SharkBite NSWTAEXT1238Z Guía de instalación

Tipo
Guía de instalación
SWEAT VALVE WITH EXTENSION TUBE AND ESCUTCHEON
INSTALLATION INSTRUCTIONS
1. Turn o water supply, and
drain the line.
2. Cut copper square, or
remove existing valve, and
disconnect supply line.
3. Slide ange over extension
tube.
4. Clean copper tubing and
inside extension tube with
emery cloth.
5. Coat surfaces to be
soldered with ux.
6. Push extension tube over
copper pipe and align with
xture.
7. Heat joint until solder liquees and feed solder around edges of extension tube.
8. Wipe connection with damp cloth to clean and cool joint.
9. Connect supply line to stop valve and xture.
10.Turn on water and check connections.
Instrucciones de instalación:
Installation Instructions:
1. Cierre el suministro de agua y drene la línea.
2. Corte el cobre a cuadradro, o quite la válvula existente, y desconecte la línea
de suministro.
3. Deslice la brida sobre el tubo de extensión.
4. Limpie el tubo de cobre y el tubo de extensión interior con una tela de esmeril.
5. Cubra las supercies a soldar con fundente.
6. Empuje el tubo de extensión sobre el tubo de cobre y alinee con el accesorio.
7. Caliente la junta hasta que la soldadura se licúe y alimente la soldadura alrededor de
los bordes del tubo de extensión.
8. Limpie la conexión con un paño húmedo para limpiar y enfriar la junta.
9. Conecte la línea de suministro a la válvula de cierre y al accesorio.
10. Abra el agua y verique las conexiones.
Distributed by
Reliance Worldwide Corporation
®
1-877-700-4242
  • Page 1 1

SharkBite NSWTAEXT1238Z Guía de instalación

Tipo
Guía de instalación

En otros idiomas