80 in. Hang Track
203,2 cm Rail Horizontal
203,2 cm Riel Horizontal
01-11318-12
2836
WARNING MISE EN GARDE ADVERTENCIA
• Failure to obey installation
instructions and warnings can
result in injury or death.
• Use correct hardware for wall type.
When using standards with hang
track, standards must be secured
to the wall. Do not overload.
• Ne pas se conformer aux directives d’installation
et aux consignes de sécurité peut occasionner des
blessures ou même la mort.
• Utilisez le matériel de fixation convenant au type
de mur. Lorsque vous utilisez des rails verticaux
avec rails horizontaux, les rails verticaux dovient
être fixés solidement au mur. Ne pas surcharger.
• Puede causar herida y hasta la muerte si no
se observan las instrucciones y advertencias
para la instalación del producto.
• Use el herraje que corresponda según el tipo
de pared. Cuando usando los rieles verticales
con los rieles horizontales, los rieles verticales
se deben fijar a la pared. No sobrecargue.
FOR STUD INSTALLATION: Secure to the wall with #12x2 in. pan head screws directly into studs.
FOR CONCRETE INSTALLATION: Drill 1/4 in. holes and insert #12 wall anchors. Secure to the wall using #12x2 in. pan head screws.
FOR DRYWALL INSTALLATION: Drill 1/2 in. holes. Remove toggle from bolt and insert bolt through hang track or standard. Then, re-attach toggle to bolt and insert toggle into wall.
Tighten bolt to secure to wall.
1. Install Hang Track: At desired height, level Hang Track with overhang positioned at top. Mark hole locations every 16 in. for studs and every 8 in. for concrete or drywall. Secure to wall.
2. Install Standards: Locate notched end of Standard. Place Standard onto Hang Track so notch fits over bottom rail. Space Standards no more than 24 in. apart.
3. Install Brackets: Insert Brackets into Standards at desired heights.
4. Install shelving: Position shelf so Bracket nose fits between wires on front of shelf. Push shelf back and position back wire behind hooks on back of Brackets. Press shelf down to lock into place.
5. Secure Standards: Locate and mark hole closest to center point of EACH Standard. Swing Standard to one side (DO NOT PULL STANDARDS AWAY FROM WALL.) and drill hole. For concrete and
drywall walls, install anchor or toggle. Reposition Standard back over hole and secure to wall.
Products of China
Produits de la Chine
Productos de China
© 2018 ClosetMaid LLC
Ocala, FL 34471
1-800-874-0008 (USA, Canada)
www.closetmaid.com