Kohler K-8360 Guía de instalación

Categoría
Artículos sanitarios
Tipo
Guía de instalación

Este manual también es adecuado para

Installation Guide
Deck-Mount Bath Filler
M product numbers are for Mexico (i.e. K-12345M)
Los números de productos seguidos de
M corresponden a México (Ej.
K-12345M)
Français, page “Français-1”
Español, página “Español-1”
K-8360
1082513-2-A
Tools and Materials
Before You Begin
Observe all local plumbing and building codes.
Shut off the water supply.
The valve is sold separately. Please read the instructions packed
with the valve for installation procedures.
Complete the finished deck material before installing the product.
Kohler Co. reserves the right to make revisions in the design of
faucets without notice, as specified in the Price Book.
Plus:
• Rags
1/8" Hex Wrench
1082513-2-A 2 Kohler Co.
1. Install the Spout
CAUTION: Risk of personal injury. Do not lean over the
pipe plug when turning or removing the plug. The lines may
be pressurized.
NOTICE: Keep the supply tube clean above the finished deck. This
will prevent damage to the O-ring seal (not shown) in the base of
the spout.
Remove the plaster guard (not shown) from the supply tube.
Wrap a rag around the pipe plug. This will prevent water from
spraying as the pipe plug is being removed.
Remove the pipe plug from the supply tube.
Slide the escutcheon up the spout.
Using a 1/8 hex wrench, back the setscrews off at the base of the
spout just enough to allow clearance for the supply tube.
Position the spout on the supply tube, then carefully press down
until the spout contacts the finished deck.
Align the spout as desired, then tighten the setscrews at the base.
Slide the escutcheon down the spout until it is flush with the
finished deck.
Spout
Escutcheon
Base
Pipe Plug
Setscrew
Supply Tube
Finished Deck
Kohler Co. 3 1082513-2-A
2. Complete the Installation
Install the handles following the handle manufacturer’s
installation instructions.
Remove the aerator.
Turn on the main water supply and check for leaks.
Turn on the hot and cold valves and run water through the spout
to remove debris. Check for leaks.
Turn off the hot and cold valves.
Reinstall the aerator.
Aerator
1082513-2-A 4 Kohler Co.
Guide d’installation
Remplisseur de baignoire sur comptoir
Outils et matériels
Avant de commencer
Respecter tous les codes de plomberie et de bâtiment locaux.
Couper l’alimentation d’eau.
La valve est vendue séparément. Veuillez s’il vous plait lire les
instructions d’installation emballées avec la valve.
Compléter le matériau du comptoir fini avant d’installer le
produit.
Kohler Co. se réserve le droit d’apporter toutes modifications au
design des robinets et ceci sans préavis, comme spécifié dans le
catalogue des prix.
Clé hexagonale de 1/8"
Plus:
• Chiffons
Kohler Co. Français-1 1082513-2-A
1. Installer le bec
ATTENTION : Risque de blessures corporelles. Ne pas se
pencher sur le bouchon du tube au moment de le tourner et
de le retirer. Les lignes peuvent être pressurisées.
AVIS : Tenir le tuyau d’alimentation bec propre au-dessus du
comptoir fini. Ceci préviendra un endommagement du joint torique
(non-illustré) à la base du bec.
Retirer le renfort de plâtre (non-illustré) du tube d’alimentation.
Envelopper un chiffon autour du bouchon du tuyau. Ceci
préviendra l’eau de jaillir lorsque le bouchon du tuyau est retiré.
Retirer le bonchon du tuyau d’alimentation.
Glisser l’applique sur le bec.
