Gibraltar Mailboxes DPKX0000 Instrucciones de operación

Tipo
Instrucciones de operación
GROUND LEVEL
GROUND LEVEL
STREET
INSTALLATION INSTRUCTIONS
FOR MODEL: DPKX
STREET
TOOLS REQUIRED:
HERRAMIENTAS REQUIRIERON:
WARNING: Check for underground pipes or cables
before installing anchor.
LA ADVERTENCIA: El cheque para cables o tubos
subterráneos antes de instalar la ancla.
FIG. 2
FIG. 1
1. ANCHOR INSTALLATION (FIG. 1)
Drive the anchor into the ground stopping when the top of hole in anchor
reaches ground level.
1. LA INSTALACIÓN DE ANCLA
(FIG. 1)
Martillar la ancla en el suelo parando cuando la cima de hoyo de ancla
suelo nivel.
Use 4 lb. or heavier sledge hammer when installing anchor.
Usar una cuatro libra o el martillo más pesado cuando instalando la ancla.
2. POST INSTALLATION (FIG. 2)
NOTE: Make sure one side of post is parallel to street. Position the post on
the anchor. Using a sledge hammer, gently drive the post to ground level
straightening the post as you hammer.
2. LA INSTALACIÓN DE POSTE
(FIG. 2)
LA NOTA: Asegurar un lado de poste es paralelo a la calle.
Ubicar el poste sobre la ancla. Usar una cuatro libra o el martillo más pesado,
suavemente martilla el poste para suelo nivel enderezando el poste
como martilla.
NOTE: Make sure
one side of post
is parallel to street.
LA NOTA: Asegurar
un lado de poste
es paralelo a
la calle.
GROUND LEVEL
GROUND LEVEL
APPROVED BY THE
POSTMASTER GENERAL
U. S.
MAIL
A
B
FIG. 4
FIG. 5
DPKX0055-03
MADE IN
U.S.A.
TAYLORSVILLE, MS 39168
5. MAILBOX INSTALLATION (FIG. 5)
Adjust brackets to fit mailbox base. Make sure distance “A” is equal to
distance “B” and attach brackets to arm with 2 (#10 x 1”) screws.
Attach mailbox to brackets with 4 (#10-24 x 1 1/2”) bolts and nuts.
5. LA INSTALACIÓN DE BUZÓN
(FIG. 5)
Ajustar paréntesis a la base de buzón. Asegurar distancia “A” está por valor
de la distancia “B” y adjunta paréntesis para armar con 2 (#10 x 1”) tornillos.
Adjuntar buzón a paréntesis con 4 (#10-24 x 1 1/2”) cerrojos y nueces.
FIG. 3
4. TOP POST ASSEMBLY
(FIG. 4)
Attach the top post to the bottom post assembly with the (3/8” x 3” ) dowel
screw by starting the dowel screw in both the top post and cross arm. By
twisting the top post clockwise, the dowel screw will thread into the top post
and then into the cross arm.
4. LA ASAMBLEA DE SUPERIOR POSTE
(FIG. 4)
Adjuntar los inferiores y superiores postes usa el (3/8” x 3” ) tornillo de clavija.
3. POST ASSEMBLY (FIG. 3)
Secure the cross arm to the post using the 2 (#8 x 2 1/2”) deck screws.
3. LA ASAMBLEA DE POSTE
(FIG. 3)
Adjuntar el brazo de cruz al poste que usa el 2 (#8 x 2 1/2”) cubierta atornilla.
  • Page 1 1
  • Page 2 2

Gibraltar Mailboxes DPKX0000 Instrucciones de operación

Tipo
Instrucciones de operación