English and Spanish Installation Instructions
Instant Mosaic
TM
- Peel and Stick Tile
1- Prepare the wall. Ensure it is clean, dry, flat, primed and free of dust.
o If the wall is damaged or uneven, additional construction adhesive should
be used.
2- Measure and plan the design. Mark starting tile position on the wall.
3- Cut the tile if needed.
4- Remove the film from the back of the tile.
o For cut pieces smaller than 3”x3”, apply some construction adhesive on the
edges ( 1” from the edges).
5- Place the tile against the substrate and firmly press over it.
6- Clean tiles with a soft cloth.
EKBInnovations assumes no responsibility or liability for improper installation,
misuse or misapplication of its products
Instant Mosaic
TM
- Azulejo Para Pelar y Adherir
1- Preparar la pared. Verificar que esté limpia, seca, plana, imprimada y sin polvo.
o Si la pared está dañada o no es uniforme, se deberá utilizar adhesivo de
construcción adicional.
2- Medir y planificar el diseño. Marcar la posición del azulejo inicial en la pared.
3- Cortar lo azulejo, si es necesario.
4- Retirar la película del dorso del azulejo.
o Para trozos menores de 3 "x 3", aplicar un poco de adhesivo de
construcción en los bordes (a 1 pulgada (2.54 cm) de los bordes).
5- Colocar el azulejo contra el sustrato y presionar firmemente sobre el mismo.
6- Limpiar los azulejos con un paño suave.
EKBInnovations no asume ninguna responsabilidad por la instalación
inadecuada, el mal uso o la mala aplicación de sus productos.