retención/cierre. Bradley Corporation • 215-1289 Mod. L; ES 10-09-018 Instalación EFX 60/S19-2200 Solución de problemas: Desensamble y limpieza del pistón Para evitar lesiones, use el equipo adecuado de protección para los ojos y para la piel cuando use soplete de propano. A Retire la tapa superior de la válvula y saque la varilla de empuje y luego el termostato. Se puede usar un alicates de punta de aguja para retirar el termostato desde el cuerpo de la válvula. B Inserte una varilla de 7/16 pulg. de diá. en la válvula y en la cámara de sobrecalentamiento del pistón. Marque la longitud de la varilla dentro de la válvula. Empuje la varilla hasta que se detenga el pistón y marque la nueva longitud. Tapa superior con varilla de empuje Termostato Si la varilla se desplaza menos de 12,7 mm (1/2 pulg.), el pistón no se mueve libremente dentro del revestimiento y se deben limpiar: 1. Retire el conjunto de la sección de control, la tapa superior y el termostato. C 2. Desenrosque el revestimiento desde la tapa (si está pegado; se deben retirar las juntas tóricas y se debe aplicar calor para derretir el pegamento y soltar el revestimiento). 3. Limpie el pistón y el revestimiento con cualquier limpiador adecuado para bronce y acero inoxidable (se puede utilizar papel de lija grano 400 para pulir y afinar el pistón y el revestimiento). Varilla de 7/16 pulg. D Cámara de sobrecalentamiento del pistón Empuje el mecanismo hacia arriba y hacia abajo varias veces para asegurarse de que el pistón se mueva suave y constantemente. Si es constante, repita el Procedimiento C hasta que se mueva libremente o cámbielo. Comuníquese con el representante local de Bradley y consulte por el Kit del pistón y revestimientos (número de pieza S65-180). Bradley Corporation • 215-1289 Mod. L; ES 10-09-018 La segunda marca en la varilla debe estar 12,7 mm (1/2 pulg.) más arriba que la primera marca. 4-19-11 21 EFX 60/S19-2200 Instalación Desglose de piezas 46 El resorte de suministro de agua fría está marcado con pintura azul. NO LO INTERCAMBIE POR EL RESORTE DE SUMINISTRO DE AGUA CALIENTE (30). 29 35 Termómetro 36 Cuerpo de la válvula Tubo de bronce (3/4 pulg. IPS) Kit S65-305 de la sección central Kit S65-178 del termostato Artículo 15 17 21 Cantidad 1 1 1 Números de kit para acabado de bronce áspero y termostato de rango estándar. Comuníquese con Bradley para consultar por otras configuraciones. Descripción Termostato Junta tórica Junta tórica Artículo 2 3 4 5 6 7 Cantidad 1 1 1 1 1 1 8 9 10 11 12 13 1 1 1 1 1 1 14 15 16 17 18 19 20 1 1 1 1 1 1 1 21 22 23 24 45 1 1 1 1 1 Kit S65-180 del pistón y revestimientos Kit S65-311 de arandelas y sellos Artículo 2 3 4 5 6 7 22 Cantidad 1 1 1 1 1 1 8 9 10 11 12 13 1 1 1 1 1 1 14 45 1 1 Descripción Junta tórica Revestimiento Arandela Tornillo Resorte Cámara inferior de sobrecalentamiento Resorte Arandela Junta tórica Pistón Junta tórica Cámara superior de sobrecalentamiento Asiento superior Arandela Artículo 4 9 32 33 45 Cantidad 1 1 2 2 1 Descripción Arandela Arandela Sello Arandela Arandela Kit S65-177 de juntas tóricas Artículo 2 10 12 17 18 19 21 26 28 36 Cantidad 1 1 1 1 1 1 1 2 2 2 4-19-11 Descripción Junta tórica Junta tórica Junta tórica Junta tórica Junta tórica Junta tórica Junta tórica Junta tórica Junta tórica Junta tórica Kit S65-359 de retención/cierre Artículo 25 26 27 28 29 30 Cantidad 2 2 2 2 2 1 31 2 32 33 34 35 36 47 2 2 2 2 2 1 Descripción Tapa Junta tórica Vástago Junta tórica Filtro Resorte de suministro de agua caliente Soporte (para sello) Sello Arandela Tuerca Asiento Junta tórica Resorte de suministro de agua fría (azul) Descripción Junta tórica Revestimiento Arandela Tornillo Resorte Cámara inferior de sobrecalentamiento Resorte Arandela Junta tórica Pistón Junta tórica Cámara superior de sobrecalentamiento Asiento superior Termostato Varilla de empuje Junta tórica Junta tórica Junta tórica Tapa de la válvula mezcladora Junta tórica Tapa de control Tornillo de ajuste Tornillo Arandela Bradley Corporation • 215-1289 Mod. L; ES 10-09-018
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22

Bradley S19-2200 Installation Instructions Manual

Tipo
Installation Instructions Manual
Este manual también es adecuado para

en otros idiomas