Avec une clé hexagonale de 1/8, reserrer les vis de retenue à la
base du bec juste assez pour permettre un espace pour le tuyau
d’alimentation.
Positionner le bec sur le tube d’alimentation, et presser
délicatement vers le bas jusqu’à ce que le bec touche le comptoir
fini.
Aligner le bec selon le désir et serrer les vis de retenue à la base.
Glisser l’applique dans le bec jusqu’à ce qu’elle soit à égalité avec
le comptoir fini.
Comptoir fini
Tuyau d'alimentation
Bouchon de tuyau
Vis de retenue
Base
Applique
Bec
1082513-2-A Français-2 Kohler Co.
2. Compléter l’installation
Installer les poignées en suivant les instructions d’installation du
fabricant.
Retirer l’aérateur.
Ouvrir l’alimentation d’eau principale et vérifier s’ilyades
fuites.
Ouvrir les valves d’eau chaude et froide et faire couler l’eau à
travers le bec pour chasser tous les débris. Vérifier s’ilyades
fuites.
Fermer les valves d’eau chaude et froide.
Réinstaller l’aérateur.
Aérateur
Kohler Co. Français-3 1082513-2-A
Guía de instalación
Llenador de bañera de montaje en cubierta
Herramientas y materiales
Antes de comenzar
Cumpla con todos los códigos locales de plomería y construcción.
Cierre el suministro principal de agua.
La válvula se vende por separado. Lea las instrucciones incluidas
con la válvula para obtener los procedimientos de instalación.
Termine el material de acabado de la cubierta antes de instalar el
producto.
Kohler Co. se reserva el derecho de modificar el diseño de la
grifería sin previo aviso, tal como se especifica en la lista de
precios.
Llave hexagonal de 1/8"
Más:
• Trapos
Kohler Co. Español-1 1082513-2-A
1. Instale el surtidor
PRECAUCIÓN: Riesgo de lesiones personales. Al girar o
retirar el tapón, no se incline sobre el tapón de tubo. Las
líneas pueden estar presurizadas.
AVISO: Mantenga el tubo de suministro limpio arriba de la cubierta
acabada. Esto evitará dañar el arosello (O-ring) (no se muestra) de la
base del surtidor.
Retire el protector de yeso (no se muestra) del tubo de suministro.
Envuelva el tapón de tubo en un trapo. Esto evitará que el agua
salpique al retirar el tapón de tubo.
Retire el tapón de tubo del tubo de suministro.
Deslice el chapetón hacia arriba del surtidor.
Con una llave hexagonal de 1/8, desatornille los tornillos de
fijación de la base del surtidor lo suficiente para que haya espacio
para el tubo de suministro.
Coloque el surtidor en el tubo de suministro, luego presione con
cuidado hacia abajo hasta que el surtidor esté en contacto con la
cubierta acabada.
Alinee el surtidor según se desee, luego apriete los tornillos de
fijación de la base.
Deslice el chapetón en el surtidor hasta que esté al ras con la
cubierta acabada.
Tapón de tubo
Tubo de suministro
Cubierta acabada
Tornillo de fijación
Base
Chapetón
Surtidor
Kohler Co. Español-2 1082513-2-A
2. Termine la instalación
Instale las manijas siguiendo las instrucciones de instalación del
fabricante de la manija.
Quite el aireador.
Abra el suministro principal de agua y verifique que no haya
fugas.
Abra las válvulas del agua fría y caliente y deje correr el agua por
el surtidor para eliminar los residuos. Verifique que no haya
fugas.
Cierre las válvulas del agua fría y caliente.
Vuelva a instalar el aireador.
Aireador
1082513-2-A Español-3 Kohler Co.
1082513-2-A
USA: 1-800-4-KOHLER
Canada: 1-800-964-5590
México: 001-877-680-1310
kohler.com
©2007 Kohler Co.
1082513-2-A

Transcripción de documentos

Installation Guide Deck-Mount Bath Filler K-8360 M product numbers are for Mexico (i.e. K-12345M) Los números de productos seguidos de M corresponden a México (Ej. K-12345M) Français, page “Français-1” Español, página “Español-1” 1082513-2-A Tools and Materials 1/8" Hex Wrench Plus: • Rags Before You Begin Observe all local plumbing and building codes. Shut off the water supply. The valve is sold separately. Please read the instructions packed with the valve for installation procedures. Complete the finished deck material before installing the product. Kohler Co. reserves the right to make revisions in the design of faucets without notice, as specified in the Price Book. 1082513-2-A 2 Kohler Co. Spout Escutcheon Base Pipe Plug Supply Tube Setscrew Finished Deck 1. Install the Spout CAUTION: Risk of personal injury. Do not lean over the pipe plug when turning or removing the plug. The lines may be pressurized. NOTICE: Keep the supply tube clean above the finished deck. This will prevent damage to the O-ring seal (not shown) in the base of the spout. Remove the plaster guard (not shown) from the supply tube. Wrap a rag around the pipe plug. This will prevent water from spraying as the pipe plug is being removed. Remove the pipe plug from the supply tube. Slide the escutcheon up the spout. Using a 1/8″ hex wrench, back the setscrews off at the base of the spout just enough to allow clearance for the supply tube. Position the spout on the supply tube, then carefully press down until the spout contacts the finished deck. Align the spout as desired, then tighten the setscrews at the base. Slide the escutcheon down the spout until it is flush with the finished deck. Kohler Co. 3 1082513-2-A Aerator 2. Complete the Installation Install the handles following the handle manufacturer’s installation instructions. Remove the aerator. Turn on the main water supply and check for leaks. Turn on the hot and cold valves and run water through the spout to remove debris. Check for leaks. Turn off the hot and cold valves. Reinstall the aerator. 1082513-2-A 4 Kohler Co. Guide d’installation Remplisseur de baignoire sur comptoir Outils et matériels Clé hexagonale de 1/8" Plus: • Chiffons Avant de commencer Respecter tous les codes de plomberie et de bâtiment locaux. Couper l’alimentation d’eau. La valve est vendue séparément. Veuillez s’il vous plait lire les instructions d’installation emballées avec la valve. Compléter le matériau du comptoir fini avant d’installer le produit. Kohler Co. se réserve le droit d’apporter toutes modifications au design des robinets et ceci sans préavis, comme spécifié dans le catalogue des prix. Kohler Co. Français-1 1082513-2-A Bec Applique Base Bouchon de tuyau Tuyau d'alimentation Vis de retenue Comptoir fini 1. Installer le bec ATTENTION : Risque de blessures corporelles. Ne pas se pencher sur le bouchon du tube au moment de le tourner et de le retirer. Les lignes peuvent être pressurisées. AVIS : Tenir le tuyau d’alimentation bec propre au-dessus du comptoir fini. Ceci préviendra un endommagement du joint torique (non-illustré) à la base du bec. Retirer le renfort de plâtre (non-illustré) du tube d’alimentation. Envelopper un chiffon autour du bouchon du tuyau. Ceci préviendra l’eau de jaillir lorsque le bouchon du tuyau est retiré. Retirer le bonchon du tuyau d’alimentation. Glisser l’applique sur le bec. Avec une clé hexagonale de 1/8″, reserrer les vis de retenue à la base du bec juste assez pour permettre un espace pour le tuyau d’alimentation. Positionner le bec sur le tube d’alimentation, et presser délicatement vers le bas jusqu’à ce que le bec touche le comptoir fini. Aligner le bec selon le désir et serrer les vis de retenue à la base. Glisser l’applique dans le bec jusqu’à ce qu’elle soit à égalité avec le comptoir fini. 1082513-2-A Français-2 Kohler Co. Aérateur 2. Compléter l’installation Installer les poignées en suivant les instructions d’installation du fabricant. Retirer l’aérateur. Ouvrir l’alimentation d’eau principale et vérifier s’il y a des fuites. Ouvrir les valves d’eau chaude et froide et faire couler l’eau à travers le bec pour chasser tous les débris. Vérifier s’il y a des fuites. Fermer les valves d’eau chaude et froide. Réinstaller l’aérateur. Kohler Co. Français-3 1082513-2-A Guía de instalación Llenador de bañera de montaje en cubierta Herramientas y materiales Llave hexagonal de 1/8" Más: • Trapos Antes de comenzar Cumpla con todos los códigos locales de plomería y construcción. Cierre el suministro principal de agua. La válvula se vende por separado. Lea las instrucciones incluidas con la válvula para obtener los procedimientos de instalación. Termine el material de acabado de la cubierta antes de instalar el producto. Kohler Co. se reserva el derecho de modificar el diseño de la grifería sin previo aviso, tal como se especifica en la lista de precios. Kohler Co. Español-1 1082513-2-A Surtidor Chapetón Base Tapón de tubo Tubo de suministro Tornillo de fijación Cubierta acabada 1. Instale el surtidor PRECAUCIÓN: Riesgo de lesiones personales. Al girar o retirar el tapón, no se incline sobre el tapón de tubo. Las líneas pueden estar presurizadas. AVISO: Mantenga el tubo de suministro limpio arriba de la cubierta acabada. Esto evitará dañar el arosello (O-ring) (no se muestra) de la base del surtidor. Retire el protector de yeso (no se muestra) del tubo de suministro. Envuelva el tapón de tubo en un trapo. Esto evitará que el agua salpique al retirar el tapón de tubo. Retire el tapón de tubo del tubo de suministro. Deslice el chapetón hacia arriba del surtidor. Con una llave hexagonal de 1/8″, desatornille los tornillos de fijación de la base del surtidor lo suficiente para que haya espacio para el tubo de suministro. Coloque el surtidor en el tubo de suministro, luego presione con cuidado hacia abajo hasta que el surtidor esté en contacto con la cubierta acabada. Alinee el surtidor según se desee, luego apriete los tornillos de fijación de la base. Deslice el chapetón en el surtidor hasta que esté al ras con la cubierta acabada. Kohler Co. Español-2 1082513-2-A Aireador 2. Termine la instalación Instale las manijas siguiendo las instrucciones de instalación del fabricante de la manija. Quite el aireador. Abra el suministro principal de agua y verifique que no haya fugas. Abra las válvulas del agua fría y caliente y deje correr el agua por el surtidor para eliminar los residuos. Verifique que no haya fugas. Cierre las válvulas del agua fría y caliente. Vuelva a instalar el aireador. 1082513-2-A Español-3 Kohler Co. 1082513-2-A USA: 1-800-4-KOHLER Canada: 1-800-964-5590 México: 001-877-680-1310 kohler.com ©2007 Kohler Co. 1082513-2-A
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12

Kohler K-8360 Guía de instalación

Categoría
Artículos sanitarios
Tipo
Guía de instalación
Este manual también es adecuado para